RFI 4 Questions and Answers.docx

DOCX document 18 KB Posted

Attached to
Medium Voltage Dc Power Supply Breaker Control System Federal contract opportunity
Solicitation number
FA251724Q0029
Issued by
Department of the Air Force Space Command

About this file

This document contains the Questions and Answers related to Request for Information (RFI) 4 for Solicitation FA251724Q0029 for a Medium Voltage DC Power Supply Breaker System.

The key details are:

  • The contractor SetPoint Systems is the only authorized contractor to work on the Delta Controls Automation system in place. The government confirmed SetPoint should be utilized and their contact information is provided.
  • The government clarified the intended use of the system - the new units need to be able to charge the batteries either standalone or in parallel. However, the current system configuration may not allow one rectifier to charge both battery cabinets in the event of a rectifier failure. The government indicated they may provide an updated Statement of Work to address this.
  • This RFI is related to a combined synopsis/solicitation for a high voltage DC supply breaker control system at Cheyenne Mountain Space Force Station, which is a 100% Small Business Set-Aside under NAICS code 335999.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI 4

FA251724Q0029

Medium Voltage DC Power Supply Breaker System

1. The Government's response to question #5 is that the "Contractor shall utilize SetPoint as the Contractor for reconnecting and reprogramming units into the CMSFS BAS". Can the Government please confirm that this should be included in pricing? If so, please provide the point of contact information for SetPoint?

SetPoint Systems is the only contractor that is authorized to work on the Delta Controls Automation system that is in place.

Trey Sellers Account Manager Setpoint Systems Corporation tsellers@setpointsystems.com C: 720.387.1238 | O: 303.733.2300 24/7 Support: 1.800.372.8837 8167 SouthPark Circle, Littleton, CO 80120

2. The Government responded to RFI 1 #3 "SOW line item 1.2.2.3 indicates the function of the new units to be stand alone OR in parallel, please clarify the intended use for either stand alone and parallel." with the answer "The purpose of the system is to charge the batteries. By standalone, they need to be able to handle the load of charging the batteries on that floor. In parallel, they need to be able to charge the batteries on both floors." However, replacing the existing system will not allow both battery cabinets to be charged by only one DC charger/rectifier. If the intent is to truly have either rectifier charge both batteries due to one rectifier failure, then the SOW should be revised.

Can the Government please clarify if it will provide an updated SOW to account for this additional scope?

See the reasoning below for this question based on the excerpted diagrams from the Battery System One-Line drawings provided:

If one rectifier is isolated, that battery is also isolated, even if the DCPA and DCPB load distribution panels are tied together. In order to accomplish this, the batteries must be connected directly to DCPA and DCPB load distribution panels, which would require an additional 200AT breaker to be installed in both panels as it was before the last system update in 2014 according to the electrical drawings provided.

· NORMAL OPERATION:

· Rectifier A charging Battery A and feeding power to DCPA

· Rectifier B charging Battery B and feeding power to DCPB

· RECTIFIER A FAILURE:

· Tie both DCPA and DCPB together

· Rectifier B support both Battery A and Battery B as well as DCPA and DCPB

· RECTIFIER B FAILURE:

· Tie both DCPA and DCPB together

· Rectifier A support both Battery A and Battery B as well as DCPA and DCPB Currently the batteries are only connected to the Rectifiers and isolated from the distribution panels.

The 'Pre-2014 Demo One-Line.png' drawing (attached) shows the one-line drawing before the system was replaced in 2014 with the Always On systems. This configuration would allow one rectifier to support both battery cabinets and both DC load panels.

The 'Current One-Line.png' drawing attached) shows what changes were made in 2014 and how the batteries were moved to each rectifier, limiting the ability for either rectifier to support both battery strings.

The paralleling requirement will be accomplished via the tie between the two respective DC panels. Each DC power supply will be connected to the battery bank, and charge that bank alone, on the same floor as that system.