A-103_Revised_12_Sep_16.pdf
PDF 274 KB Posted
- Attached to
- B2000 L11, L12 Bathroom Renovation
- Solicitation number
- F2MTLG6061AW01_Bathroom_Renovation
About this file
Revised A-103. Automatic door opener for men's bathroom will not be removed it will be reinstalled.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign_In_Sheet.PDF | ||
| Building_2000_Question_Answered.docx | DOCX document | |
| Directions_to_Bldg_2000.pdf | ||
| Wage_Determinatio.docx | DOCX document | |
| FA3016-16-R-0093-0001_(01).pdf | ||
| Attachment_1_Statement_of_Work.docx | DOCX document | |
| Attachment_6_As_Builts.pdf | ||
| FA3016-16-R-0093.pdf | ||
| Attachment_9_Local_Requirements.docx | DOCX document | |
| Attachment_2_Div_01 _08 _09 _10 _21 _22 23 _26.pdf | ||
| Attachment_7_-_Wage_Determination_TX160280.docx | DOCX document | |
| Attachment_8_Administrative_Authority.docx | DOCX document | |
| Attachment_5_Asbestos_Survey.pdf | ||
| Attachment_4_Drawing.pdf | ||
| Attachment_3_Submittal_Register_2.pdf | ||
| Presolicitation_Notice.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-101
A R
C H
I T
E C
T U
R A
L
D E
M O
E
X I S
T I N
G N
W
F
L O
R
P
A
N
G B
C H
E C
K E
D
B
Y
G B
R E
N O
V A
T
S
T R
O O
M
L
A
N D
B
L D
J B
S A
A C
K L
A N
D
A
F B
K
E L
Y
N
E X
D E
M O d w g
R G
H
D
2 3 4 5
C
B
A
D a t e
A P
P R
O V
E D
A S
B
U I L
T
A p p r o v a l
D a t e
D e s c r i p t i o n
R e v
Reference Number:
Sheet of
F I L
E
N
A M
E
D W
N
B
Y
D E
S I G
N E
D
B
Y
R E
L E
A S
D
B
Y
C K
D
B
Y
W O
K
D
U M
B E
R
C O
N T
R A
C
U M
B E
R
D R
A W
I N
G
C
O D
E
D A
T E
PROJECT NUMBER
F S
N
D
C
B
A
1 2 3 4 5
X
II
X I
X IX
VIII
V
II
V I
V
IVIII
II
I
J O
I N
T
B
A S
E
S
T
O N
I O
S A
N
A
N T
O N
I O
T
X d
C
I V
I L
E
N G
I N
E E
R
S
Q
F O
S
M
H
U
S T
O N
BUILD STRONG
502D CIVIL ENGINEER S
Q
SCALE:
" = 1'-0"
0 2' 4' 12'8'
SCALE:
" = 1'-0"
A1
DEMO
KELL150019
DEMOLITION NOTES:
CONTRACTOR SHALL REMOVE
THE ITEMS 1-11 OFF LACKLAND
AFB (KELLY ANNEX) AND
DISPOSE OF OF ACCORDING TO
JBSA, LOCAL, CITY, STATE AND
FEDERAL REGULATIONS.
a. CERAMIC FLOOR TILE AND
CEMENTITIOUS SETTING
MATERIAL.
b. CERAMIC WALL TILE AND
SETTING MATERIAL.
c. TOILET PARTITIONS
d. URINALS
e. TOILETS
f. LAVATORIES AND COUNTER
TOP
g. DOOR AND METAL FRAMES
h. CMU WALL FROM FLOOR TO
CEILING WHERE HATCHED
MIRRORS AND SUPPORTS
i. MIRRORS AND SUPPORTS
j. ACOUSTICAL CEILING, SUPPORTING GRID AND BATT
INSULATION.
DEMO - KEYED NOTES:
1. DEMO VANITIES, MIRRORS
AND ASSOCIATED
HARDWARE.
2. DEMO PARTITIONS AND
URINAL SCREENS.
3. DEMO DOORS, FRAMES AND
ASSOCIATED HARDWARE
4. DEMO CARPET AND CERAMIC
FLOORING.
5. DEMO TOILETS AND URINALS.
6. DEMO RAILING FOR NEW
DOOR OPENING AS
REQUIRED.
7. AUTOMATIC DOOR
OPERATOR. REMOVE AND
REINSTALL
DEFINITIONS:
1. THE WORD "PROVIDE" OR
PROVIDED" WHEN REFERRING TO
CONSTRUCTION ELEMENTS OR
EQUIPMENT ON THE CONTRACT
DRAWINGS SHALL BE UNDERSTOOD
TO MEAN, CONTRACTOR SHALL
SUPPLY ITEM INDICATED AND
INSTALL ACCORDING TO
MANUFACTURES PRINTED
INSTRUCTIONS, CODE
REQUIREMENTS, STANDARD
INDUSTRY PRACTICES AND JOB
SPECIFICATIONS, TO BE COMPLETE
AND FULLY FUNCTIONAL FOR ITS
INTENDED PURPOSE, WITH NO
ANCILLARY CONSTRUCTION OR
OTHER WORK REQUIRED TO BE
PERFORMED BY THE GOVERNMENT.
2. JC = JANITORS CLOSET
SCALE:
" = 1'-0"
A2
NEW
NEW - KEYED NOTES:
CONTRACTOR SHALL PROVIDE THE FOLLOWING.
1. ADA COMPLIANT WATER CLOSET.
2. STRUCTURAL SUPPORT SHALL BE PROVIDED
FOR ALL GRAB BARS USE HEAVY DUTY TYPE
GRAB BARS.
3. NEW RAILING AS REQUIRED.IN HALLWAY.
FINISHES SHALL MATCH EXISTING STYLE AND
MATERIALS.
4. FLOOR MOUNTED MOP SINK.
5. ADA COMPLIANT VANITY, SINK AND FIXTURES.
6. RE-INSTALLED AUTOMATIC DOOR OPENER
NEW WORK - NOTES:
a. FINISHES SHALL MATCH EXISTING COLORS
AND PATTERNS.
b. CONTRACTOR SHALL SUBMIT COLOR AND
MATERIAL SAMPLES FOR SELECTION BY
BUILDING USER.
c. CONTRACTOR SHALL COORDINATE WITH BLDG
USER TO VERIFY THAT NEW RESTROOM
ACCESSORIES AND BE ACCESSED AND
MAINTAINED BY BUILDING JANITORIAL STAFF.
d. THE CONTRACTOR SHALL COORDINATE ALL
PHASE OF WORK TO INCLUDE ESCORT
SCHEDULING, MATERIAL DELIVERIES AND
UTILITY OUTAGES.
RM 101
RM 101
AutoCAD SHX Text L12
AutoCAD SHX Text L11
AutoCAD SHX Text
JC
AutoCAD SHX Text L12
AutoCAD SHX Text L11
AutoCAD SHX Text
JC
GREGORY.W.BELNAP
Polygon
GREGORY.W.BELNAP
Polygon
| Sheets and Views |
| A-101 DEMO EXISTING-NEW FLOOR PLAN |
File details come from the government source that posted it. Updated .