This performance work statement outlines requirements for a contractor to engineer, furnish, install, and test new fiber optic cable and duct bank infrastructure at Peterson Space Force Base. The project involves installing single-mode fiber optic cable and infrastructure between four buildings to enhance connectivity. Key requirements include installing new maintenance holes, hand-holes, duct banks, innerduct, equipment cabinets, fiber distribution panels, and terminating over 123,000 feet of single-mode fiber optic cable. The contractor must adhere to all applicable safety, security, and environmental standards and regulations. The period of performance will be determined based on the proposed schedule and contract award date. Work must be performed at Peterson Space Force Base during normal duty hours unless approved in advance.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS –FOC Expansion ITB 1038 – CEB 350, 845 and ITB 2025 – CEB 2027, 2028 2 September 2021
Page | 1
PERFORMANCE WORK STATEMENT (PWS)
for
Fiber Optic Cable Expansion
ITB 1038 – CEB 350, 845
ITB 2025 – CEB 2027, 2028
Peterson AFB, CO
Prepared By
38 ES/ENII
4064 Hilltop Road
Tinker AFB OK 73145-2713
7 September
REVISED:
Page | 2
Table of Contents
1.0 SCOPE
2.0 REQUIREMENTS
2.1 GENERAL REQUIREMENTS
2.1.1 Safety Requirements
2.1.2 Site Coordination
2.1.2.1 Cultural Resources
2.1.2.2 Confined Space
2.1.2.3 Accident/Incident Reporting and Investigation
2.1.2.4 Work Area(s)
2.1.2.5 Traffic control
2.1.2.6 Airfield Driving
2.1.3 Security Requirements
2.1.3.1 Security Clearances
2.1.3.2 Operational Security (OPSEC)
2.1.4 Environmental Compliance
2.1.5 Permits
2.1.6 Integrated Process Team (IPT)
2.1.7 Quality Assurance
2.1.8 Contractor Personnel
2.1.8.1 Project Management
2.1.8.2 Site Point of Contact (POC)
2.1.8.3 Personnel Requirements
2.1.8.4 Minimum Contractor Qualifications
2.1.8.5 System for Award Management (SAM)
2.1.9 Warranty
2.1.10 Manuals and Practices
2.2 SPECIFIC REQUIREMENTS
2.2.1 Site Survey N/A
2.2.2 Backboards N/A
2.2.3 Equipment Cabinets
2.2.3.1 Grounding and Bonding
2.2.3.2 Bushings
Page | 3
2.2.4 Outside Plant Requirements
2.2.4.1 Existing Maintenance Holes
2.2.4.2 Measurements
2.2.4.3 Underground Utilities Markings
2.2.4.4 Closures for Cable Splicing in Maintenance Holes
2.2.4.5 Splice Connectors
2.2.4.6 Labeling
2.2.4.6.1 New Ducts
2.2.4.6.2 Fiber Optic Distribution Panel (FODP) Marking
2.2.4.6.3 Cable Tags
2.2.4.7 Cable Terminations
2.2.4.8 FOC Maintenance Loop
2.2.4.9 New Maintenance Holes/Hand-holes
2.2.4.9.1 Lockable Manhole Covers
2.2.4.9.2 Cable Racks and Cable Rack Supports
2.2.4.9.3 Grounding
2.2.4.10 Underground Conduit System
2.2.4.10.1 Composition
2.2.4.10.2 Installation
2.2.4.10.3 Bends and Sealing
2.2.4.10.4 Utility Separation
2.2.4.10.5 Spacers and Tracer Wire
2.2.4.10.6 Warning Tape
2.2.4.10.7 Entrance Conduits into Existing Maintenance Holes
2.2.4.10.8 Excavation/Building Penetrations
2.2.4.10.9 Conduit Bends or Sweeps
2.2.4.10.10 Pull Tape
2.2.5 Outside Plant Installation
2.2.5.1 Infrastructure Installation
2.2.5.1.1 Maintenance Hole Infrastructure
2.2.5.1.2 Duct-bank Infrastructure
2.2.5.1.3 Metallic Conduit Infrastructure
2.2.5.1.4 Geotextile Inner-duct (Max Cell)
2.2.5.1.5 Fiber Optic Cable Installation
Page | 4
2.2.6 Project Residue
2.2.7 Site Restoration
2.2.8 Service Outages
2.2.9 Configuration Management N/A
2.2.10 Identification/Marking
2.2.11 Installation Schedules
2.2.12 Weekly Status Reports
2.2.13 Drawings
2.2.13.1 As-Built Drawings
2.2.13.2 Butterfly Drawings
2.2.13.3 Geospatial Deliverables
2.2.14 Test and Acceptance/Installation Test Plan
2.2.15 Testing
2.2.15.1 In-progress Testing
2.2.15.1.1 Excavations
2.2.15.1.2 Splices
2.2.15.1.3 Fiber Optic Tests
2.2.15.1.3.1 Optical Attenuation
2.2.15.1.3.2 Distance
2.2.16 Acceptance/Installation Test Report
2.2.17 Final Acceptance
2.2.18 Training Plan N/A
3.0 GENERAL INFORMATION
3.1 Period of Performance
3.2 Place of Performance
3.3 Hours of Operation
3.4 Holidays/Down Days
3.5 Base Support
4.0 APPENDICES
4.1 Appendix A: APPLICABLE STANDARDS
5.0 Attachment 1: Proposed Project Sketches
Page | 5
1.0 SCOPE
This Performance work statement (PWS) defines the requirements for the Contractor to engineer, furnish, install and test (EFI&T) new maintenance hole/duct-bank infrastructure and single mode fiber optic cable (FOC) to enhance connectivity between Information Transfer Building (ITB) 1038 to CEBs 350, 845 and ITB 2025 to CEBs 2027,2028 at Peterson AFB, Colorado.
2.0 REQUIREMENTS
2.1 GENERAL REQUIREMENTS
2.1.1 Safety Requirements
The contractor shall remain in compliance with all Federal, State, county, and base security and safety laws, regulations, policies, and requirements.
2.1.2 Site Coordination
The Contractor shall meet with the base safety officer immediately upon arrival on site for review of the specific safety requirements prior to installation.
2.1.2.1 Cultural Resources
The contractor shall coordinate with Peterson AFB Cultural Resources Manager before proceeding for a review of any potential impacts to cultural resources.
2.1.2.2 Confined Space
The Contractors and Sub-contractors entering spaces on Peterson AFB, CO are responsible for the safety of their personnel and for their own permit space program as outlined in AFI 91-203.
All confined space operations must be coordinated with the Base Safety Office prior to start of work. The primary Contractor is responsible for all Sub-contractor confined space operations.
