SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
SMITHSONIAN INSTITUTION
P.O. BOX 37012
MRC 1200
Washington DC 20013-7012
OCON
Eve Errickson
Smithsonian Institution 600 Maryland Avenue SW, Suite 5001 Washington, DC 20024
Eve Errickson 202-633-5214
1454504
09/29/2016
F16SOL10063
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
RFQ Concept Drawings. Attached please find project documents titled 'Dulles Collections Center Storage Module,' as follows:
a. C 110 SP
b. C 105 UP
c. G-101 SP
d. G-102 SP
e. G-103 SP
f. AD 101 FP
g. AD 102 EL
h. A-101 FP
i. A-102 FP
j. A-103 FP
k. A-104 FP
l. A-105 FP
m. A-106 FP
n. A-107 FP
o. A-108 FP
p. A-109 RO
q. A-110 RO
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 540 calendar days and complete it within ________________ ________________ calendar days after receiving
Project Description
11/18/2016
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
OCON
P.O. BOX 37012
MRC 1200
Washington DC 20013-7012
OCON
Thomas Dempsey
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 49
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
F16SOL10063
r. A-119 QP
s. A-120 QP
t. A-121 QP
u. A-201 EL
v. A-202 EL
w. A-203 EL
x. A-301 SC
y. Boards 1-4
a. Material Context & Proposed Pallet
b. Context + Materials + Patterning
c. As-Cast Over Acid Wash w/ Form Liner
d. Base Bid & Alternate
Period of Performance: 02/22/2017 to 08/16/2018
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SMITHSONIAN INSTITUTION
CONSTRUCTION
Qualification Statement
Solicitation No. F16SOL10063 for
National Museum of Air & Space
Udvar Hazy Center
Collections Storage Module
14390 Air & Space Museum Parkway
Chantilly, Virginia 20151
SI Project No. 1454504
Issue Date: September 29, 2016
Questions due: November 9, 2016
Due Date: November 18, 2016
Issuing Office:
Smithsonian Institution
Office of Contracting, Suite 5001
600 Maryland Avenue SW
Washington DC
Additional information must only be obtained by contacting:
Eve Errickson, Erricksone@si.edu
F16SOL10063
9/29/2016 p. 4 of 49
Completing the Qualification Statement
This Request for Qualifications is Phase 1 of a two-step solicitation to select a general contractor for construction of a storage facility at the National Air & Space Museum’s Udvar Hazy Center located in Dulles, Virginia (“Dulles
Collection Storage Module” also referred to as the “Subject Project”). This Request for Qualification (“RFQ”) is being released to expedite the bid process and selection of a construction contractor. Phase 2 of this procurement will be an
RFP numbered F16SOL10064, tentatively planned for release in January 2017 with 100% construction documents.
The contract award is anticipated in February 2017.
The information you provide in the Qualification Statement (“Qualification Statement, ”“Statement, ” or
“Submission”) will be the basis for the evaluation of your company or entity (“Offeror” or “Contractor”). Please be advised the prequalification of contractors is a highly competitive process. The most highly qualified offerors responding to this RFQ will be invited to submit a proposal on the RFP. Contract award under the RFP will be made on the basis of best value to the Smithsonian.
The Evaluation Process. This RFQ contains prequalifying criteria to assist the Smithsonian in identifying contractors with past, specialized experience needed for the subject project. The Smithsonian Institution will select the most highly qualified Offerors responding to this RFQ to receive the RFP and compete for the Subject Project. Qualifications are demonstrable through your prior completed projects in Comparable Experience (Part III) and Capabilities (Part IV) sections of the Qualification Statement (as described more fully below). Meeting the Minimum Requirements described herein will not guarantee prequalification. Offerors demonstrating the most Comparable Experience and Financial
Capabilities shall be considered for pre-qualification status. Statements of Qualifications will be evaluated by an
Evaluation Team and confirmed by the Contracting Officer.
To assure your Statement is given full consideration, you must do the following:
Read this package carefully to make sure you understand what is required.
Complete the entire Statement.
Provide your information on the attached forms or in the same format.
Do not leave any portion of the form blank. Indicate N/A if not applicable.
