Microwave Measurement Receiver, 26. 5GHz and 50GHz
Solicitation number
FA2263-20-R-0006
Issued by

About this file

This document package outlines requirements for a federal contract to procure Microwave Measurement Receivers at 26.5GHz and 50GHz frequencies. The solicitation is seeking proposals for the design, development, integration, test, and delivery of up to 25 receivers across the two frequency bands. Responses are due by September 15, 2020 and the period of performance is 24 months from award. The Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base is the contracting agency. The Data Requirements List specifies technical manuals and documentation to be delivered at various stages of the contract, including preliminary drafts within 90 days of award and final versions with first unit deliveries. Pricing is to be provided for the engineering services and production units. Delivery locations are also identified for the receivers and accompanying documentation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A002
2_TITLE_OF_DATA_ITEM: Technical Manual Contract Requirements (TMCR)
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: TM-86-01
5_CONTRACT_REFERENCE: PD 20E-102A/B-RF Atch
6_REQUIRING_OFFICE: AFLCMC/WNME
7_DID_250_REQ: N/A
8_APP_CODE: N/A
DIST_STATEMENT: A
10_FREQUENCY: ASREQ
11_AS_OF_DATE: ASREQ
12_DATE_OF_FIRST_SUBMISSI: See BLK 16
13_DATE_OF_SUBSEQUENT_SUB: See BLK 16
addressee1:
draft1:
reg1:
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5: 1
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10: AFMETCAL
draft10:
reg10:
repro10:
addressee11: ATTN: Kathy Vaccaro
draft11:
reg11:
repro11:
addressee12: 813 Irving Wick Dr W
draft12:
reg12:
repro12:
addressee13: Horton Building
draft13:
reg13:
repro13:
addressee14: Heath, OH 43056
draft14:
reg14: 1
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19: ship with unit
draft19:
reg19: 1
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23: ship to addressee
draft23:
reg23: 1
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28: ship with unit
draft28:
reg28: 4
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_repro: 0
16_REMARKS: TMCR requirements for the 50GHz MMR

BLK 8: The Government has 30 calendar days to review the preliminary draft. The contractor has 10 calendar days after receipt of Government comments to prepare and deliver revised data. Criteria for approval shall meet the Government comments. Reference the contract number in all correspondence. Final approval after first production acceptance.

BLK 9: The following statement shall be included on the manuals:

DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.

Blk 12: No later than 90 days after contract award, one (1) copy of the final manual is required on CD/DVD in indexed Portable Document Format (iPDF). Ship to addressee #1 listed in BLK 14a. If manuals are available electronically, the file or web link may be sent to kathryn.vaccaro@us.af.mil. Reference contract number in all correspondence. (engineer)

Blk 13: No later than 180 days after contract award, concurrent with delivery of first production units, the contractor shall furnish and pack one (1) set of manuals with each of the first production units. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.

Blk 13: No later than 30 days after after first production acceptance, one (1) copy of the final manual is required. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). Ship to addressee #1 listed in BLK 14a. (logistics)

Blk 13: No later than 90 days after first production acceptance, concurrent with delivery of production units, the contractor shall furnish and pack one (1) set of manuals with each production unit. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: Kathryn A. Vaccaro
H_DATE: 17 July 2020
1_APPROVED_BY: Allan Long
J_DATE: 17 Jul 2020
Page:
reg38t: 7
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: A
TDP:
TM: X
OTHER:
DSYSTEMITEM: Microwave Measurement Receiver (MMR)
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages:
Reset:
2020-07-20T07:30:48-0400
VACCARO.KATHRYN.ANN.1013242310
2020-08-04T13:59:41-0400
LONG.GEORGE.ALLAN.1271080758

File details come from the government source that posted it. Updated .