Attachment 1 - Salient Characteristics 22 ATKS UPS BATTERY REPLACEMENT.pdf

PDF 80 KB Posted

Attached to
22d ATKS Bldg 1057 UPS Battery Replacement
Solicitation number
F3G1DF6166AQ01
Issued by

About this file

This is a Statement of Work (SOW) for UPS battery replacement services required by the 22d Attack Squadron at Creech Air Force Base in Nevada. The contractor shall purchase and install 240 new C&D UPS12-495PLP batteries to replace existing Uninterrupted Power Supply batteries in building 1057. The scope of work includes furnishing all required components, accessories, necessary tools, shop supplies, user documentation, and labor for installation. The contractor is responsible for connecting and functionally testing the overall system after battery installation to ensure proper operation.

Work access will be provided by 22d Attack Squadron members Monday through Friday, 0800-1600 hours, excluding federal holidays. All materials, tools, and labor required for the battery replacement project will be provided by the contracted company and workers. The document does not specify contract award dates, pricing terms, set-asides, or contract vehicle types, as this appears to be a preliminary scope definition rather than a complete solicitation document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

22 ATKS UPS BATTERY REPLACEMENT

Background:

The 22d Attack Squadron requires the purchase and replacement of 240 Uninterrupted Power Supply (UPS) batteries with 240 new “C&D UPS12-495PLP” batteries, with new connect, and factionally tested (all batteries, necessary tools, shop supplies, and labor will be provided by the contracted company/workers). Connect and test function of overall system after installation of batteries in building 1057, Creech AFB, NV. Members of the 22 ATKS will provide and facilitate full accesses to necessary work areas M-F, 0800-1600 (not including federal holidays).

Scope:

The contractor shall furnish and install all required components, accessories, and user documentation in accordance with the specifications below:

• UPS Batteries - C&D UPS12-495PLP

File details come from the government source that posted it. Updated .