Attachment 7 - Project Drawing ITB 1038 to ITB 893.pptx
PPTX presentation 3 MB Posted
- Attached to
- Peterson SFB OSP Phase III
- Solicitation number
- FA251725Q0063
About this file
This document is a two-sheet project drawing depicting a proposed 36-strand single mode fiber optic cable installation for Peterson Space Force Base (SFB) in Colorado. The drawing details specific installation routes and notes for conduit and fiber optic cable deployment between multiple maintenance holes (MH) and infrastructure buildings (ITB), including precise routing from ITB 1038 to ITB 893.
The associated federal contract opportunity (Solicitation Number FA251725Q0063) involves engineering, furnishing, installing, and testing (EFI&T) fiber optic cable infrastructure for the Department of the Air Force Space Command. The contractor will be responsible for providing all necessary equipment, materials, labor, and management to complete the fiber optic cable installation, adhering to TIA telecommunication installation standards. All equipment and materials must be new, and the project specifically requires installing 36-strand single mode fiber optic cable between specified infrastructure buildings on the base.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Drawing: Proposed 36-Strand SM from ITB 1038 to ITB 893 (Sheet 1 of 2)
ITB 1038
MH-702
MH-65
MH-701
MH-130B
MH-1038A
Not To Scale Existing Maintenance/Handhole
Existing Conduits Proposed 1x4” Conduit with Maxcell
INSTALLATION NOTES:
Install 1x4” conduit with Maxcell from MH-1038A to MH-1038B.
Install 1x4” conduit with Maxcell from MH-702cto MH-65.
Project Drawing: Proposed 36-Strand SM from ITB 1038 to ITB 893 (Sheet 2 of 2)
MH-29
MH-66
MH-30
Not To Scale Existing Maintenance/Handhole
Existing Conduits Proposed 1x4” Conduit with Maxcell
ITB 893
INSTALLATION NOTES:
Install 4” LB Type Building Entrance on the exterior wall of ITB 893.
Install 1x4” conduit with Maxcell from MH-30 to new 4” LB Connector on the exterior wall of ITB 893.
image1.png image2.png