Attachment_1_Statement_of_Work.docx

DOCX document 48 KB Posted

Attached to
B2000 L11, L12 Bathroom Renovation
Solicitation number
F2MTLG6061AW01_Bathroom_Renovation
Issued by

View the file

Other files

File Type Posted
Sign_In_Sheet.PDF PDF
Building_2000_Question_Answered.docx DOCX document
A-103_Revised_12_Sep_16.pdf PDF
Directions_to_Bldg_2000.pdf PDF
Wage_Determinatio.docx DOCX document
FA3016-16-R-0093-0001_(01).pdf PDF
Attachment_6_As_Builts.pdf PDF
FA3016-16-R-0093.pdf PDF
Attachment_9_Local_Requirements.docx DOCX document
Attachment_2_Div_01 _08 _09 _10 _21 _22 23 _26.pdf PDF
Attachment_7_-_Wage_Determination_TX160280.docx DOCX document
Attachment_8_Administrative_Authority.docx DOCX document
Attachment_5_Asbestos_Survey.pdf PDF
Attachment_4_Drawing.pdf PDF
Attachment_3_Submittal_Register_2.pdf PDF
Presolicitation_Notice.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

KELL150019

RENOVATE RESTROOM L11, L12 B2000

JOINT BASE SAN ANTONIO – LACKLAND AFB (KELLY ANNEX)

SAN ANTONIO, TEXAS

Date 02 July 2015

FA3016-16-R-0093 ATTACHMENT 2

THIS PAGE IS LEFT INTENTIONALLY BLANK

STATEMENT OF WORK

1. PROJECT NUMBER: KELL150019-44067

2. TITLE: RENV/Renovate Restroom L11 and L12 Building 2000

3. PROJECT LOCATION: Lackland AFB (Kelly Annex)

4. GENERAL DESCRIPTION OF WORK

The scope of this project is to expand the existing restrooms to create the square footage required to meet current federal accessibility standards.

Features of work include the demolition of the existing restrooms, janitor's closet and office 101 to create ADA compliant restrooms. Work elements include at a minimum but not limited to, architectural, electrical and mechanical. The room and door finishes shall match existing colors and patterns to keep with the historic theme of the original building design.

4.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

DoD Unified Facilities Criteria (UFC)

UFC 3-600-01 (26 September 2006) FIRE PROTECTION ENGINEERING FOR FACILITIES Change 3, 1 March 2013

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008; Errata 2011) Safety and Health Requirements Manual

5. APPLICABLE DETAILED SPECIFICATIONS: DIVISION 1 THROUGH 32 DIVISION 01 GENERAL REQUIREMENTS

01
35
13.20
00
SPECIAL PROJECT PROCEDURES- CAD
01
35
26

GOVERNMENTAL SAFETY REQUIREMENTS

01
35
35

ENVIRONMENTAL PROTECTION

01
42
00

SOURCES FOR REFERENCE PUBLICATIONS

01
45
00.00
20
CONTRACTOR QUALITY CONTROL
01
50
00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01
72
00.00
44
ALTERATIONS TO EXISTING FACILITIES
01
77
00.00
20
CONTRACT CLOSEOUT
01
78
00

CLOSEOUT SUBMITTALS

01
78
23

OPERATION AND MAINTENANCE DATA

01
78
36.00

WARRANTY OF CONSTRUCTION

of

DIVISION 08 OPENINGS

08 11 13STEEL FRAMES
08 14 00WOOD DOORS
8 71 00DOOR HARDWARE

DIVISION 09 FINISHES

9 22 00SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00GYPSUM BOARD
09 30 13CERAMIC TILING
9 90 00PAINTS AND COATINGS

DIVISION 10 SPECIALTIES

10 21 13TOILET COMPARTMENTS DIVISION 22PLUMBING
22 00 00PLUMBING, GENERAL PURPOSE

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING

23 31 13.00 40METAL DUCTS
23 37 13.00 40DIFFUSERS, REGISTERS, AND GRILLS DIVISION 26ELECTRICAL
26 05 00.00 40COMMON WORK RESULTS FOR ELECTRICAL
26 51 00INTERIOR LIGHTING

6. PERFORMANCE SPECIFICATIONS/DETAILED SCOPE OF WORK:

6.1 Work Plan

Develop a work plan indicating means and methods of the restroom renovation. Plan shall include, at minimum, a narrative describing the work to be performed and supporting documentation to include final construction plans and shop drawings showing plumbing/riser diagrams, electrical one line drawings that show new named circuits and circuits removed and mechanical plans showing connection details.

Work plan shall identify requirements for safety devices, dumpster location(s), and protection of stored material from exposure to weather, protection of property and personnel, building access routes and circulation patterns, contractor use of the premises, parking, security procedures, equipment, materials storage and waste disposal.

