F17SOL10027_am_4.pdf
PDF 460 KB Posted
- Solicitation number
- F17SOL10027
View the file
Other files
| File | Type | Posted |
|---|---|---|
| F17SOL10027__am_7.pdf | ||
| F17SOL10027_am_6_complete.pdf | ||
| F17SOL10027_am_5.pdf | ||
| F17SOL10027_am_3.pdf | ||
| F17SOL10027_am_2.pdf | ||
| RFIs_Log_Southside_Improvements.pdf | ||
| Amendment_1.pdf | ||
| F17SOL10027_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
F17SOL10027
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
OCON
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
1500102_150011005/12/2017000004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/12/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 4 integrates questions and answers distributed 6/21 and all documents referenced therein. The question deadline is extended to June 23, 2017.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Thomas Dempsey
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Smithsonian Institution
Office of Planning Design & Construction
PROJECT: 1500102 Renovate South Entrance
1500110 Baird AHU Replacement 1500102 / 1500110 NMNH Southside Improvements
RFI Response June 21, 2017
SOLICITATION: F17SOL100027
LAST UPDATED: 6/21/2017
SI RFI # Bidder RFI # Date Submt'd Company Project # QA# Request for Information SF Response
Resp. To Due
S001 1 5/15/2017 Facility Support
Services, LLC
1 Since the combined project magnitude for both is $18M-$24M, can relevant projects under $10M be considered as acceptable “Past Performance” examples?
SI's intent is to award a project in the $18 to $24 million dollar range. Past performance needs to be in that range to be acceptable. Two $10 million dollar projects will not be acceptable to demonstrate adequate past performance.
Brian Grove 5/19/2017
2 Will receipt of the multi-year funding increments cause any anticipated delays in the project?
SI will award funding based on projected cash flow to eliminate any work stoppage. Do not plan for any delays in construction due to multi-year funding.
Brian Grove 5/19/2017
3 Will projects that are not in the PPIRS system be acceptable? And if so, will offerors receive higher ratings for submitting past projects in the PPIRS system?
Projects not is PPIRS will be acceptable. No special rating or preference shall be applied for projects in PPIRS.
Brian Grove 5/19/2017
4 Will multiple task orders on the same project conducted simultaneously be considered acceptable as relevant total project cost?
Projects or task orders that were performed concurrently and proved to be physically related to each other shall be considered relevant for review.
Brian Grove 5/19/2017
5 Will the Baird AHU Replacement and NMBH Renovation projects be done simultaneously
All Base Contract work and Option work shall be performed within the specified project duration.
Brian Grove 5/19/2017
S002 1 6/2/2017 Forrester
Construction
1 The RFP states that all proposals will be submitted in pdf format through file sharing environments. Can you please provide detailed information on what those acceptable file sharing environments are and if there are any file size requirements.
Please use the sharing environment available to you. To confirm workability, please feel free to send us a link to a test file to confirm prior to the bid date. In the alternative, we can make a dropbox file available for you.
2 Please confirm that the Five (5) hard copies of the Technical and Cost Proposals can be hand-delivered on the day following the electronic transmission.
Confirmed
3 Please confirm that the Subcontracting Plan should be submitted with the Cost Proposal package.
Confirmed
4 According to SF1442, 13.b, an offer guarantee is not required. However, RFP Section I, page 28, requires a 20% bid guarantee. Please clarify.
No bid bond is required.
5 Please confirm that the Professional Liability Insurance coverage included in Section I, page 32 of the RFP, does not apply to the Contractor but rather the Designers of the project.
Confirmed
S003 2 6/5/2017 Forrester
Construction
1 The specifications of both South Entrance and the Baird Auditorium AHU Replacement call for the structural steel fabricator and the structural steel erector to be AISC-certified companies. As the amount of the new structural steel work is minimal, can the requirement be modified to companies that follow and abide by the AISC guidelines for steel fabrication and erection?
