Q and A from Site Visit.doc

DOC document 27 KB Posted

Attached to
Wireless Broadband Federal contract opportunity
Solicitation number
F4D1F10088AC01
Issued by
Department of the Air Force Space Command

About this file

Question and Answers from Site visit

View the file

Other files for this federal contract opportunity

Other files attached to Wireless Broadband, newest first.
File Type Posted
951299B-E132-Electrical.pdf PDF
951299B-E141-1ST FLOOR.pdf PDF
951299B-E602-Electrical.pdf PDF
951299B-E143-3RD FLOOR.pdf PDF
951299B-E131-Electrical.pdf PDF
951299B-E142-2ND FLOOR.pdf PDF
951299B-E641-Electrical.pdf PDF
Q A.doc DOC document
RFQ.doc DOC document
Question and Answer.doc DOC document
SOW Wireless Broadband High Speed Internet Access Dormitory Dayrooms.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F4D1F10088AC01

Question and Answers from Site Visit April 12, 2010 1:00pm 1.On the statement of work you do not list that you want the offices to contain wireless, however when we were conducting the walk it was the understanding of the dorm manager that the offices were to be included.

ANSWER:Paragraph 6.6 of the SOW indicates exact location will be identified during the survey. It is my understanding Bldg. 13323 (Snark) currently is a dorm mangers office. The office is being converted to a day room.

2.Are repeaters allowed on the poles?

ANSWER:Poles are real property and will need to be worked through 30 CES. The prospective contractor will need to complete a AF Form 332, Base Civil Engineer Work Request identifying the work to be accomplished.

3.Is the contractor responsible for the computers in GI Java to have wireless?

ANSWER: No. GI Java will need to provide wireless antennas for their own computers.

4.Are there chase ways between buildings?

ANSWER:No.