This Addendum No. 2 document modifies the contract specifications for Job No. F48C612A, Keaiwa Heiau State Recreation Area Water System Improvements, issued by the State of Hawaii Department of Land and Natural Resources Engineering Division. The addendum revises multiple plan sheets (C-5 through C-16 and S-2) to incorporate design changes including new quick coupling valves, gate valves, air relief valves, and modifications to tank areas and building foundations. The specifications section includes significant updates: deletion and replacement of the proposal form, addition of evaluation criteria and method of award procedures, incorporation of three new specification sections (01230 for Additive Bid Items, 02226 for Roadway Excavation, and 02512 for Asphalt Concrete), revision of pavement markings requirements, and comprehensive revisions to testing and chlorination procedures. Two additive bid items were added: Additive 1 for stone veneer application on the bladder tank building exterior walls and Additive 2 for road repair work. The project consists of replacement of approximately 4,211 linear feet of 3-inch PVC waterline, installation of four 80-gallon bladder tanks with manifolds, construction of a new tank enclosure building, clearing and grubbing, asphaltic concrete pavement work (14 square yards base, plus additional square yards for additives), root barrier installation (4,087 linear feet), arborist services, controlled low strength material backfill (14 cubic yards), and site best management practice measures. The virtual pre-bid conference was held May 12, 2026, with the bid opening scheduled for May 28, 2026 at 2:00 p.m., and the anticipated Notice to Proceed expected in Fall 2026. The contract requires completion within 300 consecutive calendar days from the notice to proceed, with liquidated damages of $200 per calendar day assessed for delays.
Bidders must submit proposals through the Hawaii e-Procurement System (HIePRO) including completed proposal forms, bid bonds, and all required documentation. The evaluation methodology prioritizes the lowest responsive and responsible bid after application of applicable preferences, including a 10 percent recycled products preference and a 5 percent apprenticeship agreement preference for certified participants. Additive items are evaluated sequentially within a project control budget, with the state announcing the control budget after solicitation closure and evaluating all bids on the basis of the same additive items. Successful bidders must obtain performance and payment bonds equal to 100 percent of the total contract price, maintain Hawaii contractor licensing, and comply with prevailing wage requirements established by the Department of Labor and Industrial Relations. The contract includes mandatory compliance with Act 68, SLH 2010, requiring that 80 percent of the workforce employed be Hawaii residents. Bidders are required to hold pricing for 365 days from bid opening, and no incumbent contractors are identified for this project. The estimated project cost is approximately $700,000, with all funding sourced from state appropriations. The Field Office Allowance is set at $10,000, and mobilization and demobilization costs are capped at 10 percent of the subtotal base bid. Successful award is contingent upon funds being available for the project and requires submission of tax clearance certificates from both the Hawaii Department of Taxation and Internal Revenue Service, a Certificate of Compliance from the Department of Labor and Industrial Relations, and a Certificate of Good Standing from the Department of Commerce and Consumer Affairs or certification through the Hawaii Compliance Express program.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Job No. F48C612A Keaiwa Heiau State Recreation Area Water System Improvements Aiea, Hawaii Addendum No. 2 Page 1 of 4
State of Hawaii
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
1151 Punchbowl Street, Room 221
Honolulu, Hawaii 96813
ADDENDUM NO. 2
TO
Keaiwa Heiau State Recreation Area Water System Improvements
Aiea, Hawaii
The items listed hereinafter are hereby made a part of the contract for the above project and shall govern the work, taking precedence over previously issued plans and specifications governing the items mentioned.
PLANS (Revisions by description only unless referenced by attached figures.)
1. Sheet C-5 – General Plan, Replace sheet with the attached Sheet C-5.
a. Added Note 14.
2. Sheet C-6 – Plan & Profile 1, Replace sheet with the attached revised Sheet C-6.
a. Added new quick coupling valve.
3. Sheet C-7 – Plan & Profile 2, Replace sheet with the attached revised Sheet C-7.
a. Added new gate valve and Air relief valve.
4. Sheet C-8 – Plan & Profile 3, Replace sheet with the attached revised Sheet C-8.
b. Revised pipe stub out.
c. Added detail.
5. Sheet C-9 – Plan & Profile 4, Replace sheet with the attached revised Sheet C-9.
6. Sheet C-10 – Plan & Profile 5, Replace sheet with the attached revised Sheet C-10.
a. Added new quick coupling valve.
b. Added new air relief valve.
c. Revised piping and tanks for bladder tank area.
d. Revised existing redwood tank structure to remain in place.
7. Sheet C-12 – Plan & Profile 7, Replace sheet with the attached revised Sheet C-12.
Aiea, Hawaii Addendum No. 2 Page 2 of 4
8. Sheet C-13 – Plan & Profile 8, Replace sheet with the attached revised Sheet C-13.
a. Added new quick coupling valve.
9. Sheet C-14 – Plan & Profile 9, Replace sheet with the attached revised Sheet C-14.
10. Sheet C-15 – Water Details, Replace sheet with the attached revised Sheet C-15.
a. Added new detail.
11. Sheet C-16 – Water Details 2, Replace sheet with the attached revised Sheet C-16.
a. Revised Tank Building Layout Detail
12. Sheet S-2 – Tank Enclosure Building, Replace sheet with the attached revised Sheet S-2.
a. Revised Building Foundation Plan.
SPECIFICATIONS
1. Proposal- Delete in its entirety and replace with the attached revised Proposal.
a. Added new bid items.
b. Deleted ¾” Hose bibb and Demolition of existing structure bid items.
c. Added Additive 1 – Stone Veneer
d. Added Additive 2 – Road Repair.
e. Revised Condition of Award Section, 1st paragraph.
f. Added Joint Contractors or Subcontractors List for Additive 1 and Additive 2.