2.1.2.3 Accident/Incident Reporting and Investigation
The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel to the 21 Communication Squadron Project Manager and the Base Safety Office unless otherwise stated in the PWS. The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the Base POC. If the Government elects to conduct an investigation of the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed.
2.1.2.4 Work Area(s)
At day’s end, the Contractor shall remove all debris and surplus materials from the work place.
Safety barriers shall be in place to protect unfinished work site at the end of the day. All open holes or trenches shall be completely enclosed by flexible orange construction safety fencing or other safety barriers at the end of the work day. Equipment and materials required to complete the work effort may remain on site as long as they are organized/stored in a manner that does not cause a safety hazard. The contractor shall co-ordinate with the 21CS to ensure that any locking manhole covers are put back in place at the end of each workday.
work statement
Page | 6
2.1.2.5 Traffic control
In the event base vehicular traffic is to be disrupted by trenching or horizontal directional boring, the Contractor shall notify the 21 CS PM NLT 10 calendar days in advance to inform base Security Forces and Emergency Services personnel of the planned disruptions.
2.1.2.6 Airfield Driving
Any person operating a motor vehicle inside the airfield fence on Peterson AFB shall coordinate with airfield management to obtain the required training/certifications IAW local procedures.
2.1.3 Security Requirements
The Contractor shall process and provide a Site Visit Request Letter to 21 CS/SCX within 5 calendar days after contract award. This spreadsheet shall identify the names ( as shown on the driver’s license), driver’s license numbers and state of issue, and birth date of the personnel who will be performing work under this PWS, company name, address, phone number and contract number, start date and end date.. This information is required to grant access to the base. If required by the base, the Contractor shall provide identification badges for their employees. All Contractor personnel shall wear these badges while on duty on the Government site. The badges shall identify the individual, company name, and be clearly and distinctly marked as Contractor and be in accordance with base regulations.
2.1.3.1 Security Clearances
Stated work and associated products shall be performed at the UNCLASSIFIED level. However, some of this work may take place in secure areas where Contractor employees must be escorted at all times. The Contractor must coordinate access to secure areas with 21 CS/SCX Project Manager at least five (5) calendar days ahead of time. It is the Government’s responsibility to provide escorts.
2.1.3.2 Operational Security (OPSEC)
Network Infrastructure (MHDS, MH/HH locations, fiber paths, etc.) is on the 21 CS Critical Information List and must be protected. The Contractor shall take appropriate measures to protect detailed information pertaining to the EFI&T effort, to include appropriate marking of documents as “For Official Use Only (FOUO),” and ensuring limited distribution of documents and schematics/drawings to only those individuals with a valid need to know. IAW AFI 10-701, OPSEC Considerations, the contractor shall develop an OPSEC plan to ensure the protection of FOUO data either furnished by the government or produced by the contractor. The contractor’s OPSEC plan shall be incorporated into the RFP to the PWS.
2.1.4 Environmental Compliance
The Contractor shall comply with the most stringent environmental federal, state, and local laws and regulations; and Air Force policies, instructions, and plans. The federal Government is not exempt from compliance with environmental regulations. The Contractors are responsible to know and follow all applicable Federal, State, Local and Air Force regulations for environmental protection, including waste disposal, sewer discharge, air emissions, and storm water requirements. The contractor shall maintain an awareness of changing environmental regulatory requirements to avoid environmental deficiencies for activities on Peterson AFB. The Prime Contractor shall ensure that their sub-contractors (if any) comply with these specifications.
Page | 7
2.1.5 Permits
The Contractor shall be responsible to coordinate, complete and process all permits required to complete the installation. For example:
Digging permit, AF Form 103 shall be submitted through BCE 14 calendar days in advance of digging activities.
Confine space entry permit, AF Form 1024 shall be coordinated through base safety office. The Contractor shall be prepared to provide proof of their Confined Space Training Program along with the AF Form 1024 to base safety.
Base Civil Engineering Work Clearance Request, AF Form 332 shall be submitted through BCE 14 calendar days in advance of planned work.
All utility markings, flags, etc. shall be maintained by the contractor after the responsible work center/shop identifies/locates them and ensure that the AF Form 103 remains current. The contractor shall take precautions to protect existing infrastructure. If a utility is severed or damaged due to neglect or if attributed to the fault of the contractor, then the contractor shall repair and return the utility back to the same condition it was in prior to the damage.
2.1.6 Integrated Process Team (IPT)
The Contractor shall chair a weekly IPT meeting that includes Contractor representatives, the Government Contracting Officer (CO), the CSI-B, the System Engineer(s), the 38 ES Project Manager, the 21 CS Project Manager, and other base personnel as required. The Contractor shall provide an agenda and a worldwide “Meet Me” teleconference capability for the duration of the project. The purpose of the IPT meeting is to discuss project progress, problems being encountered, and other information necessary/beneficial to ensure success and timely completion of contract requirements. The Contractor shall record meeting minutes and distribute to the attendees NLT 1 working day after each meeting.
2.1.7 Quality Assurance
The Contractor shall provide Quality Assurance Support for the entire life of the project. The Contractor’s quality assurance evaluator shall assist the Government representative in performing random spot checks and system acceptance tests. The Contractor shall be responsible for identifying system and outside plant deficiencies and/or discrepancies throughout the life of the project. A weekly report (soft copy) shall be submitted indicating progress/status and listing any deficiencies/discrepancies found and actions to correct them.
2.1.8 Contractor Personnel
2.1.8.1 Project Management
The Contractor shall provide a Project Manager (PM) and alternate(s) responsible for contract performance and continuity. The Contractor shall identify the Project Manager’s or alternate's range of authority to act for the Contractor relating to daily contract operation.
2.1.8.2 Site Point of Contact (POC)
The Contractor shall designate the Contractor's on-site team leader and alternate(s) as the Site POC for individual projects in their Site Visit Request Letter. The Site POC or alternate(s) shall be on site during duty hours for the duration of the project, up to and until final acceptance by the
Page | 8
Government PM and shall oversee all facets of the installation tasks. The Site POC shall be the interface for all work site communications with the Government, including quality, safety, and discrepancy matters.
2.1.8.3 Personnel Requirements
The Project Manager, Site POC, and respective alternate(s) shall be able to read, write, speak, and understand English and shall be on site to coordinate permits, clearances, and receive shipments/material related to the task order.
2.1.8.4 Minimum Contractor Qualifications
All work shall be performed by an experienced Telecommunications Contractor. The Contractor shall have a minimum of 3 years of experience in Telecommunications Systems installations.
