Attachment 4 - Questions and Answers.pdf
PDF 65 KB Posted
- Attached to
- 26 WPS Door Replacement
- Solicitation number
- F3G5GA4234AW01
About this file
This document is a set of Questions and Answers related to a federal solicitation for the 26 WPS Door Replacement project. The solicitation seeks to replace doors at Nellis AFB in Nevada. Key details include:
The contract will be a Firm Fixed Price type with a 180-day delivery requirement. The work involves replacing approximately 6 doors with stained wood doors, some requiring electric strike access control. The government has flexibility on working hours and will provide the existing doors for disposal. Offerors must be registered in SAM and submit quotes by September 16, 2024 at 10:00 AM PDT. The contract will be awarded on a lowest-price, technically acceptable basis as a small business set-aside under NAICS code 238290.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4 – Questions and Answers
Q1. Is your command willing to be flexible with the 180-day requirement to complete work?
A1. Yes
Q2. What is the expectation for the 6 spaces to be non-operational once work begins?
A2 Contractor will need to be flexible to 26 WPS mission schedule.
Q3. Are the Doors Standard 3 ft X 7 ft?
A3. Yes
Q4. What is the type of finish on the wood door (scheme, stained, color)?
A4. Stained finish
Q5. Are doors in swinging or outswing/ left hand or right hand (Please be specific)?
A5. Please refer to the floor drawing to show the swing for each door. Rooms 212, 213, 214, 215, 221, & 223
Q6. Are doors required to be delivered on-site or can they be delivered to our facility to prep doors prior to install?
A6. Doors should be delivered to the contractor. 26 WPS has no storage area.
Q7. What type of access control do you have and want (Please be specific)?
A7. DXS Card and Keypad (2-Factor Authentication) with an Electric strike. 26 WPS currently has a DXS panel in room 235 but will need an expansion module to accommodate the additional doors.
Q8. What is the Core format?
A8. The locks on the door are BEST lock interchangeable 7-pin system.
Q9. Are the doors going to need to have a closure mounted (standard for STC doors due to weight) in addition to the standard CAM Hinges?
A9. Yes
Q10. Will your command be able to coordinate having a dumpster on-site to dispose of the old doors?
A10. The existing door will return to the government. The door frame will be removed and dispose by the contractor
Q11. Can working hours be modified (longer days, possibly nights/weekends)?
A11. Yes, but contractor shall provide a schedule and request to work weekends and longer hour a week prior, so that 26 WPS can check their schedule.
Q12. Will technicians be escorted at all times?
A12. Yes
Q13. Is there an elevator?
A13. Yes
Q14. Is there a loading dock?
A14. No
Q15. Is there an outside work area?
A15. No
Q16. What is the Paint Color for the Door Frame (Please provide a color code)?
A16. Gray, reference attachment 3.
Q17. What is the Paint Color for the Walls (Please provide a Color Code)?
A17. White, reference attachment 3.
Q18. What is the wall construction type (Please Specify)?
A18. The inside the room and on the hallway side, the sheetrock is 5/8” thickness X-type.
File details come from the government source that posted it. Updated .