2. Information and Instruction to Bidders – Delete in its entirety and replace with the attached revised Information and Instruction to Bidders.
a. Added Paragraph K – Evaluation Criteria
b. Added Paragraph L – Method of Award
3. Table of Contents – Delete in its entirety and replace with the attached revised Table of Contents.
4. Add new Section 01230 – Additive Bid Items.
5. Add new Section 02226 – Roadway Excavation.
6. Add new Section 02512 – Asphalt Concrete.
7. Section 02577 – Pavement Markings – Delete in its entirety and replace with attached revised
Section 02577.
a. Entire section was revised.
Aiea, Hawaii Addendum No. 2 Page 3 of 4
8. Section 02675 – Testing and Chlorination -Delete in its entirety and replace with the attached revised Section 02675.
a. Added Subsection 3.1.B for pressure testing working pressure requirements.
b. Revised Subsection 3.2.D Chlorination.
9. Add new Section 04400 – Stone Masonry.
GENERAL INFORMATION
A virtual pre-bid meeting was held on May 12, 2026. The pre-bid meeting agenda and attendees are attached for information only. The following questions were received during the meeting and through HIePRO, along with their corresponding responses.
1. Question: Will the root barrier be installed on both sides of the waterline for the entire alignment
Response: The root barrier is generally intended to be installed only on the side where tree roots are present. In most cases, this will be on one side of the waterline only. If roots are encountered on both sides, installation may be required on both sides in those specific areas.
The quantity in the Proposal is intended to correspond approximately to the same linear footage as the waterline.
2. Question: Is CLSM required only at roadway crossings, and is the entire trench at those crossings to be filled with CLSM?
Response: Yes. The intent is for the trench at roadway crossings to be fully backfilled with CLSM in accordance with the trench detail in the plans and specifications.
3. Question: Will there be restrictions on construction phasing or limits on the amount of work area/trenching that can be open at one time to accommodate park guests and visitors?
Response: The existing water system must remain operational until the new system is fully installed, tested, and ready to convert from the old system to the new system. Contractor access and work areas may proceed as needed provided that:
Public access through the park is maintained, Open trench safety requirements are followed, and Excessive open trench lengths are avoided.
See Addendum 1 for requirements for open trenches.
4. Question: Was clearing and grubbing just within the trench limits or is there another limit?
Response: Where needed for construction purposes and for the site area. This includes things like trimming trees if required for equipment.
Water System Improvements Aiea, Hawaii Addendum No. 2 Page 4 of 4
5. Question: Are there restrictions related to native birds nesting near the project area, and would that limit use of equipment or work activities near trees?
Response: The primary area of concern is near the northern trailhead and the new bladder tank area, where the was once surveyed in the area. The area appears to be cleared so no construction restrictions are anticipated. Also, a DLNR, Division of Forestry and Wildlife Biologist will inspect the site prior to construction. Contractors should remain mindful of biological resource protection requirements.
6. Question: Since bidders are required to hold pricing for 365 days, when is the anticipated Notice to Proceed (NTP)?
Response: We anticipate NTP sometime in Fall of 2026. Potential protests or pending permits could delay the schedule.
7. Question: What is the existing water system pressure at the park for purposes of pressure testing requirements?
Response: The pressure at the pump station is approximately 140 PSI. The specifications require testing pressures of approximately 225 PSI in accordance with the specifications.
8. Question: Can you clarify the chlorination method to be used?
Response: AWWA standards will be used.
9. Question: Is there any electrical work?
Response: No electrical work.
10. Question: In the proposal Base Bid Line Item 5. LS Arborist Services. The Arborist Services is a Lump Sum. Are the Arborist Services only needed when the contractor does the Asphalt trench pavement repair?
Response: The arborist services is for the whole project. Arborist should be retained and consulted to review the contractors potential work and in the event they need to trim roots.
Engineering Division
Dina U. Lau Acting Chief Engineer
I-1 Addendum 2
INFORMATION AND INSTRUCTIONS TO BIDDERS
CONTENTS
Page
A Project Location and Scope of Work ....................................................................I-2 B Proposals ........................................................................................................... I-2 C General Conditions ........................................................................................... I-2 D Proposal Form ................................................................................................... I-2 E Omissions or Erasures ....................................................................................... I-2 F Notice of Intent to Bid and Questionnaire .......................................................... I-2 G Bid Security ...................................................................................................... I-2 H Contractor’s License Required ........................................................................... I-3 I Irregular Bids .................................................................................................... I-3 J Withdrawal of Bids ........................................................................................... I-3 K Evaluation Criteria ............................................................................................ I-3 L Method of Award .............................................................................................. I-3 M Successful Bidder to File Performance and Payment Bonds ............................ I-3 N Number of Executed Original Counterparts of Contract Documents ............... I-3 O Change Orders .................................................................................................. I-4 P Wages and Hours .............................................................................................. I-4 Q Permits ................................................................................................................ I-4 R Property Damage ................................................................................................ I-4 S Time .................................................................................................................. I-4 T Bidder's Responsibility to Provide Proper Superintendence .............................. I-5 U Liquidated Damages ......................................................................................... I-5 V Hiring of Hawaii Residents ................................................................................ I-5 W Water and Electricity ........................................................................................ I-5 X Public Convenience and Safety ........................................................................ I-5 Y Work to be Done Without Direct Payment.......................................................... I-6 Z As-Built Drawings ............................................................................................ I-6 AA Asbestos Containing Materials ......................................................................... I-6 BB Worker Safety ..................................................................................................... I-6 CC Toilet Facilities ................................................................................................. I-6 DD Signs .................................................................................................................. I-6 EE Field Office for Department .............................................................................. I-7 FF Quantities .......................................................................................................... I-7 GG Other Health Measures ..................................................................................... I-7 HH Hawaii Business Requirement .......................................................................... I-7 II Compliance With §3-122-112 HAR ...................................................................I-7
I-2
INFORMATION AND INSTRUCTIONS TO BIDDERS
A. PROJECT LOCATION AND SCOPE OF WORK: The project location and scope of work shall be as generally described in the Notice to Bidders.