2.1.8.5 System for Award Management (SAM)
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.sam.gov
(SAM replaces the previous ECMRA application that was hosted on https://www.ecmra.mil. See https://www.dmdc.osd.mil/ecmra_splash/)
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the SAM help desk.
2.1.9 Warranty
The Contractor shall provide a one year warranty or manufacturer’s standard commercial warranty, whichever is longer. This warranty shall include a one year workmanship warranty.
The warranty period shall start from the date of system and/or project acceptance. The Contractor shall provide written procedures and required information for warranty services at or prior to site acceptance.
2.1.10 Manuals and Practices
The Contractor shall provide the latest version of operation, installation, and maintenance manuals and practices/users guide for each system installed as provided by the original manufacturer with all new equipment.
2.2 SPECIFIC REQUIREMENTS
This section describes the underground maintenance hole/conduit system, flexible geotextile multiple cell fabric inner-duct and fiber optic cable installation requirements. The Contractor shall design and install Customer-Owned Outside Cable Plant Telecommunications Infrastructure in accordance with applicable codes, statutes and other guidance, for example, but not limited to (copies are not provided):
- NESC, National Electric Safety Code;
- NFPA 70, National Electric Code;
Page | 9
- American National Standards Institute Telecommunications Industry Association (TIA)- 758-B, Customer-owned Outside Plant Telecommunications Infrastructure Standard;
- Building Industry Consulting Service International (BICSI) Standards
Each cable installation shall be coordinated with the 21CS/SCX so that the impact on the building users is properly coordinated and minimized. The sequence of installation is at the Contractor’s discretion.
See Attachment 1, Project Sketches for reference and estimated distances of existing and proposed infrastructure and cable routes. This is only a proposed solution. The Contractor is free to make any recommendations pertaining to the accomplishment of this requirement in their proposal.
The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this PWS. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and material provided shall be new and not refurbished.
2.2.1 Site Survey N/A
2.2.2 Backboards N/A
2.2.3 Equipment Cabinets
All new equipment cabinets/racks shall be compatible with existing cabinets/racks. Equipment cabinets/racks shall have sufficient ventilation, cable pathway access, and space to allow for maintenance and operation of the equipment. Consideration must be given to wall mounted cabinets to ensure the long term ability of the cabinet to be mounted, to stay attached to the wall and for the required clearances to service all cabling and equipment installed with the cabinet.
Rail settings within cabinets/racks must be secured and be in a level condition.
Existing/previously installed cabinets/racks shall be re-used to the maximum extent possible.
2.2.3.1 Grounding and Bonding
All new and existing racks/cabinets housing equipment for this project, as well as all ladder rack/and cable tray shall be bonded and grounded to the Equipotential Ground Plane IAW TIA- 607-B. All Equipment racks and cabinet rails shall be Telecommunications style rails that are unpainted and have drilled and tapped mounting holes IAW DISN Implementation Standards, Ch. 2.7.20 to 2.7.26. Equipment cabinets shall be capable of containing any standard equipment shelves for communications equipment per the current revision of EIA/ECA-310. The Contractor shall test any new or extended ground at the cabinet/rack and at the new grounding/bonding points. The government reserves the right to test and validate any newly installed ground to ensure they meet compliance.
2.2.3.2 Bushings
All penetrations into the rack/cabinet must be reamed, filed and have an installed bushing or grommet material. No exposed metal edges shall come in contact with telecommunication cabling.
Page | 10
2.2.4 Outside Plant Requirements
As indicated in this PWS and attached sketches the Contractor shall EFI&T the fiber optic cable and additional duct bank infrastructure required to upgrade and enhance fiber optic cable connectivity between ITB 1038 to CEBs 350, 845 and between ITB 2025 to CEBs 2027, 2028.
2.2.4.1 Existing Maintenance Holes
The Contractor shall pump out water as required into the storm drain system. Water may be drained through the pavement or grass area where a storm drain is not available. If necessary, the Contractor shall be responsible for removing mud, debris, etc. from maintenance holes/hand-holes to the extent necessary for the Contractor to perform work in the space. Mud and debris shall be disposed of IAW base requirements. If Contractor comes across a manhole with contaminated water, the Contractor shall coordinate with the environmental office in Base CE.
2.2.4.2 Measurements
Any distances provided in this PWS are approximations and should NOT be used for ordering materials or determining duct lengths.
2.2.4.3 Underground Utilities Markings
The Contractor shall coordinate with base agencies to ensure markings are placed over existing base infrastructure prior to digging or horizontal directional boring and shall take precautions to protect existing infrastructure. The Contractor is responsible for repair of any damage caused during installation when the infrastructure is clearly marked. The Contractor is responsible for maintaining all markings and for ensuring AF Form 103 (Dig Permit) remains current.
2.2.4.4 Closures for Cable Splicing in Maintenance Holes
Intermediate fiber optic cable splices shall be minimized and consist of core alignment method fusion splices in a high quality polypropylene re-enterable splice closure. Only splice closures intended for underground applications shall be used in the underground system. The Contractor shall use standard re-enterable fiber splice closures. The closures shall have adequate strength to protect the splice and maintain cable shield electrical continuity in the below ground environment. The Government quality inspector shall have the opportunity to inspect the inside of the splice case before closure pressure testing and encapsulation is performed. A coil of 25 feet of cable shall be provided on each cable entering and leaving a splice case in a MH or HH.
2.2.4.5 Splice Connectors
All fiber splicing shall be performed in accordance with RUS Bulletin 1735F-401, Standards for Splicing Copper and Fiber Cable. The Core Alignment fusion splice method shall be used for fiber optic cable.
2.2.4.6 Labeling
The Contractor shall label all equipment and cables they install and cables identified for re-use in accordance with TIA-606-C and as directed by the base communications organization.
Page | 11
2.2.4.6.1 New Ducts.
New ducts shall be permanently labeled on the wall of each building/maintenance hole indicating the connecting building/maintenance hole at the other end of the duct (for example, “To MH- 200”). The same information shall appear on the Contractor’s completed as-built-drawings.
2.2.4.6.2 Fiber Optic Distribution Panel (FODP) Marking.
Each FODP shall be stenciled/marked with black ink or paint or adhesive backed decals in letters and numbers. The cover of all new fiber optic distribution panels (FODPs) shall be labeled to conform to the system used by local maintenance personnel to identify FODPs that terminate fiber. If the FODP manufacturer has not identified the sequence in which the ports are counted, the Contractor shall provide designation labels/strips to identify the sequence in which the ports are counted. Each splice tray shall be marked to identify the fiber count contained in the splice tray. The marking shall identify the FODP by number (building number), cable number, and count.