In particular, read the minimum requirements as established in the evaluation criteria. If your firm or partnership do not meet the minimum requirements your entity may not be considered for prequalification.
Include past experience on Comparable Projects. Comparable Projects are those of the same or similar cost, purpose, building type, grade of construction, regulatory requirements, zoning restrictions, safety requirements and meeting other factors listed in this RFQ for which the Offeror has successfully provided construction services. Projects listed shall be considered comparable to the extent they meet the criteria in this RFQ.
Please be advised that Comparable Experience is more desirable than Non-Comparable Experience. Any additional Comparable Experience submitted that exceeds the minimum requirements for Comparable
Experience will be assessed as Non-Comparable Experience.
Include Current references (name, address, and telephone number) for your comparable projects as listed in your submission. If the Evaluation Team is unable to contact the references listed to verify experience and performance, that project may not be considered.
Include Information and example projects that best illustrate your Entity’s experience and capability to construct the Project. Photographs of comparable projects are desirable but not required.
9/29/2016 p. 5 of 49
As a matter of clarification, the Smithsonian Institution reserves the right but not the obligation to consider the
Qualification Statement during the second phase of this solicitation, if appropriate. The Smithsonian also reserves the right to use reference information from Phase 1 during Phase 2 of this solicitation.
This Qualification Statement consists of four (4) Parts:
Part I - General Information
Part II - Entity’s Background
Part III – Firm Past Experience/Firm Past Performance
Part IV – Financial Capabilities
All questions regarding this solicitation should be directed to the individual(s) indicated on the cover page. Do not contact anyone else in the Smithsonian Institution regarding this effort.
9/29/2016 p. 6 of 49
PART I – PROJECT & SOLICITATION BACKGROUND
A. PROCEDURE
1. Phase 1, RFQ Process. Qualification Statements submitted by Offerors will be evaluated using the criteria stated in this solicitation to determine contractors to be placed on the pre-qualified list for this Project.
A. Submit one (1) original and seven (7) copies of the Statement. Copies must be separately bound, tape or comb style binding is preferred. The Statement should be indexed into sections and tabbed as indicated in each requirement of this package as follows:
* Tab No. 1 – Minimum Requirements
* Tab No. 1 - Entity’s Background
* Tab No. 2 - Judgments, Claims, Lawsuits,
* Tab No. 3 - Suspension or Debarment
* Tab No. 4 - Certification and Affirmation
* Tab No. 5 - Comparable Experience/Performance
* Tab No. 6 - Non-Comparable (Other) Experience/Performance
* Tab No. 7 - Organizational Statement
* Tab No. 8 – Safety, EMR (Experience Modification Ratio)
* Tab No. 9. - Backlog
* Tab No. 10 - Audited Financial Statements
* Tab No. 11 - Bonding Information
* Tab No. 12 - Banking Reference
B. Offerors not invited to respond to the RFP will be notified at the same time as the pre-qualified offerors, and provided an opportunity for debriefing prior to the issuance of the RFP. A debriefing is an opportunity for the contractors to understand how the Smithsonian Institution assessed the strengths and weaknesses of its submission. Requests for debriefing must definitively state names and titles of attendees, their availability and be in writing, to be received by the Smithsonian no later than three (3) calendar days after receiving notice of your status regarding the prequalification.
C. Statements will not be maintained or returned. Offerors will not be reimbursed for any expense(s) incurred in developing their Statement.
D. The Smithsonian Institution reserves the right to request project documents, such as subcontracting plans, prior to award.
2. Phase 2, RFP Process. Prequalified contractors will be invited to submit a Technical Proposal and Cost
Proposal in response to the forthcoming RFP.
A. The Proposals submitted in response to the RFP may include but may not be limited to the following requirements:
* A construction organization chart of the proposed project team, including key personnel, on-site staff and major subcontractors with resumes and duties/responsibilities.
* A narrative on the Offeror’s project management approach to responsibility, reporting relationships between units/personnel with resumes.
* A summary schedule for the Project using a critical path method (CPM) format showing design and construction, submittals, procurements, etc.
* A safety program showing your Experience Modification Ratio (EMR) for past three (3) years of the construction side entity and key elements of your site specific program.