B. PROPOSALS: Bidders shall submit their bid, including the completed proposal form, bid bond, and any other documents required by the solicitation as part of their bid through the State of Hawaii e-Procurement System (HIePRO). See Item D, PROPOSAL FORM.
C. GENERAL CONDITIONS: The Department of Land and Natural Resources Interim General Conditions dated October 1994, as amended, shall be made a part of these contract specifications and are referred to hereafter as the General Conditions.
D. PROPOSAL FORM: The Bidders shall fill out and upload the electronic copy of the proposal form to the HIePRO website when submitting the bid. Bid Proposals shall not be mailed, faxed or delivered to the State, unless requested to do so after the designated closing date. The successful Bidder shall fill out and print a hard copy of the proposal form, sign and submit the form with the contract award package.
E. OMISSIONS OR ERASURES: Any proposal which contains any omission or erasure or alteration not properly initialed, or conditional bid, or other irregularity may be rejected by the Board of Land and Natural Resources (Board).
F. NOTICE OF INTENT TO BID AND QUESTIONNAIRE:
A Notice of Intent to Bid is not required for this project. In compliance with HRS Section 103D-310, the lowest responsive and responsible bidder may be required to complete a questionnaire. When requested by the State, the completed questionnaire shall be submitted to the Chief Engineer for evaluation. Failure to furnish the requested information within the time allowed may be grounds for a determination of non-responsibility, in accordance with HRS Section 103D-310 and HAR Section 3-122-108.
G. BID SECURITY: A bid security will be furnished by each bidder as provided in sub-section
2.7 of the General Conditions. The successful bidder's bid security will be retained until Contract execution and furnished a performance and payment bond in an amount equal to one hundred percent (100%) of the total Contract price, including an amount estimated to be required for extra work, is furnished.
The Board reserves the right to hold the bid securities of the four lowest bidders until the successful bidder has entered into a contract and has furnished the required performance bond. All bid securities will be returned in accordance with sub-section 3.5 of the General Conditions.
Should the successful bidder fail to enter into a contract and furnish a satisfactory performance bond within the time stated in the proposal, the bid security shall be forfeited as required by law.
I-3
H. CONTRACTOR'S LICENSE REQUIRED: The Board will reject all bids received from contractors who have not been licensed by the State Contractors License Board in accordance with Chapter 444, HRS; Title 16, Chapter 77, Hawaii Administrative Rules; and statutes amendatory thereto.
I. IRREGULAR BIDS: No irregular bids or propositions for doing the work will be considered by the Board.
J. WITHDRAWAL OF BIDS: No bidder may withdraw his bid between the time of the opening thereof and the award of contract.
K. EVALUATION OF CRITERIA:
1. The total lump sum base bid price and additives will be adjusted to reflect the applicable preferences.
2. Evaluating Bids with Additive Bid Items:
a. After the solicitation ends, the State will announce the project control budget.
All bids will be evaluated on the basis of the same additive item.
b. If the Base Bids of all the Bidders are within the project control budget (after application of the various preferences), Additive 1 and then Additive 2 are added to the Base Bid amount. This (these) sum(s) are compared to the project control budget and must be within the project control budget.
c. The Bidder with the lowest Base Bid or lowest aggregate amount (Base Bid plus additives), within the project control budget, is the “Low Bidder” for the project and is designated for award.
L. METHOD OF AWARD:
1. The contract will be awarded to the lowest responsive and responsible Bidder whose bid, including any additive(s), meets the requirements and criteria set forth in the solicitation documents and as determined by the Board of Land and Natural Resources.
2. In the event the Lump Sum Base Bid of all bidders exceeds the project control budget, the Department reserves the right to make an award to the bidder with the lowest total lump sum base bid, after application of the preferences is designated, if additional funds are available or by reducing the scope of work through negotiation.
M. SUCCESSFUL BIDDER TO FILE PERFORMANCE AND PAYMENT BONDS: The successful bidder will be required to file performance and payment bonds each; in the amount equal to the total contract price, including amounts estimated to be required for extra work, as provided in sub-section 3.6 of the General Conditions.
N. NUMBER OF EXECUTED ORIGINAL COUNTERPARTS OF CONTRACT
DOCUMENTS: If requested by the Board, six copies of the Contract, performance and payment bonds shall be executed.
I-4
O. CHANGE ORDERS: No work of any kind in connection with the work covered by the plans and specifications shall be considered as change order work, or entitle the Contractor to extra compensation, except when the work has been ordered in writing by the Chief Engineer (Engineer) and in accordance with sub-section 4.2 of the General Conditions.
The Contractor shall clearly identify and inform the Engineer in writing of any deviations from the contract documents at the time of submission and shall obtain the Engineer's written approval to the specified deviation prior to proceeding with any work.
