Attachment_1_-_Performance_Work_Statement.pdf
PDF 226 KB Posted
- Attached to
- Grease Traps and Lift Stations Federal contract opportunity
- Solicitation number
- F2F3235077AU01
About this file
1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Grease_Traps _Sewage_Lift_Stations_and_Holding_Tank_Maintenance_PWS.docx | DOCX document | |
| Questions_and_Answers__3.docx | DOCX document | |
| Questions_and_Answers_dated_6_May_2015.docx | DOCX document | |
| Attachment3-Offer_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_4_-_Local_Clauses.pdf | ||
| Attachment_5_-_Cover_Sheet.pdf | ||
| Attachment_2_-_DoL_Wage_Determination.pdf | ||
| Questions_and_Answers_dated_17_April_2015.docx | DOCX document | |
| Attachment_5_-_Cover_Sheet.url | URL file | |
| Attachment_1_-_Performance_Work_Statement.url | URL file | |
| Attachment3-Offer_Schedule(1).url | URL file | |
| Attachment_2_-_DoL_Wage_Determination.url | URL file | |
| Attachment_4_-_Local_Clauses.url | URL file |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation F2F3235077AU01 Attachment 1
Grease Traps, Sewage Lift Stations, and Holding Tanks Maintenance Services Hurlburt Field, Florida
DEPARTMENT OF THE AIR FORCE
AIR FORCE SPECIAL OPERATIONS COMMAND
st
SPECIAL OPERATIONS CIVIL ENGINEER SQUADRON
PERFORMANCE WORK STATEMENT
FOR
GREASE TRAPS, SEWAGE LIFT STATIONS &
HOLDING TANKS MAINTENANCE
HURLBURT FIELD, FLORIDA
23 February 2015
TABLE OF CONTENTS
SECTION NUMBER AND TITLE PAGE NUMBER
1.0 Description of Services 4
2.0 Service Summary 7
3.0 Government Furnished Property and Services 7
4.0 General Information 7
5.0 Appendices 12
Appendix A: SERVICE SCHEDULE GREASE TRAPS, LIFT STATIONS AND
HOLDING TANKS
Appendix B: PERMIT REQUIRED CONFINED SPACE SCHEDULE (PRCSS)
Appendix C: LIFT STATION PIPING FOR PLUGS (TEST BALLS)
PERFORMANCE WORK STATEMENT FOR
GREASE TRAPS AND SEWAGE LIFT STATIONS MAINTENANCE
1. DESCRIPTION OF SERVICES The contractor shall provide all management, tools, supplies, equipment, labor, and transportation necessary to perform maintenance services on grease traps, sewage lift stations, and holding tanks located at Hurlburt Field, Florida. Work shall include the removal of all liquid, grease, and solids from the grease traps and the removal of liquid, oil, fuel, solids, grease, sand and miscellaneous debris from the sewage lift stations and holding tanks at various locations in accordance with this Performance Work Statement. See
Appendix A for the service schedule of grease traps, lift stations, and holding tanks and the required frequency of service. The Government reserves the right to modify/change this schedule if service is not necessary for any of the facilities/locations listed. All work shall comply with Government and industry standards and practices, as well as applicable local, state, and federal regulations.
1.1 GOVERNING REGULATIONS, SPECIFICATIONS AND DESCRIPITION OF
WORK.
The following list of federal regulations pertaining to liquid wastes is not all-inclusive.
Resource Conservation and Recovery Act (as amended by the Hazardous and Solid
Waste amendments of 1984), subtitle C, “Hazardous Waste Management.”
Oil Pollution Act of 1990, Section 1001.
The Clean Water Act, Title 3, “Standards and Enforcement”, and Title 4, “Permits and
Licenses”.
Title 40 CFR 260-282, “Hazardous Waste”
Title 40 CFR Parts 104- 149 “Water Programs”.
Title 40 CFR Part 110, “Discharge of Oil”.
Title 40 CFR Part 112, “Oil Pollution Prevention”.
Title 40 CFR Part 401-471, “Effluent Guidelines and Standards”.
Title 40 CFR Subpart F, “Releases from Solid Waste Management Units”.
1.1.1. GREASE TRAPS. The contractor shall skim all grease from water surface of trap and remove waste build up on trap walls and all associated equipment within the first foot of the water line in the pit. Any buildup of grease at the water line shall be removed. Remaining residuals shall be pumped out. All inlet/outlet pipes shall be free of obstructions to ensure unrestricted flow. All collected waste products shall be handled in accordance with local, state and federal health requirements and disposed of at an approved off-base collection facility.