No, the structural steel fabricator and the structural steel erector shall be AISC-certified companies as defined in the specifications.
Sandra
Sierdzinska, Brian
Grove, Adam
Stewart
6/7/2017
S004 3 6/15/2017 Forrester
Construction
1 Please provide information on wage scale rates, if applicable. Use the current Davis bacon wage rate published by the Department of Labor for the District of Columbia, Building classification. Due to the changing nature of the labor rates, The Smithsonian Office of Contracting will update the contract wage decision a few days before the bids are due.
SI 6/15/2017 6/23/2017
2 Vol 2, S152: Please provide cut section through the retaining wall between the sloped concrete walls at ductbank. Does the retaining wall have a footing there? What is the light gray stripe to the north of CL B shown on 1/S557?
There is no footing below the retaining wall at the duct bank location. The light gray stripe was a sidewalk element. A revised sheet deleting this graphic will be included in ADD-002.
Abby Tourtellotte
QuinnEvans
6/15/2017 6/23/2017
3 Specification Section 055000-1.2 lists the banner hanging system, but does not include any further specification. Are there any manufacturers that can provide the system, or is it all custom?
The banner hanging system is a custom delegated design element. Additional performance requirements can be found on A 821.
Abby Tourtellotte
QuinnEvans
6/15/2017 6/23/2017
4 Specification Section 129300: What is the finish of the custom granite bench? The custom granite bench is to be thermal finish on exposed surfaces. The AE team will resubmit spec section 129300 as part of ADD-002.
Abby Tourtellotte
QuinnEvans
6/15/2017 6/23/2017
5 Specification Section 129300: We cannot find the bird bath on the plans. Please show, including any required foundations/attachment methods.
Bird Baths are included on drawings LP451 and LP452 with the designation Grn
Bath, which is an abbreviation for Granite Bird bath. The baths are to placed on compacted ground. No concrete footing or attachent is required.
Abby Tourtellotte
QuinnEvans
6/15/2017 6/23/2017
PROJECT: 1500102 Renovate South Entrance
1500110 Baird AHU Replacement 1500102 / 1500110 NMNH Southside Improvements
RFI Response June 21, 2017
SOLICITATION: F17SOL100027
LAST UPDATED: 6/21/2017
SI RFI # Bidder RFI # Date Submt'd Company Project # QA# Request for Information SF Response
Resp. To Due
6 Vol 1, AD202, Note 02-112 calls for removal and re-installation of the signs at the
Carriageway entrances. Note 10-43 on A213 calls for new signs. If new, please provide specification.
Carriageway entrance signs are new. Sign type A will be approximately 1'7" wide and 12" tall, typical of 2. Type A will have letters saying "CLEARANCE 10 FEET" with an arrow pointing down. Sign type B will be approximately 1'3" wide and 8" tall, typical of 2. Type B will have letters saying "CLEARANCE 7 FEET" with an arrow pointing right. Sign type C will be approximately 1'3" wide and 8" tall, typical of 2.
Type C will have letters saying "CLEARANCE 7 FEET" with an arrow pointing left. All signs will be metal similar to the current signage at the carriageway location.
Signage will be anchored at all four corners with stainless steel fasteners.
Contractor will be responsible for field verifying appropriate dimensions of signs.
Shop drawings and samples will be required. AE will provide applicable specification section and signage drawings as part of ADD-002.
Abby Tourtellotte
QuinnEvans
6/15/2017 6/23/2017
7 Note on drawing S111 and 7/S501 call for inspection of CMU knee walls under granite pavers and replacing with concrete knee walls, if necessary. How can this work be quantified at bidding stage? Would it be possible to provide a quantity for all to include?
The original knee walls below the stone paver joints are multiwythe brick masonry, not CMU as stated in this question. For bidding purposes, assume half of the existing masonry walls below the steps will need to be replaced with concrete. This is approximately 13 meters (43 feet).