* A purchasing plan: Identify all self-performed work and approach to procurement of subcontracts.
B. The Smithsonian Institution will use information obtained from the Technical Proposal and Cost Proposal provided by each contractor on the pre-qualified list in determining best value to the Smithsonian.
9/29/2016 p. 7 of 49
C. The Smithsonian reserves the right to utilize information obtained in the RFQ process as part of its evaluation of the proposals received in the proposals provided during the RFP process.
D. During the second phase, Contractors may be required to present an Oral Presentation of their Technical
Proposal and Cost Proposal. This requirement is in the sole discretion of the Smithsonian.
E. The Smithsonian Institution intends to issue a contract firm, fixed price for construction of this Project as described in this solicitation and the Concept Drawings.
F. Final execution of the Contract is subject to approval of funding by the Smithsonian Institution.
B. PROJECT DESCRIPTION
1. Background. The Smithsonian Institution’s National Air and Space Museum (NASM) requires additional space for storage, care and conservation of its collection of accessioned aircraft, spacecraft, equipment, and related historical artifacts. These items require storage in a strictly controlled environment to ensure their longevity and integrity. Fluctuations in temperature and humidity may materially harm artifacts and cause damage that is difficult to calculate. With limited space on the National Mall, NASM Master Plan designated the NASM Udvar-Hazy Center (NASM-UHC) as its primary location for expansion and growth of space for collections storage, care and conservation-related activities. NASM-UHC is located on Metropolitan
Washington Airport Authority (MWAA) located by Dulles Airport.
The Dulles Collection Storage Module will be the first such addition to be built at NASM-UHC. This
124,000 sf building will be the first of three planned additions that will house the museum’s extensive collections. The contemplated module will consist of a three story, steel frame structure with concrete floors and a pre-cast concrete panel skin and have new, museum quality systems for HVAC, Fire Protection and
Security with appropriate redundancy and emergency power.
The structure is currently being designed by Smithsonian Facilities Office of Planning Design and
Construction (SF-OPDC). The Authority Having Jurisdiction (AHJ) for Code Review, Permitting, and
Inspection is the Metropolitan Washington Airport Authority.
2. Scope of Work. Work under this project includes modification of the existing UHC Restoration Hangar and
Construction of the new Collection Storage Module (as depicted in the attached Concept Drawings). The
Work is summarized and supplemented as follows:
a. General Conditions: qualified professional services, equipment, materials, labor, management and personnel to obtain permits, construct and document construction of the Module as a USGBC-LEED Silver Project, to include enhanced commissioning;
b. Demolition: selective removal of existing building fabric and structure to adjoin the new Module to the
Existing Hangar;
c. Civil: soil/sediment erosion control, storm water management, foundation excavation, utility relocation and tie-ins;
d. Structural: concrete foundations, steel structure, metal decks and concrete floor slabs;
e. Architectural: pre-cast concrete panel skin, CMU walls, metal stud framing and GWB walls, elevator, modified bitumen roofing system, interior finishes, fixtures and furnishings including cold storage boxes and compact shelving systems;
f. Mechanical: new cooling plant (chillers, pumps, heat exchangers), new heating plant (modular boilers, pumps), steam generators for humidification, piping, air handling units, ductwork, and DDC Control
9/29/2016 p. 8 of 49 systems;
g. Electrical: 277/480V-3 phase electrical distribution system, panel boards, branch wiring, fixtures, switches and outlets;
h. Emergency power: generator, panel boards, branch wiring for specific lights and equipment;
i. Plumbing: water distribution system, sanitary system, three (3) toilet rooms with fixtures, and roof leaders;
j. Fire Detection (including a VESDA system), fire alarms, and zone-controlled suppression systems
(including copper piping and ESFR heads within Museum Collections Areas);
k. Security: power, data, cameras, and intrusion sensors using Software House C-Cure Programming; and
l. Telecommunications/IT: new network switches with UPS, wall-mounted VoIP phones, and multiple wireless access points.
3. Construction Schedule. Total period of performance allowed for construction is 540 calendar days from date of
Notice to Proceed.