During grease trap cleaning, if the contractor’s truck becomes full prior to the dewatering process being completed, contractor is permitted to dewater directly back into the grease trap after a fifteen (15) minute waiting period. All grease traps shall be pumped completely out, the contents hauled off and disposed of at an approved off-base collection facility.
1.1.1.1. All grease traps listed in Appendix A shall be pumped and cleaned in accordance with this PWS or as requested to maintain proper operation. If the grease trap has to be pumped out more than required due to excessive build up, the contractor shall pump out the trap at no additional cost to the government. At no time shall the contents of the grease trap be recycled and dumped back into the grease trap.
1.1.2. SEWAGE LIFT STATIONS. The services performed on the lift stations shall either be general or confined space entry. General services does not require the contractor to physically enter the wet well, however the contractor shall be responsible for pumping out all liquid, oil, fuel, solids, grease, sand and miscellaneous debris from within the wet well, in addition to the removal of waste build up on the wet well walls.
1.1.2.1. A confined space entry shall require the contractor to enter the wet well and plug the incoming sewer line(s) (See Appendix C), while the lift station is being serviced. This procedure may be omitted if the Contractor is able to provide the same results as plugging the wet well, as well as, ensuring the safety and well-being of entrant personnel. In addition, a confined space entry shall require the contractor to remove any debris accumulated on float wires, motor lead wires, and all associated equipment. The contractor shall provide on-site rescue and emergency services for permit-required confined spaces (PRCS’s) when performing operations at these locations (See Appendix B). All collected waste products shall be handled in accordance with local, state and federal health requirements and disposed of at an approved off-base collection facility.
1.1.2.2. Lift stations shall be pressure washed with water or cleaned manually to remove any build up grease, grit, etc. and pumped out to remove remaining residuals. The inlet pipes shall be cleared to ensure un-restricted flow. The contractor shall be required to remove sand and/or sludge from the bottom of the lift station pit. Any residual water may be left in the pit. The contractor is permitted to de-water excess uncontaminated fluids into the base sanitary sewage system under the supervision of an Authorized Government Representative (AGR).
1.1.3. HOLDING TANKS
1.1.3.1. There are two containers classified as “holding tanks” for this requirement. Two holding tanks shall be pumped out and free of all liquid, oil, fuel, solids, grease, sand, and miscellaneous debris. One of the structures is an equalization basin (approximately 55’ x 50’) with an adjacent channel (approximately 3’ x 10’). The basin and channel shall be dewatered and any remaining grit and residual influent shall be removed by the contractor.
1.1.4. The contractor shall provide a telephone number where they can be contacted between
0700 and 1530 (7:00 A.M and 3:30 P.M), Monday through Friday, in addition to an emergency number to be used during evenings, weekends, and holidays.
1.1.5. EMERGENCY SERVICE CALLS. Unexpected services, services outside of the
Service Schedule in Appendix A, may be required in the event of natural disasters, unscheduled repairs to piping, or other infrastructure involving grease traps and lift stations. In the event that emergency servicing is required, the contractor shall be on-site within four (4) hours after notification to begin the required service.
1.2. EQUIPMENT. All equipment used in performance of this contract shall be specifically designed to be used in the emptying and cleaning of grease traps, lift stations, and holding tanks.
No improvised or makeshift equipment will be permitted in performing this contract. Based on the Service Schedule in Appendix A, sufficient vehicles shall be used to satisfy this requirement.
Access to some work sites is limited, therefore the contractor should plan accordingly as to the number and size of vehicles to be used. Each vehicle shall be equipped with at least 180 feet of suction hose. The contractor shall provide all pressure washing equipment necessary to meet the requirements of this PWS. Each vehicle shall be equipped with spill or leak mitigation materials such as absorbent pads so the Contractor can clean any leakage resulting from minor spills. Plugs
(test balls) of various sizes (See Appendix C), meeting or exceeding 13 psi maximum back pressure rating shall be utilized to complete the work. Trucks/vacuum equipment deemed by the
AGR not to be in accordance with industry standards and practices, manufacturer’s instructions or failing to operate within factory tolerances (accurate vacuum pressure, serviceable seals/no leakage from vehicle) for that specific equipment, shall be removed from the installation and the remainder of the work shall be rescheduled at no additional cost to the government.
