This is a request for quotes (RFQ) from the Department of the Air Force for outside plant fiber optics expansion projects at Peterson Space Force Base in Colorado. The solicitation seeks a contractor to engineer, furnish, install, and test new fiber optic cabling infrastructure in four separate projects. Project one involves buildings 1, 1038, 1470 and 1844; project two involves buildings 1038, 2025, 2027 and 2028; project three involves building 1038 and 2025; and project four between buildings 3, 1038 and 2025 is an option. The period of performance for the first three projects is six months from award date in September 2021. Quotes are due by September 13, 2021 and pricing must be provided using the CLIN structure in the RFQ. The requirement is set aside for a service-disabled veteran-owned small business. The selected contractor will complete all specified work in the performance work statements for each project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
UNITED STATES SPACE FORCE
PETERSON-SCHRIEVER GARRISON
8 September 2021
FROM: 21 CONS/PKB
135 Dover Street, Ste. 2225
Peterson SFB, CO 80914-1055
SOLICITATION NUMBER: FA2517-21-Q-0047
SUBJECT: Request for Quotes (RFQ) for 21 CS Outside Plant (OSP) Fiber Optics Expansion
AMENDMENT ONE (1): INCLUDES CHANGES TO PWS ATTACHMENTS (ATTTACHMENTS I-III)
SEE ATTACHMENTS FOR CHANGES.
i. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
ii. This Request for Quotes (RFQ), FA2517-20-Q-0047 is in support of the 21st Communications
Squadron (21 CS) for the outside plant (OSP) installation of fiber optic cabling infrastructure in accordance with (IAW) the Performance Work Statement (PWS) (Attachments 1, 2, 3, and 4) for four separate and distinct projects (Projects I, II, III, and IV) with project IV as an option.
iii. The solicitation document and incorporated provisions and clauses are those in effect through Federal
Acquisition Circular 2021-06.
iv. A single award will be made as a result of evaluation of the quotes received. The NAICS code for this requirement is 238210 – Electrical Contractors, Other Wiring Installation Contractors. The size standard is $16.5M. This requirement is a 100% Service Disabled Veteran Owned Small Business
(SDVOSB) set-aside. Responses received from a contractor not a part of the SDVOSB program will not be accepted.
v. As detailed below, this requirement includes the four separate OSP projects, separated by labor and supplies:
CLIN Line Item Description Unit Qty.
0001 Project 1: Labor required for work IAW Attachment 1: PWS OSP I
(Bldgs. 1, 1038, 1470 and 1844)
The contractor may bill against this CLIN upon completion of project I.
Each 1
0002 Project 1: Materials required for work IAW PWS OSP I –
The Bill of Materials must be submitted and accepted in WAWF by a government official. Upon acceptance, the materials become property of the Government.
Each 1
0003 Project 2: Labor required for work IAW Attachment 2: PWS OSP II (ITB
1038 – CEB 350, 845; ITB 2025 – CEB 2027, 2028)
The contractor may bill against this CLIN upon completion of project II
0004 Project 2: Materials required for work IAW PWS OSP II Each 1
Page | 2
The Bill of Materials must be submitted and accepted in WAWF by a government official. Upon acceptance, the materials become property of
0005 Project 3: Labor required for work IAW Attachment 3: PWS OSP III
(Bldg. 1038 - 2025)
The contractor may bill against this CLIN upon completion of project III.
Each 1
0006 Project 3: Materials required for work IAW PWS OSP III
The Bill of Materials must be submitted and accepted in WAWF by a government official. Upon acceptance, the materials become property of
0007 (OPTION) Project 4: Labor required for work IAW
Attachment 4: PWS OSP IV (Bldgs. 3 to 1038 and 2025)
The contractor may bill against this CLIN upon completion of project IV.