P. WAGES AND HOURS: In accordance with sub-sections 7.3 to 7.9 of the General Conditions relative to hours of labor, minimum wages and overtime pay, the current minimum wage rates promulgated by the Department of Labor and Industrial Relations (DLIR) shall be paid to the various classes of laborers and mechanics engaged in the performance of this contract on the job site. The minimum wages shall be increased during the performance of the contract in an amount equal to the increase in the prevailing wages for those kinds of work as periodically determined by the DLIR.
The Department of Land and Natural Resources will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the said minimum wage rates. The possibility of wage increase is one of the elements to be considered by the Contractor in determining his bid, and will not, under any circumstances, be considered as the basis of a claim against the Department under this Contract.
No work shall be done on Saturdays, Sundays, legal State holidays, and/or in excess of eight
(8) hours each day without the written consent of the Engineer. Should permission be granted to work at such times, the Contractor shall pay for all inspection administrative costs thereof. No work shall be done at night unless authorized by the Engineer.
Q. PERMITS: The State will process permit applications whenever possible, and the Contractor shall procure the pre-processed permits and pay the required fees. If permit applications are not processed by the State, the Contractor shall process the permit applications, permits and licenses, and pay all charges and fees. In all cases, the Contractor shall give all notices necessary and incident to the due and lawful prosecution of the work.
R. PROPERTY DAMAGE: It shall be the responsibility of the contractor to respect State property and to prevent damage to existing improvements. The Contractor will be responsible for damages resulting from construction operations. Immediately upon discovery, the Contractor shall repair such damage to the satisfaction of the Engineer.
All trees and shrubbery outside the excavation, embankment or construction limits shall be fully protected from injury.
S. TIME: The time of completion is specified in the Proposal. It is the Board's intention to insist the Contractor diligently prosecute the work to completion within the specified time.
Prospective bidders are reminded that the State has the option to proceed with or abandon a project depending on whether the project can be completed for occupancy in the specified time.
I-5
It is the bidder's responsibility to check the availability of all materials before bidding. The bidder shall select sub-contractors and suppliers who can warrant availability and delivery of all specified or qualified materials to assure project completion within the specified time.
The successful bidder must assume all risks for completing the project by the specified date.
There shall be no extension of time for any reason except for delays caused by acts of God, labor disputes involving unions, or actions of the State. If for any reason the project falls behind schedule, the Contractor shall at its own cost, take necessary remedial measures to get the project back on schedule, i.e., working overtime, air freighting all materials, etc. In addition, if the Contractor fails to fully complete the project by the completion date, Contractor will be required to make the facility usable at its own cost.
T. BIDDER'S RESPONSIBILITY TO PROVIDE PROPER SUPERINTENDENCE: The successful low bidder shall designate in writing to the Engineer the name of its authorized superintendent (Superintendent), who will be present at the job site whenever any work is in progress. The Superintendent shall be responsible for all work, receiving and implementing instructions from the Engineer in a timely manner. The cost for superintendence shall be considered incidental to the project.
If the Superintendent is not present at the site of work, the Engineer shall have the right to suspend the work as described under sub-section 5.5 c. and 7.20 - Suspension of Work of the General Conditions.
U. LIQUIDATED DAMAGES: Liquidated damages in the amount specified in the Proposal will be assessed for each and every calendar day from and after the expiration of the time period stated in the Contract for the completion of the project.
V. HIRING OF HAWAII RESIDENTS: The Contractor shall comply with Act 68, SLH 2010, in the performance and for the duration of this contract. The Contractor shall ensure that Hawaii residents compose not less than eighty percent of the workforce employed to perform the contract work on the project. The eighty percent requirement shall be determined by dividing the total number of hours worked on the contract by Hawaii residents, by the total number of hours worked on the contract by all employees of the Contractor in the performance of the contract. The hours worked by any Subcontractor of the Contractor shall count towards the calculation for this section. The hours worked by employees with shortage trades, as determined by the Department of Labor and Industrial Relations (DLIR), shall not be included in the calculation for this section.
The requirements shall apply to any subcontract of $50,000 or more in connection with the Contractor, that is, such Subcontractors must also ensure that Hawaii residents compose not less than eighty percent of the Subcontractor’s workforce used to perform the subcontract.
W. WATER AND ELECTRICITY: The Contractor shall make all necessary arrangements and pay all expenses for water and electricity used in the construction of this project.
X. PUBLIC CONVENIENCE AND SAFETY: The Contractor shall conduct construction operations with due regard to the convenience and safety of the public at all times. No materials or equipment shall be stored where it will interfere with the safe passage of public traffic. The Contractor shall provide, install, and maintain in satisfactory condition, all necessary signs, flares and other protective facilities and shall take all necessary precautions for the protection of the work and the convenience and safety of the public. The Engineer shall
I-6 have the right to suspend the performance of the work in accordance with sub-section 7.20 - Suspension of Work of the General Conditions.
Y. WORK TO BE DONE WITHOUT DIRECT PAYMENT: Whenever the contract that the
Contractor is to perform work or furnish materials of any kind for which no price is fixed in the contract, it shall be understood that the Contractor shall perform such work or furnish said materials without extra charge or allowance or direct payment of any sort. The cost of performing such work or furnishing said material is to be included by the Contractor in a unit price for the appropriate item unless it is expressly specified that such work or material is to be paid for as extra work.
Z. AS-BUILT DRAWINGS: As-built drawings, the intent of which is to record the actual in-place construction so that any future renovations or tie-ins can be anticipated accurately, shall be required. All authorizations given by the Engineer to deviate from the plans shall be drawn on the job site plans. All deviations from alignments, elevations and dimensions which are stipulated on the plans shall be recorded on the as-built drawings. Final as-built drawings shall be submitted to the Engineer for review and approval. After the Engineer approves the as-built drawings, the contractor shall submit an electronic copy in Adobe PDF format on CD ROM.