1.3. AREA CLEANLINESS. The contractor shall maintain the work area in a neat and orderly manner. The contractor shall clean up any spillage or other debris generated by service operations. The contractor is responsible for oils, fuels, and other liquids leaking from their vehicles. The contractor shall repair pavements and driving surfaces damaged due to negligence during maintenance operations at his/her own expense.
1.4. DISPOSAL. Disposal of collected materials from grease traps, sewage lift stations, and holding tanks shall be as follows: Solids (grease, sand, and miscellaneous debris) and contaminated liquid wastes pumped from grease traps and sewage lift stations shall become the property of the contractor and shall be removed from Hurlburt Field. The contractor may de-water excess uncontaminated fluids into the base sanitary sewage system only under the direct supervision of the AGR. The disposal of this collected material shall be accomplished in accordance with all local, state, and federal regulations.
1.5. SPILLS. If the Contractor causes or discovers an oil, fuel, hazardous or non-hazardous spill, it shall be reported immediately to the Hurlburt Field 1 st SOCES Environmental Flight, whether caused by the contractor or not. If the spill results from the Contractor’s operations, the contractor shall immediately contain and clean up the spill. Any spillage beyond the contractor’s ability to contain or clean-up, which requires the U.S Air Force to accomplish or assist in clean-up action, may result in the contractor being charged for expenses incurred. The contractor shall make every effort to prevent contamination of surface water. Precautions must be taken to prevent a release of fuel, oil, lift station and grease trap contents and other hazardous materials at the job site. In the event of an accidental spill, the first person to notice the release shall immediately notify the base fire department by dialing 911, regardless of quantity spilled.
1.5.1. REPORTING. The contractor shall immediately notify the Hurlburt Field 1 SOCES
Environmental Flight. The contractor should be prepared to give the following information:
1. His/her name.
2. Location of spill.
3. Number of injured persons and nature of injuries (if applicable)
4. Substance spilled.
5. Source of spill.
6. Approximate quantity of spill and rate material is currently spilling. Extent spill has traveled.
7. Waters which may be affected.
8. Cause and time of spill.
9. Any action underway to confine or clean up the spill.
1.6 ACCEPTANCE OF SERVICES. The AGR will accompany the contractor during performance of these services. The AGR will facilitate access, government oversight, and acceptance of contractor services. If a deficiency is identified, such as excessive debris or grease, the contractor shall immediately correct the deficiency at no cost to the Government.
The AGR will re-inspect and accept the services completed to the standards within this PWS.
2. SERVICES SUMMARY
2.1 Service Summary (SS). The service requirements are summarized into performance outcomes that relate directly to mission essential items. The performance thresholds describe the minimum acceptable levels of service required for each requirement. The thresholds are critical to mission success and acceptable (satisfactory) performance.
SERVICE SUMMARY (SS)
SS
Performance Objective
PWS
Paragraph to include all sub-paragraphs
Performance Threshold to Receive
Satisfactory Rating
Grease Traps.
1.1.1. and
Appendix A
98% of all grease and sediments removed per occurrence as listed in
Appendix A.
Sewage Lift Stations.
1.1.2. and
95% of all sand, grit, grease and debris removed per occurrence as listed in Appendix A.
Holding Tanks.
1.1.3. and
95% of all contents removed per occurrence as listed in Appendix A.
Disposal.
1.4
100% - Disposal completed IAW all local, state and federal regulations per occurrence as listed in Appendix A.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government will provide electricity and water, if available, for performance of services by the contractor for the duration period of this contract. Use of these utilities shall be approved and monitored by government personnel and shall be conserved by the contractor.
4. GENERAL INFORMATION.
4.1. CONTRACTOR PERSONNEL.
4.1.1. CONTRACT MANAGER. The contractor shall provide a contract manager who shall be responsible for the performance of the work to ensure it meets the requirements of this contract.
The name of this person and an alternate or alternates, who shall act for the contractor when the manager is absent, shall be designated in writing to the Contracting Officer within fifteen (15) days of contract award. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available during normal duty hours within one (1) hour to meet on the installation with government personnel to discuss contract issues. After normal duty hours, the manager or alternate shall return a call/message from Hurlburt Field within two (2) hours of receiving it. The contractor shall be onsite and commence work within four (4) hours after notification of service required.