Each. 1
0008 (OPTION) Project 4: Materials required for work IAW PWS OSP IV
The Bill of Materials must be submitted and accepted in WAWF by a government official. Upon acceptance, the materials become property of
vi. Each project requires the contractor to engineer, furnish, install and test (EFI&T) new fiber optic cable infrastructure within multiple buildings at Peterson Space Force Base in Colorado. Each project must be completed in accordance with the requirements specified in the corresponding PWS (Attachments
1, 2, 3, and 4). Offerors are expected to complete all work in accordance with the four attached PWS documents if they are selected for award, at the prices specified in their quote. Project IV will occur as an option IAW 52.217-9. The Contracting Officer will provide one (1) day of intent to exercise of the option prior to the end of the contract. The option will be exercised on or before 3 January
2022.
vii. Performance shall take place on Peterson Space Force Base (PSFB) IAW each project’s PWS. The expected period of performance for the completion of all projects (1-3) shall be six (6) months from date of award, with performance starting in September 2021.
viii. Addendum to: Provision at FAR 52.212-1, Instructions to Offerors – Commercial (Jul 2021)
a. To ensure full compliance with this solicitation document, offerors must follow the instructions and meet all solicitation requirements, including provisions and clauses, and representations and certifications. Any offeror who submits an incomplete quote or does not conform to all instructions in this document may be considered non-compliant, and the quote may not be evaluated.
b. Offerors shall assume that the Government has no prior knowledge of their experience and capabilities, and will base its evaluation solely on the information that the offeror presents in their quote.
c. Offerors are advised to submit adequate information to enable evaluators to fully determine the offeror’s capability to perform the requirements of the PWS. The quote shall be clear and include sufficient detail for effective evaluation. The data submitted shall be accurate, complete, and concise. The offeror is fully expected to perform all objectives in the PWS documents at the prices specified in their quote.
Page | 3
d. The Government reserves the right to cancel this solicitation, either before or after the closing date.
In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs they may occur. The Government intends to make a selection based on the initial quote submissions without conducting interchanges. Therefore, each quote should contain the Offeror’s best terms from a price, and technical, standpoint. Interchanges may be conducted with one, some, or all offerors as the Government is not required to conduct interchanges with any or all Offerors responding to this solicitation. Interchanges are fluid interaction(s) between the Contracting Officer (CO) and the Offerors that may address any aspect of the quote and may or may not be documented in real time.
e. Acceptance Period: The offeror agrees to hold the prices firm for 90 days from the date specified for receipt of offers.
f. Amendment(s) to the Solicitation (if applicable): The Government reserves the right to revise or amend the solicitation documents prior to the date of receipt of quotes. The Government will make no changes to the solicitation without an amendment. Amendments will be posted to SAM.gov; it is the responsibility of the offeror to check the website and related postings for amendments to the solicitation. Offerors shall acknowledge receipt of any amendment(s) in conjunction with submittal of a quote. Any unacknowledged amendment(s) in the offeror’s quote may render the offeror’s entire quote non-compliant and ineligible for award.
g. Solicitation response: Volume I, responses to this solicitation document shall not exceed twenty
(20) pages (page count does not include indices, or table of contents). Volume II Pricing: there is no page limit for the pricing volume. Offerors are expected to submit their responses to include the following structure:
Volume 1: Cover Page: The Cover Page shall include the RFQ number and solicitation title, offeror’s business name, address, CAGE code, DUNS number, primary and alternate points of contact (who are authorized to contractually obligate the company), SDVOSB small business status under NAICS code 238210, and a short statement that the offeror understands the requirements specified and will meet the performance standards and requirements therein.
Volume I – Factor 1: Technical Capability: This section shall include all information pertinent to the requirement that enables the evaluators to identify that the offeror is capable of performing all contractual actions. The offeror shall not merely regurgitate the requirements of the PWS.
Offerors shall provide a response to the following:
Sub-Factor 1: The offeror shall provide an approach on how to engineer, furnish, install, and test (EFI&T) a complete OSP fiber optics expansion project, to include a flowchart detailing the steps required to support your approach. The offeror’s approach shall address the requirements from any one of the three base projects (Attachments: 1, 2, or 3).
