This file is a Request for Information (RFI) responses document for solicitation FA251726QA045, addressing contractor questions regarding a window tinting and blinds installation project at Cheyenne Mountain Space Force Station (CMSFS) in Colorado.
The project requires supply and installation of solar control window film on existing windows at Building 101 (Location 1) and Buildings 12001 and 12100 (Location 2), with an estimated 158 total windows in four size configurations (150 units at 60"H x 48"W, 4 units at 103"H x 44"W, 2 units at 60"H x 70"W, and 2 units at 28"H x 70"W). The film must be compatible with existing blast protective glass and comply with UFC 4-010-01 standards; security film is being omitted due to existing blast protection. Contractors must provide qualified, professionally trained personnel with basic background clearance for base access, with no crew size limit at Location 1 but a maximum of 5 personnel at Location 2. The contract completion deadline is 90 calendar days after date of award. The government will coordinate material and equipment logistics through 21 CES, handle furniture relocation with the occupying offices, and provide samples for review after award. All re-work due to improper installation will be at contractor expense. Furniture removal and high-window access arrangements will be finalized post-award, with non-removable pillars present in front of certain windows.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FA251726QA045 - 21 CES Window Tints & Blinds | |
| Contractor Questions | Customer Responses |
| The SOW provides the following estimated window sizes and quantities: |
150 – 60" H × 48" W
4 – 103" H × 44" W
2 – 60" H × 70" W
2 – 28" H × 70" W
| However, we do not see where the document identifies which of these windows are located at Location 1 (Building 101) versus Location 2 (Buildings 12001 and 12100). Could you please provide a breakdown showing which window sizes and quantities are associated with each building/location? We would also appreciate the dimensions of the half-lite door glass in Buildings 12001 and 12100, if those dimensions are not included in the inventory above. | See attachemnt 3: LOCATION 1 AND 2 WINDOW QUANTITIES AND DIMENSIONS | |
| Are all windows requiring tint included in the Window Inventory & Dimensions provided in the Statement of Work? | See attachemnt 3: LOCATION 1 AND 2 WINDOW QUANTITIES AND DIMENSIONS | |
| Are the quantities and dimensions listed in the Window Inventory & Dimensions accurate for all windows requiring tint? | See attachemnt 3: LOCATION 1 AND 2 WINDOW QUANTITIES AND DIMENSIONS | |
| For the high windows where permanent structures may restrict access, will the contractor be required to provide scaffolding or other access equipment? | yes | |
| The first floor on the left side looks like it is already tinted. Are we trying to match this? | no, per SOW after award samples will be provided for review | |
| The back side of 101 is already tinted. Are those meant to be part of the estimate for us to tint? If so, will we be removing the existing film and/or matching to what was already on there? | all of 101 has a blast protective layer no part has any tint darker/lighter than any other window, samples to be provided after award | |
| Are there any walls or pillars in front of any windows that are to be tinted? If so, will those be able to be removed? | there are pillars that are not removable | |
| How big of a crew can we have on this job site? | no limit for location 1 crew of 5 for location 2 any crew must able able to pass basic background check for base access | |
| What is the deadline for completion on this job? | 90 Calendar Days After Date of Award | |
| What types of training or orientations are required by installers to complete work onsite and approximately how long does that take? | contractor must supply qualified personnel and must be trained to contractor company standard for professional job, if the installer does not install correct all re work will be at the contractor expense | |
| Will furniture be moved off windows for when installation takes place? | after award contractor will verify what needs to be moved and 21 CES/occupying office will move | |
| What are the logistics to bring materials & lift up to each project site? | All materials will have a form 3000 and be submitted/approved all equipment needing to be brought on will be coordinated through 21 CES Shay Grint 719-474-2776 | |
| 1.1 states "solar control and security film on existing windows at Building 101" and 3.1.1 states "Premium Nano-Ceramic or Spectrally Selective Solar Film" for Location 1. Please confirm if a combination of solar+secuirty film is requested or just solar film. | ALL Tint must be compatible with the blast protective glass installed SEE SOW 1.2 and meet UFC 4-010-01 for installation at this time security film is being omitted as the windows already have blast protection | |
| If solar+security film is being requested, please confirm if IPA (3M Impact Protection Attachment) is required. This is a standard installation of security film and conflicts with 4.1.2. | see above statement | |
| Please confirm if there is to be lighting inside the guard shack that is brighter than the exterior lighting. Reflective films will only be reflective on the side with brighter light. If the light inside the guard shack is brighter than exterior tunnel light, the film will be reflective from the inside which is not desired. | Location 2 keeps light off most of the time, samples to be submitted per SOW |