Sources Sought Notice - Chiller Repair.docx

DOCX document 65 KB Posted

Attached to
Sources Sought Notice - Chiller Repair
Solicitation number
F2M3CB5071A001
Issued by

About this file

This is a Sources Sought Notice for chiller repair services issued by the Department of the Air Force 502D Air Base Wing at Joint Base San Antonio. The document seeks market research to identify contractors capable of repairing Chiller #2 (McQuay Model #AWS170BDSE) located in Building 6330 at JBSA-Lackland, Texas. Specific repair requirements include replacing multiple components such as EXV controller, condenser pressure transducer, fan contactors, VFD faces, rewiring condenser fans, and replacing the cabinet exhaust fan, with comprehensive electronic and mechanical testing.

The sources sought notice requests voluntary responses from potential contractors by 10 April 2025 at 12:00pm CST, with contractors asked to provide information about their business status (small business, socio-economic classification), previous military customer experience, pricing details, and lead times. The procurement is classified under NAICS code 238220, and contractors are invited to submit their information via email to jamie.cutright@us.af.mil. This market research document is not a formal solicitation but aims to gather preliminary information about potential service providers for the chiller repair project.

View the file

Other files

File Type Posted
SOW B6330 CHILLER 2 - DRAFT (2).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

502D AIR BASE WING

JOINT BASE SAN ANTONIO

3 April 2025

TO:502D Contracting Squadron
1655 Selfridge Ave.
JBSA – Lackland AFB, TX 78236
FROM:Company Name_________________________________
Address_______________________________________
Address _______________________________________
Phone No. _____________________________________
Email Address__________________________________
Cage Code ____________________________________

SUBJECT: JBSA Chiller Repair

NAICS: 238220

PSC: J041

1. The Government is only conducting market research and attaining information to identify contractors that are able to provide all items listed below and the cost associated to acquire these specific items/services. All information provided is STRICTLY VOLUNTARY.

2. Is your company a small business? ______________(Yes/ No)

3. If Small Business, please identify company’s socio-economic concern(s):______________________ (HUBZone, service-disable veteran-owned small bus., women-owned small bus., etc…)

4. Have you previously supplied the item to military customers? ________(Yes/No)

5. Is the NAICS listed above, the most appropriate NAICS?_____ (Yes/No). If not, please suggest a better NAICS that fits this type of work __________.

6. If you do not manufacture/produce the items, do you obtain them from a small business in the USA? ______________(Yes/ No)

7. Please take the opportunity to provide cost input for the products listed below (voluntarily).

Services
Unit
QTY.
Unit Price
Extended Amount

Contractor shall repair any items for testing the operation of chiller #2 mechanically and electronically at Building 6330, JBSA-LAK Texas

McQuay Model # AWS170BDSE

Installation – Chiller #2 Parts

1. Replace EXV controller with a new, factory supplied one

2. Replace Circuit 2 condenser pressure transducer and cable with new, factory supplied ones

3. Replace 3 condenser fan contactors with new, factory supplied ones

4. Replace 2 VFD faces with new, factory supplied ones

5. Rewire 10 condenser fans with new wiring

6. Replace cabinet exhaust fan with new, factory supplied one

Startup/Testing – Chiller #2

1. Contractor shall test equipment electronically and mechanically to ensure equipment is fully operational.

In accordance with Draft SOW

EA
1
$
$

8. Is the pricing offered GSA or Open Market?_____________________

9. The estimated completion date from award or estimated time to complete project (to include delivery of all equipment)? _____________________ (Days)

10. What is the estimated lead time for the items you are procuring? _____________________ (Days)

11. This request for information (RFI) is strictly voluntary and is not to be interpreted as a quote in anticipation of a future contract award.

12. Please respond via e-mail by 10 April 2025, 12:00pm CST. Email: jamie.cutright@us.af.mil. If you have any questions, please contact SrA Jamie Cutright via e-mail.

image1.png

File details come from the government source that posted it. Updated .