Example: FODP 1038
FO 1038-350, 1-12
Note: The same information shall appear on the Contractor’s completed As-Built-Drawings.
2.2.4.6.3 Cable Tags
All tags shall be permanently labeled, easily visible and corrosion resistant. Install cable tags in all maintenance holes/hand-holes, cable vaults, pull boxes and building entrance terminal locations.
When cables pass through a maintenance hole, a tag shall be placed on the cable, approximately 2 feet from each duct entrance. Information on the cable tag shall identify cable by size, type, cable number and count. Tagging and labeling of new cables shall be IAW the following:
12L8.3F
FO 1038-350, 1-12
Line One: A = Armored Sheath (otherwise leave blank) 36 = Fiber Count. L = Loose Tube Buffer or (T) Tight Tube Buffer. 8.3 = Single Mode. F = Filled core (otherwise leave blank).
Line Two: 1038-350 = From-To Building numbers. 1-12 = Cable/strand Count.
2.2.4.7 Cable Terminations
Fiber optic cables shall be terminated on new fiber optic distribution panels using fusion spliced factory pigtails with LC connectors or fusion splice LC direct connectors. Distribution panels shall be designed for rack mounting in 19-in or 24-in (48 cm or 60 cm) racks as required. Panels shall be sized accordingly to cable and method of termination.
2.2.4.8 FOC Maintenance Loop
The Contractor shall install a minimum of a 50 feet fiber optic cable maintenance loop at the first MH from the building, at each splice point MH location and in every third manhole. The maintenance loop shall be properly labeled and securely supported by two cable hooks. Cable hooks are to be positioned so the highest one supports the underside of the top of the coil and the bottom hook supports the underside of the bottom of the coil.
Page | 12
2.2.4.9 New Maintenance Holes/Hand-holes
Maintenance holes installed under this Task Order shall have an American Association of State Highway and Transportation Officials (AASHTO) rating of H-20 or equivalent. Unless otherwise stated, MHs shall have minimum interior dimensions of 6’W x 8’L x 7’H; HHs shall have a minimum interior dimension of 4’W x 4’L x 4’H. New maintenance holes shall be furnished with a 30” round lid. Maintenance holes/Hand holes shall be furnished with cable rack hardware, pulling irons, a sump, water resistance gaskets, bonding ribbon and a grounding system; predrilled duct entry holes [sealed with knockouts configured for splayed entry in the end walls)] with duct terminators to accept 4-inch I.D. schedule 40 conduit.
It is understood that some Maintenance Holes are precast with bonding ribbons or some similar connection, to the maintenance hole rebar and therefore do not require a ground rod. This method of grounding in lieu of a ground rod is satisfactory just as long as the achieved impedance to ground is twenty five (25) ohms or less.
Prefabricated MHs/HHs are preferred. MH/HH shall be installed so that they are reasonably level on a gravel bed of 6 inches to allow drainage of water from the walls. The gravel bed should extend 8 inches to 12 inches beyond the outer edges of the MH/HH. MH/HH covers shall be labeled with 1/8” raised letters stating “COMMUNICATIONS. Maintenance holes shall be stenciled on the inside with a number designated to the contractor by 21CS.
MHs/HHs shall be of concrete construction and meet the requirements of TIA -758B, paragraphs
5.2.1 and/or 5.2.2. Polymer concrete (i.e., Quazite) construction is NOT authorized.
2.2.4.9.1 Lockable Manhole Covers.
All MHs installed by this contract shall be furnished with a lockable MH cover and lock system that is compatible with the “Lock Down” MH locking system. Security shall be provided by padlock. Coordinate with the 21CS for key codes.
2.2.4.9.2 Cable Racks and Cable Rack Supports
Cable racks shall be installed in each existing maintenance hole as required. Splices shall not be supported by the cables that enter each end of the splice case. The splices shall be supported by cable hooks under the splice case. Telecommunications industry standard cable hooks of the appropriate length shall be provided to support cables and splices cases. The cable hooks shall be secured using cable rack locking clips. All cables shall be supported using racking clips, cable racks, and cable hooks.
2.2.4.9.3 Grounding
Grounding hardware such as corrosion resistant wire, bonding ribbon, clamps, ground rod, etc.
necessary to properly bond/ground the cable in MHs/HHs shall be provided by the contractor.
Reference most current version of TIA 607 at time of contract award. Maintenance holes shall be grounded in accordance with RUS 1751F-802 and NEC, Article 250, the resistance for OSP grounding shall be nominally 25 ohms.
2.2.4.10 Underground Conduit System
The Contractor shall be responsible for any required trenching and/or boring necessary to lay the duct system. Contractor is also responsible for backfilling ditch lines and compaction of fill materials with appropriate compaction tools. Provide a minimum of 12" cover of clean fill
Page | 13 above the conduit. Backfill material shall be clean and free from all organic material, clay, marl or unstable materials, debris, lumps, or broken paving. No rocks or stones larger than 3 inches in diameter shall be allowed in backfill. Material for backfill may be material resulting from excavation, if it meets the above requirements. Directional drilling shall be used for major road crossings. Otherwise, crossing of paved surfaces may be performed by pavement cuts and resurfacing with appropriate matching road material. This does not prevent the Contractor from using directional drilling if it is more cost effective. Ducts will be appropriately protected when placed under paved surfaces.
2.2.4.10.1 Composition
The ducts shall be corrosion resistant and 4-inch inside diameter (I.D.) round or metric equivalent. The ducts shall be made of EPC-40 Polyvinyl Chloride (PVC) (Schedule 40) IAW NEMA TC-2; or EPC-80-PVC (Schedule 80) IAW NEMA TC-2; or high density polyethylene (HDPE) SIDR 11.5. Schedule 80 PVC shall be limited to risers, all above ground conduit and under the roadway/parking pavement. HDPE SIDR 11.5 shall be used when directional boring is used. The ducts shall be appropriately labeled indicating the composition material. Ducts shall have a sleeve or bell end type coupling and shall be watertight when assembled. In addition, the Contractor shall adhere to any additional Host Base/site specific requirements.