4. Construction Budget. Estimated cost range is $35M.
5. RFQ Concept Drawings. Attached please find project documents titled “Dulles Collections Center Storage
Module,” as follows:
a. C 110 SP
b. C 105 UP
c. G-101 SP
d. G-102 SP
e. G-103 SP
f. AD 101 FP
g. AD 102 EL
h. A-101 FP
i. A-102 FP
j. A-103 FP
k. A-104 FP
l. A-105 FP
m. A-106 FP
n. A-107 FP
o. A-108 FP
p. A-109 RO
q. A-110 RO
r. A-119 QP
s. A-120 QP
t. A-121 QP
u. A-201 EL
v. A-202 EL
w. A-203 EL
x. A-301 SC
y. Boards 1-4
a. Material Context & Proposed Pallet
b. Context + Materials + Patterning
c. As-Cast Over Acid Wash w/ Form Liner
d. Base Bid & Alternate
9/29/2016 p. 9 of 49
C. MINIMUM REQUIREMENTS
1. Five (5) years experience in the capacity of construction contractor.
2. A minimum of three projects, completion or ongoing construction of three (3) comparable projects within the past five (5) years; one (1) of which must be a major renovation or major addition minimally $20M in value.
In assessing comparable experience as part of this RFQ, greater value will be placed on projects meeting all the following criteria. In the event that projects do not meet all the criteria, consideration will be given the extent to which offered projects meet such criteria:
a. Construction of a new facility of same or similar size and purpose to the subject project;
b. Coordination and sequencing required for tie-in to a central utility source;
c. LEED certification for the construction of a comparable facility;
d. Controlled access requirements for the immediate surrounds of the project;
e. Environmental controls required for museum conservation activities in keeping with AAM goals;
f. Coordination with numerous specialty subcontractors relevant to the subject project; and
g. Projects completed in an occupied facility or on an active, occupied campus.
3. As part of this solicitation, the Smithsonian may, but is not required to give greater consideration to the following criteria when evaluating comparable projects: same or similar building type to the subject project, same or similar operational requirements to the subject project, and whether the Owner is or was a federal agency or a state government.
4. The Smithsonian reserves the right to determine the extent to which Offeror’s comparable projects meet the
Minimum Requirements set forth in this RFQ and as clarified in this Section C. Nothing in this section shall be construed to require the Smithsonian to substitute non-comparable experience for comparable experience in its evaluation of submissions in response to this RFQ. Examples include:
a. The Smithsonian may determine whether and to what degree an offered project is comparable to the subject project in terms of perceived difficulty, required expertise and complexity;
b. The Smithsonian may determine whether and to what degree an offered project included mechanical systems sufficient for successful conservation of museum artifacts;
c. The Smithsonian may consult PPIRs records on the offered projects, whether comparable or non-comparable, to confirm scope of work, such as the amount of work with a relevant trade; and
d. The Smithsonian may determine whether and to what degree an offered project included trades, conditions, requirements and/or expertise was the same or similar to the subject project.
5. The Smithsonian reserves the right to use comparable experience information submitted under this RFQ in consideration of proposals as part of Phase 2 of this solicitation.
6. Projects constructed for the direct use or occupancy of the entity(s) submitting the Statement will not be considered as a comparable project.
7. Prospective contractors must be registered in the System for Acquisition Management (SAM) database prior to award of a contract. Information on registration and annual confirmation requirements may be obtained at www.sam.gov.
8. Respondents shall provide detail of their ability to meet the minimum requirements outlined above in Tab 1 which shall provide reference to each requirement and indicate, by page number, supporting evidence in their responses.
9/29/2016 p. 10 of 49
D. EVALUATION PROCEDURES
Upon meeting the above-referenced minimum requirements, the remainder of a fully completed Construction
Qualification Statement Package will be considered. The company’s Experience/Performance and Capabilities will be evaluated solely to determine if the entity is to be prequalified. Experience/Performance will be granted more weight than Capabilities. Within Experience/Performance, Comparable Experience shall be granted more weight than Non-Comparable Experience. Within Capabilities, Organization shall be granted more weight than
Safety. Financial responsibility will be determined on a pass/fail basis to assess responsibility to perform the subject project as described in the Concept Drawings and in this solicitation.
