About this file
This document is a combined synopsis/solicitation for a firm-fixed price purchase order for electrical substation maintenance and repair services at Cheyenne Mountain Space Force Station in Colorado. The Department of the Air Force Space Command is seeking quotations from qualified small business contractors for a base period of 1 year with 4 option years. The contractor will be required to provide all labor, equipment, and materials necessary to inspect, perform annual maintenance, testing, and repairs on the substation in accordance with the Performance Work Statement.
Key details include: the solicitation number is FA2517-24-Q-0027, the NAICS code is 238210 with a $19M small business size standard, a site visit is scheduled for July 8, 2024, and all quotations must be submitted by July 25, 2024. The award will be made on a lowest price technically acceptable basis, and the Government reserves the right to award no contract at all. The solicitation includes specific technical evaluation factors related to work coordination, qualified technicians, relevant experience, and a mission essential plan.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 8 July Site Visit Minutes.pdf | ||
| Attachment 4. Experience Form.docx | DOCX document | |
| Attachment 1. Provisions and Clauses.pdf | ||
| Attachment 3. Contractor Submittal Form.docx | DOCX document | |
| Attachment 5. WD 2015-5417 Rev 26.pdf | ||
| Attachment 2. Performance Work Statement June 2024.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA251724Q0027 CMSFS Substation 8 July Site Visit Questions
1. How will the outage be scheduled for offline maintenance in Clin 4005?
A. Coordination is made with the City, two weeks prior to execution.
2. Will there be any time when both sides of the 34.5kV bus will be taken down, to allow for servicing the 34.5kv tie switch?
A. Yes, coordination with the contractor will be made, prior to time/duration/date and coordination with the city.
3. Can we service A side then B side in consecutive days?
A. Yes, with approved work plan from contractor and coordination with CSU.
4. For Clin X001, is this meant to be online visual/mechanical/infrared inspections only, with no offline work anticipated in this Clin?
A. No off-line work anticipated. If annual maintenance is conducted, then coordination with CSU will be required.
5. Is Primary Injection required?
A. No.