4.1.2. CONTRACTOR EMPLOYEES. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
4.1.2.1. All contract employees shall be properly trained and certified to perform the required tasks.
4.1.2.2. Contractor employees shall present a neat appearance and be easily recognized as contractor employees.
4.1.3. CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL
CLEARANCES, AND VEHICLE PASSES. The contractor shall obtain base identification and vehicle passes, if required, for all Contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor employees are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.
4.1.3.1. The contractor shall complete and submit the following form to 1 SOCONS within fifteen (15) business days of contract award in order for employees to gain access to the installation:
a. Contractor Employee Listing
4.1.4. THE CONTRACTOR EMPLOYEE LIST. This form shall list every employee requiring base access. Every time employees change, it shall be updated to reflect additions and/or deletions. Identify those individuals you wish to have escort authority by including the word “escort” or “E” next to their names. Limit the number of individuals designated as escorts to a reasonable number (i.e. one or two). For work locations use building numbers or areas (i.e.
Bldg. 90517, 90232 or 91007). Once completed, email the list to the Contracting Office representative in EXCEL format. The Contracting Officer will then prepare and attach a cover letter, and forward the Employee List to the Visitor Control Center.
4.1.4.1. Upon notification that your employee list has been forwarded to the Visitor Control
Center, the employee shall complete the DHS I-9 form and hand carried to the Visitor Control
Center. The form shall be signed by the employee and the employer or designated representative. If everything is in order, they will receive a contractor badge. If an employee will be driving on Hurlburt Field they are required to provide a valid driver’s license, vehicle registration, and proof of insurance. NOTE: The section of the Visitor Control Center administrating this function is closed after 1300 (1:00 p.m.), therefore, employees must arrive prior to this time in order for their documentation to be processed.
4.1.4.2. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
4.1.4.3. Upon completion or termination of the contract or expiration of the identification passes, the contractor shall ensure that all base identification passes issued to employees are returned to the issuing office.
4.2. SPECIAL QUALIFICATIONS. If required by local, state, or federal regulations, contractor personnel shall be certified in servicing of grease traps and lift stations.
4.3. SECURITY REQUIREMENTS. The installation access will be coordinated with the local
Installation Fire Chief and Security Forces Squadron. Contract personnel will not enter restricted areas without escort from authorized personnel. The contractor shall restrict personnel to only those areas required to performing work.
4.4. SAFETY AND HEALTH STANDARDS. The contractor shall initiate and maintain programs to comply with the provisions of the Occupational Safety and Health Standards Act concerning entry requirements in confined spaces and handling potential hazardous substances.
Each member of the rescue/emergency team shall be provided with, and trained in the proper use of, personal protective equipment and equipment necessary for making rescues from PRCS’s.
Additionally, all personnel shall possess personal protective/safety equipment.
4.5. SAFETY REQUIREMENTS. The contractor shall submit a comprehensive accident prevention plan with their proposal. This plan shall address the procedures and response methods to be utlized in response to spills, hazardous or non-hazardous, or in the event of an accidental release of fuel, oil, lift station and grease trap contents and/or other hazardous materials at the job site.
4.5.1. The contractor shall submit a safety plan at the time of proposal. This plan shall address all hazards and safety precautions associated with the performance of this contract. For example, the use of gloves, hardhats, and a confined space entry plan. In addition, this plan shall address other areas as applicable, such as: when there is a danger to the public or workers, warning signs must be placed near the hazardous areas. The contractor is responsible for ensuring that all company employees and any subcontractors associated with this contract comply with the company’s approved safety plan.
4.5.2. The work shall be accomplished without compromising the safety of personnel or property, and in accordance with the provisions of local, state, federal, and American Standard
Safety Codes, American Standard Association, Base Safety and Fire Prevention Regulations, Air
Force Regulations, OSHA, and other measures deemed applicable by the Base Ground Safety.
4.5.3. The contractor shall install, when necessary, barricades and/or warning signs to protect the public or workmen in areas where work is being performed. Barricades to keep public out of work areas shall be left in place until after they are no longer required for protection.
4.6. SMOKING, EATING AND DRINKING. The contractor shall permit smoking, eating and drinking only in designated areas.
4.7. DRIVING LICENSE/ON-BASE REQUIREMENTS. The Contractor and employees shall comply with base traffic regulations at all sites. The contractor shall ensure employees have a current and valid state/country driver’s license for the type of vehicle being driven before allowing the employee to operate a personal vehicle on Hurlburt Field, Florida.