AA. ASBESTOS CONTAINING MATERIALS: The use of asbestos containing materials or equipment is prohibited. The Contractor shall insure that all materials and equipment incorporated in the project are asbestos-free
BB. WORKER SAFETY: The Contractor shall provide, install and maintain in satisfactory condition all necessary protective facilities and shall take all necessary precautions for the protection and safety of its workers in accordance with the Occupational Safety and Health Standards for the State of Hawaii. The Engineer shall have the right to suspend the performance of the work in accordance with sub-section 7.20 - Suspension of Work of the General Conditions.
CC. TOILET FACILITIES: All toilet facilities constructed at the project site shall be in accordance with the Public Health Regulations of the State Department of Health (DOH). All necessary precautions shall be observed at the project site. The use of sanitary facilities shall be strictly enforced and workers violating these provisions shall be promptly discharged.
DD. SIGNS: Whenever the project involves closing or obstructing any public thoroughfare, the Contractor shall provide traffic signs conforming to the applicable provisions of the current edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways", published by the Federal Highway Administration as directed by the Engineer for the purpose of diverting or warning traffic prior to the construction area. All traffic signs shall bear proper wording stating thereon the necessary information as to diverting or warning traffic.
When indicated in the Proposal, the Contractor shall provide a project sign, size 4'-0" x 7'-0" to be placed as directed by the Engineer. The sign shall be constructed in accordance with Section 01581 - Project Sign of these specifications and approved by the Engineer. All wording, type and size of lettering and color selection shall be as specified in these specifications or as approved by the Engineer.
All signs shall be kept neat and clean, and properly erected at all times.
I-7
EE. FIELD OFFICE AREA FOR DEPARTMENT: When indicated in the Proposal, the Contractor shall provide a housed working area of at least 100 square feet adjacent to the Contractor's office for the Department's use. This area will be used by the Engineer to perform tests and to store equipment. As a minimum, the field office shall include the following: standard sized office desk and chair, lighting, ventilation, window-type air conditioning rated at 5,000 BTU, door and window with locking hardware, electrical outlets, and working communications facilities (a cellular telephone is acceptable). The Department will pay for all long distance toll charges made by the Engineer.
FF. QUANTITIES: All bids will be compared on the basis of quantities of work to be done as shown in the Proposal; the quantities shown in the Unit Price items are estimated, being given as a basis for comparison of bids. The Board reserves the right to increase or decrease the quantities given under the items or delete items entirely as may be required during the progress of the work.
GG. OTHER HEALTH MEASURES: Forms of work site exposure or conditions which may be detrimental to the health or welfare of workers or of the general public shall be eliminated or reduced to safe levels as required by the DOH codes, standards, and regulations. Suitable first aid kits and a person qualified to render first aid, as specified in the DOH regulations, shall be provided at all times when work is scheduled.
HH. HAWAII BUSINESS OR COMPLIANT NON-HAWAII BUSINESS REQUIREMENT:
Bidders (Contractors) shall be incorporated or organized under the laws of the State or be registered to do business in the State as a separate branch or division that is capable of fully performing under the contract, as stipulated in §3-122-112 HAR.
II. COMPLIANCE WITH §3-122-112 HAR:
As a condition for award of the contract and as proof of compliance with the requirements of 103D-310(c) HRS, the apparent low bidder shall furnish the required documents to the Department. If the valid required certificates are not submitted on a timely basis for award of a contract, a bidder otherwise responsive and responsible may not receive the award. Bidder is responsible to apply for and submit the following documents to the Department.
A. TAX CLEARANCE REQUIREMENTS (HRS Chapter 237): Bidder shall obtain a tax clearance certificate from the Hawaii State Department of Taxation (DOTAX) and the Internal Revenue Service (IRS). The certificate is valid for six months from the most recently approved stamp date on the certificate; the certificate must be valid on the date received by the Department.
B. Department of Labor (DLIR) “Certificate of Compliance”. (HRS Chapter 383 -
Unemployment Insurance, Chapter 386 - Workers’ Compensation, Chapter 392 - Temporary Disability Insurance, and 393 – Prepaid Health Care): Bidder shall obtain a certificate of compliance from the Hawaii State Department of Labor and Industrial relations (DLIR). The certificate is valid for six months from the date of issue;
certificates must be valid on the date received by the Department.
C. Department of Commerce and Consumer Affairs (DCCA), Business Registration
Division (BREG) “Certificate of Good Standing”. Bidder shall obtain a certificate of good standing issued by the Department of Commerce and Consumer Affairs (DCCA), Business Registration Division (BREG). The certificate of good standing is valid for
I-8 six months from the date of issue; certificates must be valid on the date received by the Department.
Alternately, instead of separately applying for these certificates at the various state agencies, bidder may choose to use the Hawaii Compliance Express (HCE), which allows businesses to register online through a simple wizard interface at http://vendors.ehawaii.gov to acquire a “Certificate of Vendor Compliance” indicating the bidder’s status is compliant with the requirements of §103D-310(c), HRS, and shall be accepted for contracting and final payment purposes. Bidders that elect to use the new HCE services will be required to pay an annual fee of $12.00 to the Hawaii Information Consortium, LLC (HIC). Bidders choosing not to participate in the HCE program will be required to provide the paper certificates as instructed in the previous paragraphs.
