Attachment 1 - Statement of Work v2.pdf
PDF 127 KB Posted
- Attached to
- 26 WPS Door Replacement
- Solicitation number
- F3G5GA4234AW01
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to install new wooden doors with metal frames to a specific sound transmission code (STC) of 49 at 26 WPS, Nellis Air Force Base in Nevada.
The key details are:
- The contractor shall remove and dispose of the existing wooden doors and metal framing, install new STC 49 rated wooden doors and metal frames, and perform associated work such as repairing wall damage, installing new electronic locks, and performing final cleanup.
- The anticipated contract type is Firm Fixed Price.
- The solicitation is a Request for Quotation (RFQ) set aside for small businesses under NAICS code 238290.
- Quotes are due by Monday, September 16, 2024 at 10:00 AM PDT, to be submitted via email.
- The government will award a single contract to the responsible vendor with the lowest-priced, technically acceptable quote.
- Contract completion is required within six months of award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
26 WPS Install wooden doors with metal frames to sound transmission code (STC) 49
SECTION I
DESCRIPTION OF SERVICES SPECIFIC TASKS
1. SCOPE OF WORK
1.1 The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary for the disassembly, move, and reassembly of furniture as defined in this Statement of Work.
2. LOCATION
2.1 The project site is located 26 WPS, 4276 Tyndall Ave, Bldg 119 on floor 2, Nellis Air Force Base, Nevada 89191.
3. DESCRIPTION OF WORK
3.1 Contractor shall remove and dispose of wooden door and metal framing on rooms 212, 213, 214, 215, 221 and 223 on the second floor of Bldg 119 currently in place. There are a total of six (6) doors.
3.1.1 Contractor shall protect in place all carpet, walls, and ceiling areas around work site.
3.1.2 Contractor shall remove all cylinder locks and provide lockset back to government.
3.1.3 Contractor shall repair any damages resulting from the performance of this contract and restore the existing walls to their previous condition matching existing paint colors and texture on both the office and the hallway side of the wall.
3.1.4 All cover vinyl base
3.2 Contractor shall install a new STC 49 wooden door and metal frame to match the same sound transmission rating of the new door.
3.3 Contractor shall stamp certify STC49 on frames and doors.
3.4 Contractor shall install door with 3 sets self-closing hinges.
3.5 Contractor shall install new electronic cylinder cipher lock to match base inner changeable cores. Government shall provide 7-pin core for door.
3.6 Contractor shall install metal threshold and insure seal match with door operations.
3.7 Contractor shall vacuum at the completion of installation and before the end of the duty day and prior to inspection.
3.8 Existing doors and hinges will be kept by the government.
4. FACILITIES DAMAGE:
4.1 The Contractor shall be responsible for all damage to furniture, buildings, facilities, and grounds, caused by his/her work forces or equipment, and shall repair said damages to the satisfaction of the Contracting Officer at no expense to the Government.
5. SCHEDULE
5.1 The Contractor shall prepare a written schedule of work to be performed and shall submit it to the Contracting Officer with their quote. Completion of work shall be within six months of contract award date.
6. WORKING HOURS
6.1 Working hours for the Contractor shall normally be between 07:30 am and 04:30 pm, Monday through Friday, excluding Federal holidays. If the Contractor desires to work during periods other than the above, they must identify by letter to the Contracting Officer at least five working days in advance of the dates desired and identify the work that shall be accomplished if approval is given. The Contractor shall not be reimbursed for any changes or work accomplished outside the scope of the contract without prior approval by the Contracting Officer. In addition to the above, close coordination with the Government must be maintained.
7. FINAL INSPECTION
7.1 The Contractor shall notify 99 Contracting Squadron and facility manager of 26 WPS for the final inspection and certification. Final clean up shall be made prior to any inspection.
All project documentation is required within 30 days of project acceptance, unless noted otherwise in the statement of work.
SECTION II
GENERAL INFORMATION
1. CONTRACTOR PERSONNEL REQUIREMENTS
1.1 The contractor shall provide the name of the responsible person who has full authority to act for the contractor on all matters relating to the performance of this contract. The name of this person or alternate(s) who shall act for the contractor when the responsible person is absent shall be designated in writing to the contracting office. The responsible person or alternate shall be available to discuss problem areas within 1 hour during normal duty hours and within 2 hours after normal duty hours. Normal duty hours for Nellis AFB are 07:30 am to 04:30 pm, Monday through Friday excluding Federal Holidays.
2. UNIFORM AND APPEARANCE
2.1 Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. While on duty, all employees shall wear a company unique uniform of the style and color normally used by industry. The uniform shall be always clean and neat in appearance.
3. SAFETY
3.1 There are no identified hazards on the designated property. Government shall provide an asbestos and lead base clearance letter for the area.
| STATEMENT OF WORK |
| 2. LOCATION |
| 3. DESCRIPTION OF WORK |
| 4. FACILITIES DAMAGE: |
| 5. SCHEDULE |
| 6. WORKING HOURS |
| 7. FINAL INSPECTION |
| SECTION II GENERAL INFORMATION |
| 2. UNIFORM AND APPEARANCE |
| 3. SAFETY |
File details come from the government source that posted it. Updated .