4.8. WORK LOCATION, PHYSICAL SECURITY AND OPERATING SCHEDULE. All work will be located on Hurlburt Field Air Force Base, Florida, and the adjoining Government facilities (Family Camping Grounds). Contractor personnel shall report to the CE Compound
Utilities Section Bldg. 90053 before initiating service on the scheduled day of service. The
AGR will accompany the Contractor to each service location. The performance of services shall be accomplished on the 2 nd
Thursday and 4 th
Thursday of each month when services are required.
If the scheduled date falls on a federal holiday, base down day, or any unforeseen event such as natural disasters or national emergency, servicing shall be accomplished immediately on the next duty day. Any proposed changes to the schedule (i.e.: equipment failure, labor problems, etc.), shall be immediately conveyed to the AGR and within five (5) business days in writing, stating the cause of the delay. This schedule shall account for servicing of each item listed in the
Appendix A.
4.9. HOURS OF OPERATION. Normally, all work shall be performed during the hours 0700
– 1530 (7:00 AM to 3:30 PM), Monday through Friday unless different times are worked out between both parties. The contractor’s arrival time shall be no later than 0730 (7:30 AM) on the scheduled day of service.
4.9.1. The contractor shall perform service on the Main Lift Station (Bldg. 91109) quarterly during the hours of 1600 – 0700 IAW the schedule in Appendix A.
4.9.2. FEDERAL HOLIDAYS.
New Year’s Day – 1 January
Martin Luther King Day – 3 rd
Monday in January
Washington’s Birthday- 3 rd
Monday in February
Memorial Day- Last Monday in May
Independence Day – 4 July
Labor Day- 1 st Monday in September
Columbus Day- 2 nd
Monday in October
Veteran’s Day- 11 November
Thanksgiving Day- 4 th
Thursday in November
Christmas Day- 25 December
4.10. RECORDS. The contractor shall deliver to the AGR service tickets for all work performed at the completion of each day’s services. ALL SERVICE TICKETS WILL
INDICATE TYPE OF MATERIAL REMOVED, LOCATION, AND SITE OF DISPOSAL. In addition, the contractor shall furnish the AGR with a list of observed defects on grease traps, sewage lift stations, and holding tanks that require repair or maintenance. Negative replies, such as ‘No Defects Identified’, are also required. This “Observed Defects Report” shall be turned in within five (5) business days after each scheduled date of service.
4.10.1 CONTRACTOR PAYMENT. The contractor shall submit billing invoices on a monthly basis.
4.11. MANPOWER REPORTING.
4.11.1. Reporting Full-Time-Equivalent (FTE) Data: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at the Contractor Manpower Reporting Application (CMRA) site http://www.ecmra.mil (select the US Air Force logo).
Reporting inputs will be for the labor executed during the period of performance for each
Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.
4.11.2. REPORTING PERIOD. The contractor is required to input data by 31 October of each year.
4.11.3. USES AND SAFEGUARDING OF INFORMATION. Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
4.11.4. USERS MANUALS. User manuals are available on the front page of the CMRA link at http://www.ecmra.mil.
4.12 DELIVERABLES.
Deliverables PWS Paragraph Frequency Deliver To
Contract Manager &
Alternate(s) Names 4.1.1.
Within fifteen (15) business days of contract award & if there is a change in staffing
Contracting Officer
Contractor Employee
Listing 4.1.3.1.
Within fifteen (15) business days of contract award & every time employees change
Contracting Officer
Accident Prevention
Plan 4.5
Submitted at time of proposal. * Contracting Officer
Safety Plan 4.5.1.
Submitted at time of proposal. * Contracting Officer
Schedule Changes 4.8
In writing, within five
(5) business days, stating the cause of the delay
AGR
Service Tickets 4.10 At the completion of each day’s services
AGR
Observed Defects
Report 4.10
Within five (5) business days after each scheduled service
AGR
Full-Time-Equivalent
(FTE) Data 4.11.1.