The Evaluation Team (ET) will evaluate entities submitting qualification statements to ensure that the company’s experience and resources are adequate to provide a high level of excellence in the execution of the project. Each member will individually evaluate each Qualification Statement. Only those entities demonstrating that they not only satisfy the stated minimum requirements, but also, show a performance history with the experience and capacity to successfully accomplish the proposed project will be prequalified. If submitting for qualification as a joint-venture, experience as a “team” is more favorable than experience by individual members.
E. METHOD AND DATE OF SUBMITTAL
The completed Qualification Statement should contain no more than fifty pages sized 8.5 x 11 and should be delivered as follows:
Address for US Mail Delivery. Eve Errickson
Office of Contracting
Smithsonian Institution
P.O. Box 37012 MRC 1200
Washington, D.C. 20013
(202) 633-5214 (tel)
Erricksone@si.edu
Physical Address for Deliveries. Eve Errickson
Office of Contracting
Smithsonian Institution
Suite 5001
600 Maryland Ave SW
Washington, DC
Statements must be received at the above address no later than 3:00PM Eastern Standard Time, November 18
2016.
For proper handling, your submission must be clearly marked for identification by including the following completed information on the outside of your package:
Contractor’s Name: (fill In)
Project Number: 1454504
Project Name: NASM-UHC Dulles Collection Storage Module
Location: Chantilly, Virginia
Due Date: (fill In)
9/29/2016 p. 11 of 49
MINIMUM REQUIREMENTS STATEMENT “AT-A-GLANCE” &
Supporting Documents Table of Contents
1) FIRM NAME: {____________________________________________________________}
LOCATION OF HEADQUARTERS: {__________________________________________}
PRIMARY CONTACT PERSON, TITLE:{______________________________________}
EMAIL & PHONE: {________________________________________________________}
NAME OF AUTHORIZED SIGNATORY, TITLE:{_______________________________}
2) JUDGEMENTS, CLAIMS, LAWSUITS, if any; if yes, list by year & claimant, description p. {INCLUDE
PAGE #}
A. {CLAIMANT NAME, YEAR FILED. CITY, STATE.}
3) DEBARMENT, state yes or no; description p. {INCLUDE PAGE #}
4) CERTIFICATION, p. {INCLUDE PAGE #}
5) COMPARABLE PROJECTS list TITLE, CITY, STATE, FINAL DOLLAR AMOUNT, description p. {INCLUDE PAGE #}
A. {CLIENT NAME, PROJECT TYPE. CITY, STATE. ≥$300,000,000.00.}
B. {CLIENT 2, PROJECT TYPE. CITY, STATE. ≥$300,000,000.000.}
C. {CLIENT 3, PROJECT TYPE. CITY, STATE. ≥$300,000,000.00.}
6) NON-COMPARABLE PROJECTS list TITLE, CITY, STATE, FINAL DOLLAR AMOUNT, description p. {INCLUDE PAGE #}
A. {CLIENT NAME, PROJECT TYPE. CITY, STATE (VALUE).}
B. {CLIENT 2, PROJECT TYPE. CITY, STATE (VALUE).}
C. {CLIENT 3, PROJECT TYPE. CITY, STATE (VALUE).}
7) ORGANIZATIONAL STATEMENT, p. {INCLUDE PAGE #}
8) EMR, { __________}, p. {INCLUDE PAGE #}
9) BACKLOG: list { # CONTRACTS OUTSTANDING & BALANCE FOR 2016}, p. {INCLUDE
PAGE #}
10) AUDITED FINANCIAL STATEMENTS, {Accountant Name}, p. {INCLUDE PAGE #}
11) BONDING: {Surety Name}, letter p. {INCLUDE PAGE #}, and
A. PER PROJECT LIMIT:{___________________________________________}
B. AGG.LIMIT:{______________________________________________________________}
C. AMT OUTSTANDING:{______________________________________________________}
12) BANKING REFERENCE, {Bank Name}, letter p. {INCLUDE PAGE #}
9/29/2016 p. 12 of 49
PART II – CONTRACTOR’S BACKGROUND (Submit Under Tab 1.)