P-1
P R O P O S A L
FOR
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DIVISION
State of Hawaii
Aiea, Hawaii
__________________________, 2026
Chief Engineer Engineering Division Department of Land and Natural Resources State of Hawaii Honolulu, Hawaii
Dear Sir:
The undersigned, having carefully examined the local conditions and all available records and information covering conditions which may affect the cost of the work to be performed, and having carefully examined the Plans and Specifications, and other contract documents, hereby proposes to furnish and pay for all materials, tools, equipment, labor and other incidental work necessary. The work shall consist of replacement of an existing water line, new water bladder tanks, new tank enclosure building and related site work, as required or called for in this Proposal, all according to the true intent and meaning of the Notice to Bidders, Information and Instructions to Bidders, Proposal, Detailed Specifications, Interim General Conditions, Plans, and any and all addenda for:
Aiea, Hawaii on file in the office of the Engineering Division for the TOTAL BASE BID (Items 1-33) of:
Dollars ($_____________________) and will fully complete all work under this contract within 300 consecutive calendar days from the date of written notice to proceed, including date of said order, said total sum being itemized on the following pages.
P-2
PROPOSAL
Item No. Quantity Unit Description Unit Price Total
BASE BID
1. LS Clearing and grubbing LS $
2.
SY
1-1/2" thick asphaltic concrete pavement (State Mix No. V) inclusive of surface preparation, in place complete $ $
3.
SY
6" thick base course for A.C. Pavement inclusive of compaction, in place complete $ $
4. 4087 LF Root Barrier $ $
5. LS Arborist Services LS $
6.
4,211
LF
Furnish and install 3-inch SCH 80 PVC waterline inclusive of excavation, backfill, solvent weld, detector wire, couplings, and appurtenances in place complete. $ $
7.
EA
New 2-inch Copper lateral to existing comfort station including removing existing valve boxes, and installation of new WSS Type "B" Meter box and valves. $ $
8.
CY
Controlled Low Strength Material CLSM for backfill of waterlines under roads. $ $
9. 3 EA
3"x3"x2" PVC SCH 80 Tee, Solvent Welded $ $
10. 2 EA
3"x3"x1" PVC SCH 80 Tee, Solvent Welded $ $
11. 20 EA
3" PVC SCH 80 1/32 Bend, Solvent Welded $ $
12. 21 EA
3" PVC SCH 80 1/16 Bend, Solvent Welded $ $
13. 12 EA
3" PVC SCH 80 1/8 Bend, Solvent Welded $ $
14. 6 EA 3" Gate Valve & Box, in place complete $ $
15. 1 EA 2" Cover and Cap, in place complete $ $
16. 1 EA
1" Air Relief Valve Unit and Box, in place Complete $ $
P-3
PROPOSAL
Item No.
Quantity
Unit Description
Unit Price Total
BASE BID
17. 5 CY
DWS 2,500 concrete for reaction blocks, test blocks, concrete beams, slabs, inclusive of necessary structural struts, straps, rods, reinforcing steel and appurtenances, with Geotextile Fabric for abrasion resistance, in place complete.
18.
LS
Site BMP measures for water pollution and erosion and sediment control during construction phase of project, including installation, maintenance, and removal at end of project
LS
19.
12 LF
3" Type "K" Copper Waterline In Place Complete including pipe anchors fittings, and tape wrap.
20. 2 EA 3" Brass Elbow
21. 1 EA 3" x 3" x 2" Brass Tee
22. 1 EA 2" x 2" x 1/2" Brass Tee
23. 1 EA
1/4" Pressure Gauge w/ 2-1/2" diameter face and minimum pressure rating of 0- 100 psi including 1/2" to 1/4 inch bushing.
24.
4 EA
Ford B11 2" ball valve with stainless steel handle and attachment nuts or approved equal.
25.
4 EA
Install new 80 Gallon Bladder Tank including manifold and 3-inch manifold and 1-1/4Inch connection in place complete.
26. 7 EA
New 3/4 - Inch anti-rotation quick coupling valve in place complete including ball valve, piping, valve/meter box fittings and appurtenances.
27. LS
Pressure testing and chlorination for new waterline and laterals.
LS
28. 13 CY
Unclassified excavation for Tank Building, including 2' over excavation.
29. LS Bladder Tank Building, in place complete. LS
30. 1 CY
Concrete for sidewalk in place complete including reinforcing steel.
P-4
PROPOSAL
Item No.
Quantity
Unit Description Unit Price Total
Base Bid
31. 1 EA Project Sign
32. Allowance Field Office Allowance $ 10,000.00
Subtotal Base Bid (Items 1-32) $
33. LS
Mobilization and Demobilization (not to exceed 10% of the Subtotal Base Bid)
LS $
Total Base Bid (Items 1-33) $
Additive 1 Stone Veneer
34. LS
Provide and install 4-inch thick natural lava moss rock veneer on all four (4) exterior sides of the bladder tank building CMU walls, complete with mortar, anchors/ties, flashing, weeps, joint finishing, and all labor, materials, equipment, and incidentals necessary for a complete installation. $ $
Total Additive 1 Bid (Item 34) $ Additive 2
Road Repair
35. 4000 SY
Resurface road (entire width) and parking areas with 1-inch asphalt concrete overlay, including surface preparation, repair of potholes, cracks, and depression, in place complete. $ $
36. 900 SY
1-1/2" thick asphaltic concrete pavement (State Mix No. V) inclusive of surface preparation, in place complete $ $
37. 900 SY
6" thick base course for A.C. Pavement inclusive of compaction, in place complete LS $
38. 5 EA
Remove and replace existing speed bumps, in place complete $ $
39. 780 LF
Replace pavement markings, 4-inch wide white parking stall lines, in place complete.