No later than 31
October of each calendar year http://www.ecmra.mil
*Awardee will retain the option to update plans after award. Revised plans shall be submitted to the Contracting Officer.
http://www.ecmra.mil/ http://www.ecmra.mil/
5.0 APPENDICES.
A. SERVICE SCHEDULE GREASE TRAPS, LIFT STATIONS, AND HOLDING
TANKS
B. PERMIT REQUIRED CONFINED SPACE SCHEDULE (PRCSS)
C. LIFT STATION PIPING FOR PLUGS (TEST BALLS)
END OF PERFORMANCE WORK STATEMENT
APPENDIX A
SERVICE SCHEDULE
GREASE TRAPS
CLIN BLDG LOCATION FREQUENCY
90326 Dining Hall (Diners Reef) 1 tank 1 manhole
Twice per
Month
90918 Soundside Club 1 Tank 2 Manholes
0001 1.2.1.1.1.1.1.1.1 91007 Dining Hall ( Dinners Rip Tide) 1 tank 2 manholes Monthly
90306 Child Development Center (west extension) 1 tank 2 manholes
Quarterly
(Oct, Jan, Apr, Jul)
91168 Child Development Center (East) 1 tank 2 manholes
90734 Fire Department (West side) 1 tank 2 manholes
90231 Bowling Center 1 tank 1 manhole
90353 Child Development Center 1 tank 1 manhole
91013 Commissary 1 tank 1 manhole
91350 Fire Station (East Side) 1 tank 2 manholes Semi- Annual
(Mar, Sep) 91007 Dining Hall (Diners Riptide) 3 tanks 6 manholes
LIFT STATIONS
CLIN BLDG LOCATION FREQUENCY
0002 91310 Golf Course Lawn Mower Shop
Twice per
Month
(As determined by the AGR)
91102, 92420 Red Horse Main, Housing Quarterly (Oct, Jan, Apr, Jul) 92424 Marina
90907 Soundside Semi-Annual
(Oct, April) 91013 Commissary
90376 TLF Semi-Annual
(Jan, July) 90027 Avionics
0002 91144 Red Horse Pump Pit
Semi-Annual
(Mar, Sep) 0002
91026 Weather
91304 Golf Course
90614 Hobby Shop
91500 AWWTP
92473 Marina 2 Annual
(September)
90752 Flightline Annual
(September)
90809 Engine Test Cell Annual
(November)
93260
Family Camping Grounds – This location is off of Martin Luther
King Drive just outside of the back gate. All base rules apply to this location as if it were on the main base.
Annual
(December)
90810 De-fueling Annual
(February)
90577 AFOTEC Annual (May)
91307 Radio Maintenance Annual (June)
90017 Bold Eagle Annual
(September)
90007 AGOS
Annual
(September)
91267 East Side Hangar Annual (March)
91350 East Side Fire Station Annual (March)
90401 EMS Control Annual (March)
MAIN LIFT STATION
0003 91109 Main Lift Station
Quarterly
(Required at night-Oct, Jan, Apr, Jul)
HOLDING TANKS
0004 90838 Hot Cargo Semi-Annual
(Oct, Apr)
0004 91550 WWTP Equalization Basin Annual
(December)
APPENDIX B
PERMIT REQUIRED CONFINED SPACE SCHEDULE (PRCSS)
Bldg. Number/ Name Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept
90017- Bold Eagle X
90027 Avionics X X
90007- AGOS X
90376-TLF X X
90401- EMS Control X
90614- Hobby Shop X X
90907- Soundside X X
91013- Commissary X X
91026- Weather X X
91109- Main Lift X X X X
91267- East side Hangar X
91304- Golf Course X X
91350- E. side Fire Station X
91500- AWWTP X X
91102- Red Horse Main X X X X
92420- Housing X X X X
92424- Marina X X X X
APPENDIX C
LIFT STATION PIPING FOR PLUGS (TEST BALLS)
BUILDING
LOCATION
SIZE OF PIPE(S) TO BE PLUGGED IN LIFT
STATION WET WELL*
91013 Commissary 8”
92420 Housing 12”
92424 Marina 10”
90376 TLF 1-6” & 1-8”
90614 Hobby 8”
91304 Golf Course 2-4”
90907 Soundside 2-8”
91102 Red Horse Main 1-8” & 1-12”
90027 Avionics 1-2” & 1-4” & 1-8”
90007 AGOS 2-8”
91026 Weather 1-8”
91500 AWWTP 2-8” & 1-6” & 1-4”
90017 Bold Eagle 2-8” & 1-10”
90401 EMS Control 1-4” & 1-10”
91267 East Side Hangar 2-4” & 1-10”
91350 East Side Fire Station 1-4” & 1-10”
91109 Main Lift Plug provided by USAF, installed by Contractor
* Plug sizes are estimated and shall be confirmed by contractor.
File details come from the government source that posted it. Updated .