6.2 Submittals

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33

00 SUBMITTAL PROCEDURES:

SD-01 DATA

Work Plan; G Construction Plans mechanical shop drawings; G electrical shop drawings; G waste/supply piping schematic shop drawings; G

6.3 DEMOLITION

Contractor shall use means and methods to minimize excessive dust and noise. If excessive noise during demolition/construction is unavoidable contractor shall notify the contracting officer or designated government representative within a minimum of 7 (seven) working days in advance to allow for coordination with building manager.

6.3.1 Architectural/Interior See attachment 11.

6.3.2 Structural See attachment 11.

6.3.3 Mechanical

Demo existing exhaust and HVAC duct work to extent required to allow for installation of new work.

6.3.4 Electrical

Prior to start of electrical demo contractor shall trace circuits of the electrical panel in room 101.

6.3.4.1 Fluorescent Lights

Demo existing surface mounted fluorescent and recessed lighting.

6.3.4.2 Switches/Outlets

Demo existing electrical outlets, switches and communication circuits in rooms L11, L12 and room 101.

6.3.5 Plumbing

Demo existing plumbing to include cut-off valves and drains, up to rough-in plumbing.

6.3.6 Environmental

See attached hazardous material surveys dated 17 July 2015 and 1 February 2016.

6.3.7 Fire

Contractor shall follow UFC 3-600-01 26 September 2006 (change 3, 1 March 2013) when work on existing fire protection devices is required as part of this project. UFC can be obtained at http://www.wbdg.org/ccb/DOD/UFC/ufc_3_600_01.pdf

6.3.8 Existing Devices

Existing devices shall remain in place during renovation work. Contractor shall protect devices to prevent damage.

6.4 NEW WORK

Contractor shall supply labor and new materials unless otherwise specified to provide a complete and usable system. Colors, finishes and tile patterns shall match existing. A cover up inspection shall be scheduled by the contractor with the COR prior to installation of flooring, wall and ceiling panels.

6.4.1 Architectural See attachment 11.

6.4.2 Structural See attachment 11.

6.4.3 Mechanical

Install over the door transfer grills at restroom entrances. Contractor shall submit mechanical shop drawings that show the detail of the transfer grill and connecting duct work.

6.4.4 Electrical

6.4.4.1 New Circuits

Use existing conduits for new electrical conductors and components to the extent possible. Contractor shall submit electrical shop drawings that show new one line wiring diagram. See attached drawings for new work.

6.4.4.2 Switches/Outlets

Provide one light switch in each restroom and one GFCI protected convenience outlet.

6.4.5 Plumbing

Where necessary cap abandoned waste piping connection points. Contractor shall submit waste/supply piping schematic shop drawings that show new pipe location and connection details. See attached drawings for new work.

7. PERFORMANCE PERIOD

Project schedule shall be submitted IAW section 01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES.

8. SCHEDULING REQUIREMENTS AND HOURS OF OPERATION/DAILY WORK HOURS

The only scheduling of work outside of normal working hours that may be required for this project is during features of work that produce excessive noise, vibration and /or dust. During these types of activities contractor shall coordinate with the designated government representative and building user. Normal work hours are 0730-1700 Monday-Friday, weekend and after hours work shall only be performed by prior approval from contracting officer. The facility will be occupied during this construction period.

Facility is a secure bldg and escorts will be required at all times for contractor/sub-contractor employees. Escorts will be provided by the building user.

9. GOVERNMENT FURNISHED ITEMS None.

10. NOTED CONTRACTOR REQUIREMENTS

10.1 After Award

10.1.1 Shop Drawings

Contractor shall provide construction drawings 30 days after issuance of NTP.

10.1.2 Contractor Quality Control Reports

Contractor shall submit daily (or more often, as applicable) Contractor Quality Control Report (CQC) IAW section 01 45 00.00 20 CONTRACTOR QUALITY CONTROL.

10.1.3 Construction Plans

Contractor shall provide construction plans 30 days after award.

10.1.4 Lay Down Area

Contractor shall coordinate with government representative to determine the location for the project lay down/storage area.

10.2 Debris and Cleanup

Upon completion of the workday, the contractor shall leave the work area in a clean manner. All project generated debris and waste shall be removed from the sire and disposed of at an appropriate location off post.

10.3 Toilet Facilities

Are not available, contractor shall provide a chemical toilet or other facility for crew personnel assigned to the roof repair project.

10.4 As Built Record Drawings

As Built CADD documents IAW section 01 35 13.20 00 SPECIAL PROJECT PROCEDURES-CAD

11. ATTACHMENTS

This scope of work includes the following attachments.

ATTACHMENT 2Div 01, 08, 09, 10, 21, 22, 23, 26
ATTACHMENT 3Submittal Register
ATTACHMENT 4Conceptual Design Drawings
ATTACHMENT 5Asbestos Survey
ATTACHMENT 6As Built
ATTACHMENT 7Wage Determination
ATTACHMENT 8Administrative Authority
ATTACHMENT 9Local Requirements

-- End of Section --image1.jpeg