2.2.4.10.2 Installation
Installation of underground conduits/ducts shall be IAW RUS Bulletin 1751F-643 and RUS Bulletin 1753F-151. Ducts installed beneath roads, sidewalks, parking areas, other paved surfaces or areas to be paved, etc. shall be installed a minimum of 36" below grade. All ducts installed beneath any paved surfaces shall be installed by means of horizontal directional boring beneath the paved surface so as not to damage the existing pavement, unless not physically possible due to geographical or man-made obstructions. In MH with knockouts, ducts shall start at the bottom knockout, allowing for upward expansion in the MH. Do not terminate HDPE directly in a MH/HH but instead install 4-inch I.D. PVC stub out(s), a minimum of 5-10 feet out of the manhole and couple the HDPE to the PVC. All ducts not installed under roads, sidewalks, parking areas, or areas to be paved, etc. shall have a minimum of 36 inches ground cover, where possible. The Contractor shall provide other protective measures, concrete cap, etc., in those areas where the minimum ground cover cannot be achieved. Grading of ducts shall be accomplished IAW RUS Bulletin 1751F-643. Ensure the integrity of the orientation of the duct bank between Maintenance holes. Do not allow the ducts to twist or tangle between Maintenance holes.
2.2.4.10.3 Bends and Sealing
All bends between MHs shall be a minimum of ten times (10X) the diameter of the duct size (i.e, 4 inch duct = 40 inches) with the sum of bends in all directions not exceeding a total of 90 degrees where practical. Coordinate with 90 CS if runs have bends that total more than 90 degrees is required. Ducts shall have bell ends and enter a MH perpendicular to the surface of the wall through which it is entering. All ducts/inner-ducts entering MH shall be sealed.
Universal duct plugs or removable putty sealants may be used. Upon completion of conduit sections, a rigid test mandrel ¼” (6.4mm) smaller than the inside diameter of the conduit shall be pulled through each duct to ensure proper alignment. In addition, all ducts shall be cleared of loose materials such as concrete, mud, dirt, stones, etc.
Page | 14
2.2.4.10.4 Utility Separation
When communications ducts cross either power duct or buried power cable, maintain a minimum separation of 3 inches of concrete or 12 inches of well-tamped earth between the two or 12 inches of well tamped earth when parallel; for pipes (e.g., gas, water, oil) maintain 6 inches when crossing or 12 inches when parallel.
2.2.4.10.5 Spacers and Tracer Wire
Along the length of the duct run, if the ducts are installed by trenching, spacers shall be placed at an interval of four (4) spacers per 20 feet. At least one duct, inner-duct or roll pipe shall have tracer wire or be otherwise locatable from the surface. Tracers shall be 14 American Wire Gauge (AWG) wire with thermoplastic insulated high heat resistant nylon jacketed (THHN) two part insulation jacket. All new tracer wire installed for this project needs to have a wire nut and label installed at all wire ends, and those wire ends secured but not connected to grounds. The tracer wire shall be exposed; free from the conduit and capped (insulated). The tracer shall be secured and routed to the maintenance hole or hand-hole neck to a point where maintenance personnel may access the wire without having to enter the maintenance hole/hand-hole, and tagged with a label so indicating it as a “Duct Tracer Wire to xxx – Do Not Remove (where xxx is the other end of the wire).” Tracer wires shall not be connected to any grounding system.
Tracer wire shall be pulled back from building entrances until it is underground to prevent lightning damage. Tracer shall have 1-foot of slack protruding into the maintenance hole, tagged with to/from designators and fasten to Maintenance hole wall 3-inches below lid opening.
2.2.4.10.6 Warning Tape
Cable warning tape shall be buried one (1) foot below the surface and shall follow the duct/buried cable route. The tape shall be a minimum of three inches wide and orange in color with the appropriate warning message.
2.2.4.10.7 Entrance Conduits into Existing Maintenance Holes
When new entrance conduits/ducts or sleeves are required, the Contractor shall core and install the necessary holes and install the ducts or sleeves, if knockout doesn’t exist. Contractor bored holes shall be fitted with duct terminators to accept 4-inch I.D, schedule 40 conduit. Penetration shall not be in such a location through the wall as to block use of existing ducts in the maintenance hole.
New ducts will be a minimum of 18 inches from either the maintenance hole floor or ceiling, if practical. The minimum bending radius for entry conduit/ducts shall be no less than 10 times the inside diameter of the conduit. New ducts shall be swept down and installed in the lowest available duct positions within the lowest available duct window in the maintenance hole. Ducts shall have bell ends and enter the MH perpendicular to the surface of the wall through which it is entering and shall be installed flush with the interior wall of the MH/HH. Ducts and openings around ducts shall be sealed to prevent moisture from entering the maintenance holes.
2.2.4.10.8 Excavation/Building Penetrations
All wall penetrations, including inside buildings, shall be restored to meet the required base fire ratings.
Page | 15
2.2.4.10.9 Conduit Bends or Sweeps
Where a bend or sweep is placed in PVC nonmetallic duct bank between maintenance holes, the duct bank must be encased in concrete with a minimum compressive strength of 3000 pounds per square inch (psi).
2.2.4.10.10 Pull Tape
All newly installed ducts left vacant shall be provided with a pull tape with a waterproof, corrosion resistant, pre-lubricated flat woven polyester pull tape with sequential footage markings, (1250 lb. pulling strength) for future cable installations. The pull tape shall extend into the maintenance holes/hand-holes and be secured to a cable rack or pulling iron, etc.
2.2.5 Outside Plant Installation
See Attachment 1, Project Sketches for reference and estimated distances of existing and proposed infrastructure requirements and cable routes. This is only a proposed solution. The Contractor is free to make any recommendations pertaining to the accomplishment of this requirement in their proposal.
The Contractor shall install underground outside plant infrastructure and fiber optic cables as described below.
Page | 16
2.2.5.1 Infrastructure Installation
Install the following new infrastructure. All new locations and distances are approximate.
2.2.5.1.1 Maintenance Hole Infrastructure
Install one (1) new 6’ x 8’ x 7’ manhole and three (3) new 4’ x 4’ x 4’ hand-holes at the approximate location shown on the attached sketch 1, 1A and 2. Co-ordinate with 21CS for final maintenance-hole placement and numbering scheme. (Note: The 6’ x 8’ x 7’ (MH-1038 on sketch 1A) may have been installed previously).
, 1
, 1
PW
S
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge
2.
5.
1.
D uc t-ba nk
In fr as tr uc tu re
In st al l t he fo llo w in g
4” P
V C
D uc t b an ks
Fr om
M ho le
T o
Q ua nt ity
Si ze
A pp ro x.
D is ta nc e
(F ee t)
Sk et ch
C m en t
M H
-3
H
H -3
(N ew
4”
0’
Pa ve d su rf ac es sh al l b e bo re d
H H
C
EB
1, ve d su rf ac es sh al l b e bo re d.
B ui ld in g en try
. S tu b up in to a N
EM
A ty pe e xt er io r w al l m ou nt ed p ul l bo x pl ac ed to p en et ra te th e bu ild in g ab ov e th e dr op ce ili ng in ro om
9.
