Attachment 1_Statement of Need_Amended.pdf
PDF 244 KB Posted
- Solicitation number
- F3N0425127A003
About this file
This document is a Statement of Need (SON) from the 435th Construction and Training Squadron at Ramstein Air Base, Germany, detailing requirements for acquiring four Mobile Aircraft Arresting System (MAAS) Trailers and associated equipment. The specific requirements include four new MAAS Trailers (Part #9D01164-908), BAK-12 Energy Absorber Unit mounting hardware, two Stanley Hydraulic Power Units, four MAAS Trailer Tool Kits (System #15196-101), and accompanying installation tools and hardware. The trailers are designed to support EUCOM's Operational Plans and facilitate launch and recovery operations for tail hook-equipped aircraft for both USAF and NATO. Vendors must be authorized and First Article Testing (FAT) approved by the Service Engineering Support Activity in accordance with AFI 20-106, with deliveries restricted to normal work hours (0800-1500), Monday through Friday, excluding German and American holidays.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A -2.pdf | ||
| Q and A -2.docx | DOCX document | |
| Combo_Synopsis_Solicitation_Amended.pdf | ||
| Solicitation Amendment 0003.docx | DOCX document | |
| Q and A -1.pdf | ||
| Solicitation Amendment 0002.docx | DOCX document | |
| Solicitation Amendment.docx | DOCX document | |
| Combo_Synopsis_Solicitation.pdf | ||
| Attachment 2_Figure Sheet.pdf | ||
| Attachment 1_Statement of Need.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
435TH CONSTRUCTION AND TRAINING SQUADRON
RAMSTEIN AIR BASE GERMANY
MEMORANDUM FOR 700th Contracting Squadron, Ramstein Air Base, Germany
FROM: 435th Construction and Training Squadron, Ramstein Air Base, Germany
SUBJECT: Statement of Need (SON) Mobile Aircraft Arresting System Trailer Acquisitions
1) General Description:
435th Construction and Training Squadron requires the acquisition of four (4) Mobile Aircraft Arresting System (MAAS) Trailers General Arrangement and (4) MAAS Trailer Tool Kits including shipping and freight. The request includes MAAS trailers, BAK-12 energy absorber mounting kit, Hydraulic Power Units Installation/removal tools, Installation/removal hardware. The MAAS support EUCOM’s Operational Plans as a deployable aircraft arresting system designed to support USAF and NATO launch and recovery operations of tail hook-equipped aircraft.
2) Minimum Specific Requirements:
4 Each MAAS Trailer Part #: 9D01164-908 (Each Trailer Shall be New)
BAK-12 Energy Absorber Unit (EAU) mounting hardware:
Hardware required to secure the BAK-12 Energy Absorber to the Trailer.
Stanley Hydraulic Power Units (HPU):2 EA
4 Each MAAS Trailer Tool Kits System # 15196-101
Tools for installation and removal on Asphalt, Concrete, and Soil.
MAAS Anchoring Hardware:
Hardware for installation and removal on Asphalt, Concrete, and Soil.
Manual Pendant Rewind Kit:
Pendant Kit shall accommodate 90ft and 153ft 1-1/4 inches in diameter.
Puncture-proof/rubber-filled tires:
3) First Article Testing:
Vendor must be authorized, and FAT approved by the Service Engineering Support Activity (ESA) in accordance with AFI 20-106, which is the Aircraft Arresting System (AAS) engineer at Warner Robins Air Logistics Complex (WR-ALC).
4) Hours of Operations:
All deliveries shall be performed during, normal work hours (0800-1500), Monday through Friday. No deliveries will be accepted on German and/or American Holidays.
All deliveries shall be performed as coordinated with the designated POC.
File details come from the government source that posted it. Updated .