Volume 2 – Factor 2: Pricing: This section shall include all information regarding the pricing of materials and labor required to complete all four OSP projects as stated in the attached PWS documents (attachments 1-4). Offerors are required to prepare a Firm-Fixed-Price (FFP) priced quote for labor and materials. At a minimum, pricing shall be provided in the CLIN structure outlined in Table 2 – Pricing Structure. Pricing submission shall include labor categories, labor rates, labor hours and a full bill of materials, which will become Government furnished equipment upon acceptance by a Government official.
Page | 4
Table 2 – Pricing Structure
CLIN Line Item Description Unit Qty. Unit
Price
Extended
Amount
0001 Project 1: Labor required for work IAW
Attachment 1: PWS OSP I (Bldgs. 1, 1038, 1470 and 1844)
The contractor may bill against this CLIN upon completion of project I.
Each 1
0002 Project 1: Materials required for work IAW
PWS OSP I
The Bill of Materials must be submitted and accepted in WAWF by a government official.
Upon acceptance, the materials become property of the Government.
0003 Project 2: Labor required for work IAW
Attachment 2: PWS OSP II (ITB 1038 – CEB
350, 845; ITB 2025 – CEB 2027, 2028)
The contractor may bill against this CLIN upon completion of project II.
Each 1
0004 Project 2: Materials required for work IAW
PWS OSP II
The Bill of Materials must be submitted and accepted in WAWF by a government official.
Upon acceptance, the materials become
0005 Project 3: Labor required for work IAW
Attachment 3: PWS OSP III (Bldg. 1038 -
2025)
The contractor may bill against this CLIN upon completion of project III.
Each 1
0006 Project 3: Materials required for work IAW
PWS OSP III
The Bill of Materials must be submitted and accepted in WAWF by a government official.
Upon acceptance, the materials become
0007 (OPTION) Project 4: Labor required for work IAW Attachment 4: PWS OSP IV
(Bldgs. 3 to 1038 and 2025)
Should funding become available, the contractor may bill against this CLIN upon completion of project IV.
Each 1
0008 Project 4: Materials required for work IAW
PWS OSP IV
The Bill of Materials must be submitted and accepted in WAWF by a government official.
Upon acceptance, the materials become
Page | 5
Total:
ix. Addendum to: Provision at FAR 52.212-2, Evaluation – Commercial Items (Oct 2014).
a. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Factor 1 – Technical Acceptability: The technical evaluation team will evaluate Sub-Factor 1 contained in Volume I – Factor 1, Technical Capability, and rate it as either “Unacceptable” or
“Acceptable”. An “Acceptable” rating is required to be considered for award. An “Unacceptable” rating may render the entire quote unacceptable and therefore, un-awardable. The response will be evaluated in the following way:
Sub-Factor 1: To be rated “Acceptable”: ‘Volume I – Factor 1, Technical Capability’ must contain a response that details the approach required to EFI&T a complete fiber optics project.
The evaluation team must be able to identify that a complete end-to-end, functional and feasible approach has been developed with a sequenced rollout of steps. An “Acceptable” response must include a flowchart. An “Acceptable” response must include how the offeror will complete the project.
Factor 2 – Price: Price will be evaluated based upon the total contract value, including the option, in order to determine if the quoted price is fair and reasonable in accordance with FAR 13.106-3.
a. Evaluation Process: Quotes will be ordered from lowest to highest price. The Government will evaluate the two lowest priced quotes for Factor 1 – Technical Acceptability. If both lowest priced quotes are technically acceptable, then the evaluation will stop and the Government will award to the lowest priced quote. If either, or both, of the two lowest priced quotes are not technically acceptable, the Government will evaluate the next lowest priced quote for technical acceptability.
