Attachment 1 - Statement of Work.pdf

PDF 126 KB Posted

Attached to
26 WPS Door Replacement
Solicitation number
F3G5GA4234AW01
Issued by

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to replace wooden doors with metal frames at the 26th Weapons Squadron (26 WPS) facility on Nellis Air Force Base in Nevada.

The SOW specifies that the contractor shall remove and dispose of the existing wooden doors and metal frames, protect surrounding areas, repair any damages, and install new STC 49-rated wooden doors with metal frames, including new electronic cylinder cipher locks. The work is to be completed within six months of contract award. The contract will be a Firm Fixed Price (FFP) award through a Request for Quote (RFQ) solicitation, set aside for small businesses under NAICS code 238290. The solicitation number is F3G5GA4234AW01, and quotes are due by September 16, 2024. The place of delivery is Nellis AFB, Nevada, and the anticipated contract type is FFP.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

26 WPS Install wooden doors with metal frames to sound transmission code (STC) 49

SECTION I

DESCRIPTION OF SERVICES SPECIFIC TASKS

1. SCOPE OF WORK

1.1 The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary for the disassembly, move, and reassembly of furniture as defined in this Statement of Work.

2. LOCATION

2.1 The project site is located 26 WPS, 4276 Tyndall Ave, Bldg 119 on floor 2, Nellis Air Force Base, Nevada 89191.

3. DESCRIPTION OF WORK

3.1 Contractor shall remove and dispose of wooden door and metal framing on rooms 212, 213, 214, 215, 221 and 223 on the second floor of Bldg 119 currently in place. There are a total of six (6) doors.

3.1.1 Contractor shall protect in place all carpet, walls, and ceiling areas around work site.

3.1.2 Contractor shall remove all cylinder locks and provide lockset back to government.

3.1.3 Contractor shall repair any damages resulting from the performance of this contract and restore the existing walls to their previous condition matching existing paint colors and texture on both the office and the hallway side of the wall.

3.1.4 All cover vinyl base

3.2 Contractor will install a new STC 49 wooden door and metal frame to match the same sound transmission rating of the new door.

3.3 Contractor will install door with 3 sets self-closing hinges.

3.4 Contractor shall install new electronic cylinder cipher lock to match base inner changeable cores. Government shall provide 7-pin core for door.

3.5 Contractor shall install metal threshold and insure seal match with door operations.

3.6 Contractor will vacuum at the completion of installation and before the end of the duty day and prior to inspection.

4. FACILITIES DAMAGE:

4.1 The Contractor shall be responsible for all damage to furniture, buildings, facilities, and grounds, caused by his/her work forces or equipment, and shall repair said damages to the satisfaction of the Contracting Officer at no expense to the Government.

5. SCHEDULE

5.1 The Contractor shall prepare a written schedule of work to be performed and shall submit it to the Contracting Officer with their quote. Completion of work will be within six months of contract award date.

6. WORKING HOURS

6.1 Working hours for the Contractor shall normally be between 07:30 am and 04:30 pm, Monday through Friday, excluding Federal holidays. If the Contractor desires to work during periods other than the above, they must identify by letter to the Contracting Officer at least five working days in advance of the dates desired and identify the work that will be accomplished if approval is given. The Contractor shall not be reimbursed for any changes or work accomplished outside the scope of the contract without prior approval by the Contracting Officer. In addition to the above, close coordination with the Government must be maintained.

7. FINAL INSPECTION

7.1 The Contractor shall notify 99 Contracting Squadron and facility manager of 26 WPS for the final inspection and certification. Final clean up shall be made prior to any inspection.

All project documentation is required within 30 days of project acceptance, unless noted otherwise in the statement of work.

SECTION II

GENERAL INFORMATION

1. CONTRACTOR PERSONNEL REQUIREMENTS

1.1 The contractor shall provide the name of the responsible person who has full authority to act for the contractor on all matters relating to the performance of this contract. The name of this person or alternate(s) who shall act for the contractor when the responsible person is absent shall be designated in writing to the contracting office. The responsible person or alternate shall be available to discuss problem areas within 1 hour during normal duty hours and within 2 hours after normal duty hours. Normal duty hours for Nellis AFB are 07:30 am to 04:30 pm, Monday through Friday excluding Federal Holidays.

2. UNIFORM AND APPEARANCE

2.1 Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. While on duty, all employees shall wear a company unique uniform of the style and color normally used by industry. The uniform shall be always clean and neat in appearance.

3. SAFETY

3.1 There are no identified hazards on the designated property. Government shall provide an asbestos and lead base clearance letter for the area.

STATEMENT OF WORK
2. LOCATION
3. DESCRIPTION OF WORK
4. FACILITIES DAMAGE:
5. SCHEDULE
6. WORKING HOURS
7. FINAL INSPECTION