C oo rd in at e w ith
SO
C S fo r bu ild in g en try d et ai ls
M H
-2
H
-8 ve d su rf ac es sh al l b e bo re d.
H H
EB
1, , 4
B ui ld in g en try
. S tu b up in to a N
EM
A ty pe e xt er io r w al l m ou nt ed p ul l b ox p la ce d to p en et ra te th e bu ild in g ab ov e th e do or s a nd d ro p ce ili ng o f t he se co nd fl oo r h al lw ay
. C oo rd in at e w ith
SO
C S fo r bu ild in g en try d et ai ls
M H
-2
M H
-1
(N ew
1A d su rf ac es sh al l b e bo re d.
(N ot e:
N ew M
H m ay h av e be en in st al le d pr ev io us ly
M H
-1
(N ew
IT
B
B as em en t
(R oo m B
, 5 ld in g en try . P en et ra te b el ow g ro un d di re ct ly in to
IT
8, R oo m
B
, T ec h C on tro l.
D uc ts w ill e er hi gh o n w al l a bo ve e xi st in g ca bl e la dd er
. E xt en d ca bl e la dd er to e nt ry lo ca tio n.
C oo rd in at e w ith
1C
S fo r e xa ct d et ai ls
N ot e:
N ew M
H an d en try nd ui ts m ay h av e be en in st al le d pr ev io us ly
In st al l t he fo llo w in g
4” P
V C
D uc tb an ks ho le T o M an ho le Q ua nt ity Si ze A pp ta nc e (F ee t)
Sk et ch C om m en t
M H
-3
H
H -3
(N ew
4”
0’
Pa ve d su rf ac es sh al l b e bo re d
H H
C
EB
4”
1, Pa ve d su rf ac es sh al l b e bo re d.
B ui ld in g en try . S tu b up in to a
N
EM
A ty pe e xt er io r w al l m ou nt ed p ul l bo x pl ac ed to pe ne tra te th e bu ild in g ab ov e th e ng in ro om
9.
C oo rd in at e w ith
SO
C S fo r bu ild in g en try d et ai ls
M H
-2
H H
-8
(N ew
4”
0’
Pa ve d su rf ac es sh al l b e bo re d.
H H
C
EB
4”
1, , 4 A
B ui ld in g en try . S tu b up in to a
N
EM
A ty pe e xt er io r w al l m ou nt ed p ul l b ox p la ce d to pe ne tra te th e bu ild in g ab ov e th e do or s a nd d ro p ce ili ng o f t se nd fl oo r h al lw ay
. C oo rd in at e w ith
SO
C S fo r bu ild in g en try d et ai ls
M H
-2
M H
-1
(N ew
4”
0’
1A Pa ve d su rf ac es sh al l b e bo re d.
(N ot e:
N ew
M H m ay h av e be en in st al le d pr ev io us ly
M H
-1
(N ew
IT
B
B as em en t
(R oo m B
4”
1A , 5
B ui ld in g en try . P en et ra te b el ow g ro un d di re ct ly to
8, R oo m
B
, T ec h C on tro l.
D uc ts w ill e gh o n w al l a bo ve e xi st in g ca bl e la dd er
. E xt en d ca bl e la dd er to e nt ry lo ca tio n.
C oo rd in at e w ith
1C
S fo r e xa ct d et ai ls
N ot e:
N ew M
H an d ui ts m ay h av e be en in st al le d pr ev io us ly
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge al l t he fo llo w in g
4” P
V C
D uc t b ks ta nc e
(F m en t
M H
-2
M H
-2
5’ d su rf ac es sh al l b e bo re d.
M H
-2
M H
-1 d su rf ac es sh al l b e bo re d.
M H
-1
-2
(N ew ve d su rf ac es sh al l b e bo re d.
M H
-2
(N ew
IT
B
R oo m
2, , 6 d su rf ac es sh al l b e bo re d.
B ui ld in g en try
. S tu b up in to a N
EM
A ty pe e xt er io r w al l m ou nt ed p ul l bo x pl ac ed to p en et ra te th e bu ild in g be lo w th e ce ng om
. C oo rd in at e w ith
0C S fo r b ui ld in g en try d et ai ls
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge
5.
1.
M et al lic C on du it In fr as tr uc tu al l t he fo llo w in g em t c on du its
(T e xa ct p la ce m en t w ill b e co or di na te d du rin g im pl em en ta tio n) ta nc e
(F m en t
C
EB
E ry
Lo ca
R oo m
In st al l t w o 4” e m t c on du its fr om th e ne w e lo tio n ab ov e th e dr op c ei lin g in ro om
9, a cr os s th e le ng th o f r oo m an d in to th e co m m
. l oc at io n in ro om
0.
C oo rd in at e w ith th e
C S fo r e xa ct de ta ils
C
EB
e xt er io r pu ll bo x)
C
EB
4, al l t w o 4” e m t c on du its fr om th e ne w e xt er io r en try p ul l b ox , p en et ra te th e bu ild in g ab ov e th e bl oc ke d do or s a nd e xt en d th e co nd ui ts a bo ve th e ng in to th e co m m . l oc at io n in ro om
C oo rd in at e w ith th e
C
S fo r e xa ct d et ai
(N ew e ro om
6, al l t w o
4” e m t c on du its fr om th e ne w e xt er io r en try p ul l b ox in st al le d ab ov e.
P en et ra te th e bu ild in g be lo w th e ce ili ng in ro om
. E xt en d th e co nd ts al on g th e ce ili ng in to th e co m m
. l oc at io n in
0.
I ns ta ll pu ll bo xe s a t e ac h tu rn lo ca tio n an d as qu ire d to fa ci lit at e in st al la tio n.
E xt en d th e ex is tin g ca bl e la dd er in ro om to m ee t t he n ew c on du its
C oo rd in at e w ith th e
C
S fo r e xa ct d et
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge
5.
1.
G eo te xt ile
In ne r-du ct (M ax C el l)
Ea n ew
-c el l s ha ll ha ve a se pa ra te th re ad c ol or
Th er e ar e ex is tin g av ai la bl e in ne r-du ct s f or th os e ru ns n ot li st ed h e.
al l t he fo llo w in g
3”
-c el l G eo te xt ile In ne r-du ct s ta nc e (F m en t
IT
B
M
H -7
Ex tin g em pt y
4” d uc t.
(I nn er -d uc t m ay h av e be al le d pr ev io us ly
M H
-7
M H
O rr id e in d uc t w ith e xi st in g p ai r c ab le
. C ab le m ay a ba nd on ed
In ne r-du ct m ay h av e be en in st al le d pr ev io us ly
M H
-1
-1 tin g em pt y 4” d uc t.