This process will continue until there are two technically acceptable quotes. The Government will then award to the lowest priced, technically acceptable offeror.
x. Offerors are advised to include a completed copy of the provision at FAR 52.212-3 (Oct 2018), Offeror Representations and Certifications – Commercial Items, with their offer.
xi. Clause 52.212-4, Contract Terms and Conditions – Commercial Items (Oct 2018), applies to this acquisition
xii. Clause 52.212-5, Contract Terms and Conditions Required to Implement Statues or Executive Orders
– Commercial Items (Jul 2021), applies to this acquisition.
xiii. Clause 52.245-1, Government Property (Jan 2017) applies to this acquisition.
xiv. Other Applicable Clauses
a. DFARS 252.245-7001, Tagging, Labeling, and Marking of Government-Furnished Property (Apr
2021)
b. DFARS 252.245-7002. Reporting Loss of Government Property (Jan 2021)
Page | 6
c. DFARS 252.245-7003, Contractor Property Management System Administration (Apr 2012)
d. AFFARS 5352.201-9101 Ombudsman (Oct 2019)
i. An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
ii. Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution.
Consulting an ombudsman does not alter or postpone the timelines for any other processes
(e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
iii. If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, AFICC/OL-SPC Director or Deputy Director of Contracting 250 S Peterson
Blvd, Peterson AFB, CO 80914 (P) 719-554-5300, Workflow e-mail: afica.ks.wf@us.af.mil.
Concerns, issues, disagreements, and recommendations that cannot be resolved at the
Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary
(ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
iv. The ombudsman has no authority to render a decision that binds the agency.
v. Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.
e. This solicitation and the resulting contract is subject to the Service Contract Labor Standards statute
(the Service Contract Act), see attachment 6 for wage determinations.
f. Additional applicable clauses and provisions can be found in Attachment 5: Additional Provisions and
Clauses.
xv. RESERVED
xvi. Offerors are strongly encouraged to attend a site visitation at Peterson Space Force Base to gain a better understanding of the requirement. Answers to questions asked during the site visitation will be posted to SAM.gov and all interested contractors. Please contact the Contract Specialist via email
(see section xvi) if you are interested in a site visitation NLT 1:00pm Mountain Time on
MONDAY, 30 August 2021, please include your attendee names (first and last), no more than 2 per company. There will also be a telecom line for individuals to call in. Note** On the day of the site visit, be prepared to provide driver’s license information for all participants requiring access to the installation. The site visitation will take place at Peterson Space Force Base, CO, on Tuesday, 31
August 2021 at 7:00 a.m. Mountain Time for approximately eight (8) hours.
Please submit all questions in writing via e-mail to the Contracting Officer and Contract Specialist.
All questions are due no later than 12:00 p.m. Mountain Time on 02 September 2021.
mailto:afica.ks.wf@us.af.mil
Page | 7
Please submit all quotes via e-mail to the Contracting Officer and Contract Specialist. Ensure that the
RFQ number and title are referenced in the subject line. Quotes are due no later than 10:00 a.m.
Mountain Time on 13 September 2021, no extensions will be granted.
xvii. Contact Information:
Contracting Officer: Sheri Burks; sheri.burks@spaceforce.mil; 719-556-4789
Contract Specialist: Casey Watson; casey.watson.5@us.af.mil; 719-556-8987
All communications with the requiring activity (21st Communications Squadron) shall cease until the award is announced. During this period, interaction is only allowed with the Contracting Officer.
Sheri L. Burks
Contracting Officer
List of six (6) Attachments:
(1) PWS OSP Project I (Rv 7 September 2021)
(2) PWS OSP Project II (Rv 7 September 2021)
(3) PWS OSP Project III (Rv 7 September 2021)
(4) PWS OSP Project IV – OPTION
(5) Additional Provisions and Clauses
(6) Wage Determinations mailto:sheri.burks@spaceforce.mil mailto:casey.watson.5@us.af.mil
| 2021-09-08T17:05:55-0600 | |
| BURKS.SHERI.L.1368162201 |
File details come from the government source that posted it. Updated .