Attachment 1 - Performance Work Statement 15 Jan 20.pdf

PDF 62 KB Posted

Attached to
Building One (1) Plant Maintenance Federal contract opportunity
Solicitation number
FA2517-20-R-0004
Issued by
Department of the Air Force Space Command

View the file

Other files for this federal contract opportunity

Other files attached to Building One (1) Plant Maintenance, newest first.
File Type Posted
Questions and Answers 23 Jan site visit.pdf PDF
Combo Plant Maint f Amend Two.pdf PDF
Attachment 3 - 15-5417 Wage Determination.txt TXT text file
Attachment 2 - Additional Applicable Clauses and Provisions 23 Jan.pdf PDF
Combo Plant Maint Amend One Signed.pdf PDF
Combo Plant Maintenance 17 Jan 20 f.pdf PDF
Attachment 2 - Additional Applicable Clauses and Provisions 17 Jan 20.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

AIR FORCE SPACE COMMAND

(AFSPC)

BUILDING ONE

(Bldg-1)

PLANT MAINTENANCE

15 January 2020

1. SCOPE:

1.1 The Contractor shall furnish all labor, tools, materials, and transportation necessary to conduct weekly inspection and maintenance of all live foliage/plants in AFSPC HQ Bldg 1, Peterson AFB, CO. Contract performance location listed in paragraph 4.

1.2 There are approximately 341 plants/live foilage and 20 trees throughout the building. Plant/Tree Types include: Ficus Tree, Marginata Branch, Bamboo Palm, Fish Tail Palm, Amate Shcefflera, Dracaena Marginata, Dracaena Massangeana Cane, Kentia, Norfolk Island Pine, Janet Craig, Dracaena Janet Craig Cane, Massangeana Cane, Warneckii, Warneckii Tips, Spath, Neanthe, Bella Palm, Pothos, Pothos – HB, Philo-Selloum, Dwarf Shefflera, Croton, Varagated.Arboricola, Rhapis Palm, Reflexa, Sanseveria, Majesty Palm, Aglaonema, Spath Sensation,Aglo-Hybrid, Corn Tips, Ivy- Hanging Baskets, Pole Pothos, Algerian, Dracaena Marginata, Aspidistra. Plants and Trees listed above are located on the atrium floor and in planters that catwalk the west atrium.

2. REQUIREMENTS:

The contractor shall perform weekly inspection and maintenance on all live foliage plants in AFSPC Bldg-1 as follows:

2.1 Check for proper moisture level and water as needed

2.2 Clean and trim plants

2.3 Remove debris, dead leaves and trash from soil and floor areas upon completion of maintenance.

2.4 Add soil/mulch to soil surface as needed to keep plants healthy

2.5 Rotate plants to predominant light sources as needed

2.6 Provide proper levels of plant nutrients

2.7 Inspect and treat for disease or insect infestation in accordance with local, State, and Federal regulations.

2.8 Water sources are available on all floors of the building. Due to safety concerns, water hoses will not be utilized for watering plants; professional watering equipment/tanks shall be used to water plants.

2.9 The contractor shall replace, any expired or diseased plants, and any plants that reach maximum growth in pot or are determined unhealthy by the contractor and/or Facility Manager. All replacement plants will be of the same type or equal to that being replaced and must be approved by AFSPC Bldg-1 Facility Manager before being planted.

3. GENERAL REQUIREMENTS:

3.1 Security Clearance or Access to Building 1: The contractors performing the work will be given a “T” badge that allows temporary access to all common areas of building 1.

The contractor must comply with the host bases instructions for entry to the base.

3.2 Working hours: The building is open for contract performance from Monday – Friday, 07:30 to 16:30, except federal holidays and Air Force Space Command (AFSPC) family days are considered non-duty days.

3.3 AFSPC Calendar Year 2019/2020 planned closures:

3.3.1: 29 November 2019 3.3.2: 24 December 2019 3.3.3: 31 December 2019

3.4.1: AFSPC CY 2020

3.5: 17 January 2020 3.5.1: 14 February 2020 3.5.2: 22 May 2020 3.5.3: 6 July 2020 3.5.4: 4 September 2020 3.5.5: 9 October 2020 3.5.6: 27 November 2020 3.5.7: 24 and 31 December 2020 3.5.8: Any Federal Holidays granted via Executive Order 3.5.9: Option year dates – TBD

4. CONTRACT PERFORMANCE LOCATION:

AFSPC BLDG 1, 150 Vandenberg St Peterson AFB, CO 80914-4020