M H
-1
M
H -1 is tin g em pt y
4” d uc t
M H
-1
M
H -2
O ve rr id e in d uc t w ith e xi st in g pa ir ca bl
-2
M
H -3 is tin g em pt y
4” d uc t.
M H
-3
H
H
N ew e m pt y
4” d uc t.
H H
C
EB
(E ry p ul l b ox
N ew e m pt y 4” d uc t.
C
EB
ry p ul l b ox
C
EB
m
N ew e m pt y 4” e m t c on it.
M
H -1
(N ew e m pt y
4” d uc t.
(I nn er -d uc t m ay h av e be en in st al le d pr ev io us ly
M H
-1
(N ew
M H
-2 e m pt y
4” d uc t.
M H
-2
M H
-2 e m pt y
4” d uc t.
In st al l t he fo llo w in g
3”
-c el l G eo te xt ile In ne r-du ct s
Q ua nt ity A pp ta nc e (F ee t)
Sk et ch C om m en t
IT
B
M H
-7
1A
Ex is tin g em pt y 4” d uc t.
(I nn er
-d uc t m ay h av e be en in st al le d pr ev io us ly
M H
-7
M H
-1
5’ 1A
O ve rr id e in du ct w ith e xi st in g p ai r c ab le . C ab le m ay ba nd on ed
In ne r-du ct m ay h av e be en in st al le d pr ev io us ly
M H
-1
A M
H -1
5’ 1A
,1 Ex is tin g em pt y
4” d uc t.
M H
-1
M
H -1
5’
Ex is tin g em pt y 4” d uc t
M H
-1
M
H -2
0’
O ve rr id e in du ct w ith e xi st in g pa ir ca bl e.
M H
-2
M
H -3
5’
Ex is tin g em pt y 4” d uc t.
M H
-3
H
H
(N ew
0’
N ew em pt y 4” d uc t.
H H
C
EB
(E nt ry p ul l b ox
N ew em pt y 4” d uc t.
C
EB
ry p ul l b ox
C
EB
m
N ew em pt y 4” em t c on du it.
IT
B
M
H -1
(N ew
1A N ew e m pt y 4” d uc t.
(I nn er
-d uc t m ay h av e be en in st al le d pr ev io us ly
M H
-1
(N ew
M H
-2
0’ 1A
N ew em pt y 4” d uc t.
M H
-2
M H
-2
5’ 1A
N ew em pt y 4” d uc t.
lll
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge
Ea n ew
-c el l s ha ll ha ve a se pa ra te th re ad c ol or
Th er e ar e ex is tin g av ai la bl e in ne r-du ct s f or th os e ru ns n ot li st ed h er e.
In st al l t he fo llo w in g
3”
-c el l G eo te xt ile In ne r-du ct s ta nc e (F m en t
M H
-2
M H
-1 e m pt y
4” d uc t.
M H
-1
2A tin g em pt y
4” d uc t.
M H
2A
-2 is tin g em pt y 4” d uc t
M H
-2
M H
-2 is tin g em pt y
4” d uc t
M H
-2
H H ew e m pt y
4” d uc t.
H H
C
EB
En
P ul l b ox
1, e m pt y
4” d uc t.
C
EB
P ul m
1, e m pt y 4” e m t c on m
P ul
6, e m pt y 4” e m t c on
P ul
-2
N ew e m pt y 4” d uc t.
H H
-2
M H ew e m pt y
4” d uc t.
M H
-4
-U nk is tin g em pt y
4” d uc t.
M H
-U nk is tin g em pt y
4” d uc t.
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, –F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge
5.
1.
Fi be r
O pt ic C ab le
In st al la tio n
C oo rd in at e w ith
1C
S fo r f in al c ab le c ou nt s/ la be lli ng
In st al l t he F ol lo w in g Si ng le
M od e Fi be r
O pt ic C ab le
A ll fib er o pt ic c ab le s s ha ll be te rm in at ed u si ng L
C fu si on sp lic e di re ct c on ne ct or s.
V ia M ai nt en ol es /H an d-ho le s St ra ou ta nc e (F m en t
IT
B
, 1
A
, 1
4, , 2
3, 2, 2, , 3
(n ew
3, , 3
In st al l a st ra nd in do or /o ut do or r te d si ng le m od e
(S M
) f ib er o pt ic c ab
(1 2L
8.
3F
, F O
8-
0, -1 2)
In
IT
B in st al l a n ew fl oo r m ou ed eq pm en t r ac k co m pa tib le w ith th e ex is tin g ra ck s i n Te ch C on tro l.
C oo rd in at e w ith th e
C S fo r e xa ct ra ck lo ca tio n.
(S ee
S ke tc h
5)
N O
TE
: T hi s r ac k m ay h av e al le d pr ev io us ly
In st al l a n ew h i d en si ty po rt
Fi be r O pt ic tri bu tio n
Pa ne l (
FO
D P) in th e ne w ra ck
Te rm in at e th e ne w st ra nd
F O
C o n po rts
1-o f t he n ew F
O D
P (S ee sk et ch
EB
ro ut e th e
FO
C to ro om fo llo w in g th e ne w c ab le p at h in st al le d ab ov e.
In st al l a n ew h i d en si ty po rt
FO
D
P in a n ex is tin g ra ck
. T er m in at e th e ne w st ra nd F
O C o n a ne w F
O
P.
rd in at e w ith
1C
S fo r t er m in at io n de ta ils
Se e Sk et ch
In st al l t he F ol lo w in g Si ng le
M od e Fi be r
O pt ic C ab le
A ll fib er o pt ic c ab le s s ha ll be te rm in at ed u si ng
LC
fu si on sp lic e di re ct co nn ec to rs
V ia
M ai nt en es
/H an d-ho le s
St nt A pp ta nc e (F ee t)
Sk et ch C om m en t
IT
B
C
EB
, 1
, 1
A
,1
4, , 2
3, 2, , 3
(n ew
3, 0’
1A , 1
, 3
In st al l a st ra nd in do or /o ut do or r is er ra te d si ng le m od e (S
M )f ib er o pt ic c
8.
3F , F
O
8-
0, -1
2)
In
IT
B in st al l a n ew fl oo r m ou ed eq pm en tr ac k co m pa tib le w ith th e ex is tin g ra ck si n Te ch C on tro l.
C oo rd in at e w ith th e
C S fo r e xa ct ra ck lo ca tio n.