40. 3 EA
Replace existing arrow pavement markings, white, in place complete $ $
Subtotal Additive 2 (Items 35 - 40) $
41. LS
Mobilization and Demobilization (not to exceed 10% of the Subtotal Additive 2 Bid)
LS
Total Additive 2 Bid (Items 35 -41) $
P-5
RECYCLED PRODUCTS PREFERENCE
This project allows a 10% price preference for recycled products in accordance with HRS 103D-1005.
Please indicate your selection of recycled or non-recycled product by indicating its cost FOB jobsite unloaded in the schedule below, including applicable General Excise & Use Taxes.
RECYCLED NONRECYCLED
DESCRIPTION PRODUCT COST PRODUCT COST
The bidder requesting a recycled product preference shall also complete and submit the form “CERTIFICATION OF RECYCLED CONTENT” as shown in the Interim General Conditions and provide all supporting information with this proposal. Additional information may be requested to qualify a product.
The following definitions are applicable to the CERTIFICATION OF RECYCLED CONTENT form:
"Post-consumer recovered material" means any product used by a consumer, including a business that purchases the material, that has served its intended end use, and that has been separated or diverted from the solid waste stream for the purpose of use, reuse, or recycling.
"Product" includes materials, manufactures, supplies, merchandise, goods, wares, and foodstuffs.
"Recovered material” means waste material and by-products that have been separated, diverted, or removed from the solid waste stream after a manufacturing process for the purpose of use, reuse, or recycling. Recovered material does not include those materials and by-products that are generated and normally reused on-site or within original manufacturing processes (such as mill broke, in the case of paper products).
"Recycled content” means the percentage of a product composed of recovered material, or post-consumer recovered material, or both.
"Recycled product” means a product containing recovered material, or post-consumer recovered material, or both.
The bidder agrees that preference for recycled products shall be taken into consideration to determine the low bidder in accordance with said Section and the rules promulgated, however, the award of contract will be in the amount of the bid offered exclusive any preference.
P-6
APPRENTICESHIP AGREEMENT PREFERENCE
1. If applicable to this project, any bidder seeking the preference must be a party to an apprenticeship agreement registered with the State Department of Labor and Industrial Relations (DLIR) at the time the bid is submitted for each apprenticeable trade the bidder will employ to construct the project. “Employ” means the employment of a person in an employer-employee relationship.
a. The apprenticeship agreement shall be registered with the DLIR and conform to the requirements of Hawaii Revised Statutes Chapter 372.
b. Subcontractors do not have to be a party to an apprenticeship agreement for the bidder to obtain preference.
c. The bidder is not required to have apprentices in its employ at the time the bid is submitted to qualify for the preference.
2. A bidder seeking the preference must state the apprenticeable trade the bidder will employ for each trade to be employed to perform the work by submitting a completed signed original Certification Form 1 verifying participation in an apprenticeship program registered with DLIR.
“Apprenticeable trade” shall have the same meaning as “apprenticeable occupation” pursuant to Hawaii Administrative Rules (HAR) §12-30-5.
a. The Certification Form 1 shall be authorized by an apprenticeship sponsor listed on the
DLIR list of registered apprenticeship programs. “Sponsor” means an operator of an apprenticeship program and in whose name the program is approved and registered with the DLIR pursuant to HAR §12-30-1.
b. The authorization shall be an original signature by an authorized official of the apprenticeship sponsor.
c. The completed signed original Certification Form 1 for each trade must be submitted with the bid. Previous certifications shall not apply.
d. When filling out the Certification Form 1, the name of Apprenticeable Trade and
Apprenticeship Sponsor must be the same as recorded in the List of Construction Trades in Registered Apprenticeship Programs that is posted on the DLIR website. “Registered apprenticeship program” means a construction trade program approved by the DLIR pursuant to HAR §12-301 and §12-30-4.
e. The Certificate Form 1 and the List of Construction Trades in Registered Apprenticeship
Programs is available on the DLIR website at: http://hawaii.gov/labor/wdd.
3. Upon receiving the Certification Form 1, the Procurement Officer will verify that the apprenticeship program is on the List of Construction Trades in Registered Apprenticeship Programs and that the form is signed by an authorized official of the Apprenticeship Program Sponsor. If the programs and signature are not confirmed by the DLIR, the bidder will not qualify for the preference.
4. If the bidder is certified to participate in an apprenticeship program for each trade which will be
P-7 employed by the bidder for the project, a preference will be applied to decrease the bidder’s bid amount by five percent (5%) for evaluation purposes.
5. Should the bidder qualify for other preferences, all applicable preferences shall be applied to the bid price.
CONTRIBUTIONS BY STATE AND COUNTY CONTRACTORS PROHIBITED
Contractors are hereby notified of the applicability of Section 11-355, HRS, which states that campaign contributions are prohibited from specified State or county government contractors during the term of the contract if the contractors are paid with funds appropriated by a legislative body.
P-8
CONDITION OF AWARD
It is understood that the award of the contract will be made on the basis of the lowest responsible Total Base Bid and Additive Bids in accordance with the “Information and Instruction to Bidders”, Items K and L, and as selected by the Board of Land and Natural Resources.
It is understood and agreed that the Board of Land and Natural Resources reserves the right to reject any and/or all bids and waive any defects when, in the Board's opinion, such rejection or waiver will be for the best interest of the State of Hawaii.