Abby Tourtellotte
QuinnEvans
6/15/2017 6/23/2017
8 Vol 2 Specification Section 211316-3.4.C: Please designate on the plans which sprinkler heads are painted and need to be replaced.
This section is not referencing existing sprinkler system conditions. The intent of the specification section is to advise the contractor that any painted sprinkler shall be replaced at the contractor’s expense where any painting occurs and compromise’s a sprinkler of the new installation.
Abby Tourtellotte
QuinnEvans
6/15/2017 6/23/2017
9 Vol 2 Specification Section 265619: Please provide legible specification. The printed specification section, 265619, LED Exterior Lighting, seems legible as does the PDF. A legible copy is attached for reference. SI will resubmit section
265619 as part of ADD-002.
Abby Tourtellotte
QuinnEvans
6/15/2017 6/23/2017
10 Vol 2 Specification Section 280500-1.3: Please confirm par. 1.3 does not apply to this project.
For specification section 280500, Common Work Results for Electronic Security, paragraphs 1.3 A and 1.3 B are applicable. Paragraphs 1.3 C, 1.3 D, and 1.3 E are not applicable.
Abby Tourtellotte
QuinnEvans
6/15/2017 6/23/2017
11 Baird Auditorium Specification Section 230901-2.1 and Section 230923-2.3: It seems that Siemens is the only manufacturer that can be used and all other acceptable manufacturers listed on par.2.1 cannot be considered. Please confirm.
Siemens shall be the only manufacturer. Amanda Zellers
GWWO
6/15/2017 6/23/2017
S005 4 6/15/2017 Forrester
Construction
1 Section 050370 sub section 3.1-A, identifies a list of Historic Treatment Specialist Firms that may provide historic decorative metal refinishing. However the listed firms
Conservation Solutions, Inc. and Kreilick Conservation have declined to bid this project.
Please provide a list of other firms/contractors that have been previously approved by
COTR if any.
The Smithsonian will accept firms and staff that meet the qualifications identified in Specification Section 050370, 1.10A-D, Quality Assurance. Note this information should also be included in the Historic Treatment Program submittal required per
0135914, Historic Treatment Procedures, 1.5B, Quality Assurance.
Abby Tourtellotte
QuinnEvans
6/15/2017
2 Our subcontractors are urgently requesting more time for the review of the documents and the opportunity to submit questions. Please consider extending the RFI period for at least two more weeks, until June 29.
The date for submitting questions shall be extended to 6/23/17. SI - Eve
3 Please provide a list of pre-approved security contractors. There is no pre-approved list. Acceptable Security Subcontractors shall meet the requirements of Specification Section 280500, 1.1 , Quality Assurance.
SI and Abby
Tourtellotte
QuinnEvans
6/15/2017
4 Spec section 104400: Please confirm that fire extinguisher cabinets are not applicable to this project.
Section 104400 is not application to this project. Spec section 104400 will be removed as part of ADD-002.
Abby Tourtellotte
QuinnEvans
6/15/2017
PROJECT: 1500102 Renovate South Entrance
1500110 Baird AHU Replacement 1500102 / 1500110 NMNH Southside Improvements
RFI Response June 21, 2017
SOLICITATION: F17SOL100027
LAST UPDATED: 6/21/2017
SI RFI # Bidder RFI # Date Submt'd Company Project # QA# Request for Information SF Response
Resp. To Due
5 Spec section 129300 provides dimensions for the granite Bird Bath as 24”x24”x18”high.
The listed manufacturer does not provide in these dimensions. Please provide desired dimensions and quantity, as this is not shown on the plans.
Bird bath dimensions are nominal dimensions for the extents of the form of the bath. These are the desired dimensions and the two required are shown on LP451 and LP452 as “GRN BATH.” The intent is for this to be a solid (heavy) stone one piece bath.
Abby Tourtellotte
QuinnEvans
6/15/2017