(S ee
S ke tc h
5) (N
O
TE
: T hi s r ac k m ay h av e be en in st al le d pr ev io us ly
In st al l a n ew h i d en si ty po rt
Fi be r O pt ic tri bu tio n
Pa ne l (
FO
D P) in th e ne w ra ck
Te rm in at e th e ne w st ra nd F
O C o n po rts
1-o f t he ne w F
O D
P (S ee sk et ch
5)
In C
EB
ro ut e th e
FO
C to ro om fo llo w in g th e ne w ca bl e pa th in st al le d ab ov e.
In st al l a n ew h i d en si ty po rt
FO
D P in a n ex is tin g ra ck .T er m in at e th e ne w st ra nd
F O
C o n a ne w
F O
D P.
C oo rd in at e w ith
C
S fo r t er m in at io n de ta ils
Se e Sk et ch lo w w
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge al l t he F ol lo w in g Si ng le
M od e Fi be r
O pt ic C ab le
A ll fib er o pt ic c ab le s s ha ll be te rm in at ed u si ng L
C fu si on sp lic e di re ct c on ne ct or s.
V ia M ai nt en es /H an d-ho le s St ta nc e (F m en t
IT
B
(n ew
, 2 2, B
A
, 2 3, 4, 5, (n ew
, 4
4A , 5 al l a st ra nd in do or /o ut do or r te d si ng le m od e
(S M
) f ib er o pt ic c
8.
3F
, F O
8-
5, -1 2)
In
IT
B te rm in at e th e ne w st
FO
o n po rts
3-o f t he n ew F
O D
P in st al le d ab ov
EB
ro ut e th e
FO
C to ro om fo llo w in g th e ne w c ab le p at h in st al le d ab ov e.
T he re a re a va ila bl e sl ot s i n th e
FO
D P at th e to p of th e ex ist in g fib er ra ck
Te rm in at e th e ne w st ra nd F
O C in th
P.
C oo rd in at e w ith
1C S fo r te rm in at io n de ta ils
Se e
Sk et ch
A
PW
S
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, –F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge al l t he F ol lo w in g Si ng le
M od e Fi be r
O pt ic C ab le
A ll fib er o pt ic c ab le s s ha ll be te rm in at ed u si ng L
C fu si on sp lic e di re ct c on ne ct or s.
V ia M ai nt en es /H an d-ho le s St ta nc e (F m en t
IT
B
0B
, 1
A , 1
, 1
2, , 1
3, , 6
A
In st al l a st ra nd si ng le m od e
(S M
) f ib tic c ab le (1
2L 8.
3F , F
O
5-
, 1 -1
2)
In
IT
B in st al l a n ew h i d en si ty po rt
FO
D P in th e ex is tin g ra ck R
R
5.
Te rm in at e th e ne w st ra nd
F O
C o n po rts
1-o f t he n ew F
O D
P (S ee sk et ch
, 6
A
In C
EB
ro ut e th e
FO
C to ro om us g th e ex is tin g ca bl e pa th . T he re av la bl e sl ot s i n th e
FO
D
Ps a t t he to p of e ex is tin g fib er ra ck
. T er m in at e th e ne ra nd F
O C in th is F
O D
P.
C oo rd in at e w ith
1C S fo r t er m in at io n de ta ils
Se e
Sk et ch
IT
B
(n ew
9, 1, U N
K , 1
, 6 A
In st al l a st ra nd si ng le m od e (S
M ) f ib tic c ab le
(1 2L
8.
3F
, F O
5-
, 1
-1 2)
In
IT
B te rm in at e th e ne w st o n po rts
3-o f t he n ew F
O D
P in st al le d ab ov e (S ee sk et ch
, 6
A
In C
EB
ro ut e th e
FO
C to ro om us g th e ex is tin g ca bl e pa th . I ns ta ll a ne d en si ty po rt
FO
D
P in th e ex is tin g ck
1B . T er m in at e th e ne w st ra nd
F O
F
O D
P.
C oo rd in at e w ith
1C S fo r te rm in at io n de ta ils
Se e
Sk et ch
–F O
C E xp an si on
IT
B
C
EB
, 8 a nd
IT
B
C
EB
7, Se pt em be r 2
Pa ge
Page | 27
2.2.6 Project Residue
All residues from this project shall be disposed of off base and in accordance with Federal, State, local and base environmental laws and regulations. All residue produced by horizontal directional boring operations (i.e., slurry) shall be disposed of off base on the same day the residue is produced, at an appropriate disposal facility at the contractor’s expense, IAW federal and state environmental laws and regulations. Under no circumstances will the contractor stage or store boring residue in slurry ponds or other containment areas on Peterson AFB.
2.2.7 Site Restoration
The Contractor shall restore all disturbed grounds to the “as found” condition or better after installation. The Contractor shall comply with all base grounds restoration requirements. Common use areas shall be restored with sod.
2.2.8 Service Outages
The Contractor shall be responsible for preventing any unscheduled (i.e. cutting or disabling any in-service cables or equipment.), Contractor-caused, interruptions of communications capabilities that are properly identified. The Contractor shall coordinate planned outages with the site POC at least 10 calendar days in advance of the outage if the implementation necessitates disruption of service, (e.g., communications, electrical, or other utilities).
2.2.9 Configuration Management N/A
2.2.10 Identification/Marking
The Contractor shall clearly mark all Contractor-Furnished Property and Equipment (CFP/CFE) with their company's name. The Contractor shall place an easily read, very visible, sign (minimum 8.5" x 11") on large containers, construction equipment, or un-manned rental vehicles while on the Government installation indicating the company name and both the Contractor and Site POC's names and local telephone numbers.
2.2.11 Installation Schedules
The Contractor shall provide a complete milestone schedule in MS Project Gantt Chart format (compatible with MS Project 2010) that denotes project activities to include time-phased start and completion dates for the project and any sub-projects.
2.2.12 Weekly Status Reports
The Contractor shall prepare a Weekly Status Report and distribute to IPT members. The purpose of the report is to inform IPT members of project progress, problems being encountered, and other topics necessary/beneficial to ensure success and timely completion of the contract requirements.
2.2.13 Drawings
2.2.13.1 As-Built Drawings
The Contractor shall submit red line drawings showing the “as-built” configuration in format specified by base SCX project manager. The base communications squadron will provide baseline drawings.
The Contractor shall provide As-Built Rack Elevation, Inside Cable Plant and Outside Cable Plant drawings.
Page | 28
2.2.13.2 Butterfly Drawings
The Contractor shall record and submit butterfly, cable path and building penetration drawing information for all new installations including butterfly drawings for all Maintenance Holes, hand-holes and pull-boxes that contain new or reused FOC. Drawings shall record the path and arrangement of new duct-banks, ducts, and inner-duct.