Amendment 1.doc

DOC document 43 KB Posted

Attached to
Solicitation: Patrick AFB and Cape Canaveral AFS Roofing Maintenance and Installation
Solicitation number
FA2521-08-R-0003
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Cover pages etc - IDIQ.doc DOC document
Attachment 3 - Wage Determination —
98K04383 - Submittal Register.xlsm XLSM spreadsheet
98K04383 —
FA2521-08-R-0003.docx DOCX document
Attachment 2 - Bid Schedule.xls XLS spreadsheet
IDIQ Roof Details.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001 ROOFING

A. The purpose of this amendment (01) is to clarify/amend several items in the solicitation. The clarifications are listed below from item 1 through 7.

1. Box 13 on the Solicitation, Offer and Award form 1442 on paragraph A, the time the proposals are due is changed From 12:00PM To 2:00PM. The date of September 5th, 2008 remains the same.

2. Section C – Descriptions and Specifications, the fifth paragraph titled: Cost Data Information is changed

From:

COST DATA INFORMATION

The offeror’s unit prices must contain all Contractor costs including but not limited to, mobilization, demobilization, overhead, profit, bond premiums, insurance, design cost, Subcontractor costs, and all contingencies with the contract, including supporting documentation/basis for all costs. No allowance whatsoever will be made later for any other purpose.

To:

COST DATA INFORMATION

The offeror’s unit prices must contain all Contractor costs including but not limited to, mobilization, demobilization, overhead, profit, insurance, design cost, Subcontractor costs, and all contingencies with the contract, including supporting documentation/basis for all costs. No allowance whatsoever will be made later for any other purpose. Bond premiums will be calculated and submitted as a separate line item on each task order when responding to a specific project.

3. Paragraph 5.3.2.5 on page 45 of the solicitation is changed From: Completed questionnaires should be submitted directly… To: Completed questionnaires will be submitted directly…

4. On paragraph 1.4 on page 40 of the solicitation, the position title of John R. Pollard is changed From: Contracting Officer To: Contracting Specialist.

5. On page 56 of the solicitation, the point of contact is changed From: Gary Hall To: John R. Pollard (john.pollard@patrick.af.mil). The phone number for the point of contact is changed From: 321-853-0874 To: 321-853-0879.

6. Paragraph 1.4.9 on page 63 of the solicitation is changed From:

If the lowest priced evaluated techically acceptable offer is judged to have a Substanntial Conficence performance confidence assessment that offer represents the best value for the government and the evaluaton process stops at this point. Award shall be made to that offeror without further consideraton of any other offers.

To:

The government reserves the right to award a contract to other than the lowest price offeror, if there is an offeror(s) with a better performance rating. In that event the contracting officer whall make an integrated assessement best value award decision.

7. On page 63, Table 3 Performance Confidence Assessments, under Descripton on the last block, remove the footnote (IG5.5.2.2).

B. All other terms and conditons remain unchanged and at no cost to any party.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 05-Sep-2008 12:00 PM to 05-Sep-2008 02:00 PM.

(End of Summary of Changes)