In the event all bids exceed available funds certified by the appropriate fiscal officer, the head of the purchasing agency responsible for the procurement in question is authorized in situations where time or economic considerations preclude resolicitation of work of a reduced scope to negotiate an adjustment of the bid price, including changes in the bid requirements, with the low responsible and responsive bidder, in order to bring the bid within the amount of available funds. It is understood and agreed upon that the head of the purchasing agency may delete a portion or all of any item(s) in the proposal at the stated unit or lump sum price as necessary to stay within the available funding. The bidder is responsible to make an earnest effort to represent the actual cost of each item, including all materials, labor, equipment, overhead and profit in their bid proposal to preclude claims of anticipated profit or loss of profit because of an unbalanced bid proposal.
It is also understood that if a mutually agreeable cost for the reduced scope of work necessitated by a lack of available funds cannot be agreed upon between the bidder and the head of the purchasing agency within 14 calendar days after the bid opening, then the bid may be rejected in the best interest of the purchasing agency, and the head of the purchasing agency may negotiate in progressive order (lowest to highest) with the next lowest responsible and responsive bidder.
It is also understood and agreed that the award of the contract shall be conditioned upon funds being made available for this project and further upon the right of the Board of Land and Natural Resources to hold all bids received for a period of one hundred eighty (180) days from the date of the opening thereof, unless otherwise required by law, during which time no bid may be withdrawn.
It is also understood that Notice to Proceed may be delayed up to three hundred and sixty-five (365) calendar days after the bid opening date, and that no additional compensation will be provided for any claim for escalation or delay for issuance of Notice to Proceed on or before that date.
It is also understood and agreed that the quantities given herewith are approximate only and are subject to increase or decrease, and that the undersigned will perform all quantities of work as either increased or decreased, in accordance with the provisions of the Contract Specifications.
It is also understood and agreed that the estimated quantities shown for the items for which a UNIT PRICE is asked in this Proposal are only for the purpose of comparing on a uniform basis, bids offered for the work under this contract, and the undersigned agrees that he is satisfied with and will at no time, dispute said estimated quantities as a means of claims for anticipated profit or loss of profit, because of a difference between the quantities of the various classes of work done or the materials and equipment installed, and the said estimated quantities. On UNIT PRICE bids, payment will be made only for the actual number of units incorporated into the finished project at the contract UNIT PRICE.
After the HIePRO bid due date and time, the figures will be extended and/or totaled in accordance with the bid prices of the acceptable proposals and the totals will be compared. In the comparison of bids, words written in the proposal shall govern over figures and unit prices will govern over totals. Until
P-9 the award of the contract, however, the right will be reserved to reject any and all proposals and to waive any defects or technicalities as may be deemed best for the interest of the State.
It is also understood and agreed that liquidated damages in the amount of Two Hundred and No/100 dollars ($200.00) for each and every calendar day in excess thereof prior to completion of the contract shall be withheld from payments due to the Contractor.
It is also understood and agreed that if this bid is accepted, the successful bidder must enter into and execute a contract with the Board of Land and Natural Resources and furnish a Performance and Payment Bond, as required by law. These bonds shall conform to provisions of Section 103D-324 and 325, Hawaii Revised Statutes and any law applicable hereto.
It is also understood and agreed that the successful bidder will provide all necessary labor, materials, tools, equipment, and other incidentals necessary to do all the work and furnish all the materials specified in the contract in the manner and time herein prescribed, and according to the requirements of the Engineer as therein set forth.
It is understood that by submitting this proposal, the undersigned is declaring that his firm has not been assisted or represented on this matter by an individual who has, in a State capacity, been involved in the subject matter of this contract in the past two years.
It is understood that by submitting this proposal in accordance with HAR 3-122-192, the undersigned is declaring that the price submitted is independently arrived without collusion.
It is also understood that by submitting this proposal, a Certification for Safety and Health Programs for bids in excess of $100,000 (in accordance with HRS 396-18), the undersigned certifies that his organization will have a written safety and health plan for this project that will be available and implemented by the Notice to Proceed date of this project. Details of the requirements of this plan may be obtained from the Department of Labor and Industrial Relations, Occupational, Safety and Health Division (HIOSH).
It is further understood and agreed that the successful bidder shall comply with paragraph 3.1.a "SUBCONTRACTING" of the General Provisions which requires that the contractor shall perform with his own organization and with the assistance of workmen under his immediate superintendence, work of a value not less than twenty percent (20%) of the value of all work embraced in the Contract, except that certain contract items of work, if specifically referred to in the special provisions, will be exempted from said twenty percent requirement.
Compliance with §103-310 HRS. As a condition of award all bidders shall comply with all laws governing entities doing business in the State, including Chapter 237 HRS (general excise tax);
Chapter 383 HRS (employment security – unemployment insurance); Chapter 386 HRS (workers compensation); Chapter 392 HRS (temporary disability insurance); and Chapter 393 HRS (pre-paid health care), and shall produce all documents to the State (DLNR, Engineering Division) required to demonstrate compliance with these subsections. Any bidder making a false affirmation or certification under this subsection shall be suspended and may be debarred from further offerings or awards pursuant to §103D-702 HRS.
P-10
RECEIPT OF ADDENDA
The bidder also acknowledges receipt of any and all addenda issued by the Engineering Division, by recording the date of receipt of the respective addenda in the space provided below:
Addendum Date Received Addendum Date Received
No. 1 ___________ No. 5 ___________ No. 2 ___________ No. 6 ___________ No. 3 ___________ No. 7 ___________ No. 4 ___________ No. 8 ___________
It is understood that failure to receive any such addendum shall not relieve the Contractor from any obligation under this Proposal as submitted.
It is also understood and agreed that if this Proposal is accepted and the undersigned should fail or neglect to contract as aforesaid, the Board may determine that the bidder has abandoned the Contract, and thereupon, forfeiture…