A. Contractor’s Name: _____________________________________________________________
Street Address: _____________________________________________________________
City/State/Zip: _____________________________________________________________
Main telephone # _____ - ______ - ___________, Fax # _____ - ______ - _____________
B. Identification of two (2) contact people within the entity:
Name Title Phone Number Email Address
C. Firm making this submittal:
Parent Company _______ Subsidiary _______ Division ________ Branch Office ________
Other _______________________________________________________________________
D. Type of Company:
Corporation _____ Partnership _____ Sole Proprietorship _____ Joint Venture ___
Other ______________________________________________________________________
E. Year Company was established: _____________
F. Name, address, and telephone number of parent company (enter N/A if not applicable). _______
G. All former company names (enter N/A if not applicable). ________________________________
9/29/2016 p. 13 of 49
PART II – CONTRACTOR’S BACKGROUND (Continued)
H. Joint Venture: If this Qualification Statement is being presented by a Joint Venture, please indicate the participation of each entity. If not a Joint Venture, indicate Not Applicable
(N/A).
NAME OF JOINT
VENTURE
PARTNER
TYPE OF
PARTICIPATION
PERCENTAGE OF
FINANCIAL
PARTICIPATION
PERCENTAGE
OPERATIONAL
PARTICIPATION
I. Judgments, Claims, and Lawsuits
Are there any judgments, claims, and/or lawsuits pending or outstanding against or involving your company? No
___, Yes ___. If “Yes,” submit details of all judgments or claims against either parent office or division/branch that will be responsible for the accomplishment of this project on a separate sheet under
Tab 2.
J. List officers, Partners and/or Owners
NAME POSITION OR
TITLE
IN THE FIRM
NAME OF YEARS
WITH THE FIRM
YEARS OF
EXPERIENCE
9/29/2016 p. 14 of 49
PART II – CONTRACTOR’S BACKGROUND (Continued)
K. Is your company under suspension or debarment by any Federal, state or local agency or been terminated on any past projects (Smithsonian or others)?
No ___, Yes ___. If “Yes,” submit details on a separate sheet and submit under Tab 3.
L. Affirmation: I _______________________________, hereby certify that I am the authorized representative of the company submitting this Qualification Statement, and that the following statements are true to the best of my knowledge, information, and belief:
I affirm that neither the entity, nor any officer, controlling shareholder, partner, or principal, nor any other person substantially involved in the contracting activities of the company has in the past five (5) years:
(1) Been convicted under state or federal statutes of a criminal offense incident to obtaining or attempting to obtain or performing a public or private contract.
(2) Been convicted under state or federal statutes of fraud, embezzlement, theft, forgery, falsification or destruction of records, or receiving stolen property
(3) Been found civil liable under state or federal antitrust or other statutes for acts or omissions in connection with submission of bids or proposals for or performance of a public or private contract.
(4) Been criminally convicted of any violation of a state or federal antitrust statute.
(5) Been convicted under the provisions of Title 18 of the United States Code for violation of the Racketeer
Influence and Corrupt Organization Act, 18 USC, Section 1961 et seq. or the Mail Fraud Act, 18 USC, Section
1341 et seq., for acts arising out of the submission of Bids or Proposals for a public or private contract.
(6) Been criminally convicted of conspiracy to commit any act or omission that would constitute grounds for conviction or liability under any statute described in paragraphs (10), (2), (4), or (5) above; or
(7) Admitted in writing or under oath, during the course of an official investigation, or other proceeding, acts or omissions that would constitute grounds for conviction of liability under any statute described above.
(8) I certify that I have read and understand the instructions for completing the Qualification Statement and if I am unable to make the above Affirmation, I will provide an explanation as to why not on a separate sheet and submit under Tab 4.
Name (Printed) Date
Signature
Title
Entity Name
9/29/2016 p. 15 of 49
PART III – EXPERIENCE/PERFORMANCE
COMPARABLE EXPERIENCE – Using the form below, list a minimum of three (3) comparable projects (as defined in Part I, General Information, Section C) completed or in progress during the past five (5) years. Submit under
Tab 5 using the attached excel template. For each project, descriptions should be included in Project Sheets under Part
42 and be placed behind this form in your qualification statement. Do not include more than five (5) projects. In assessing comparable experience as part of this RFQ, consideration will be given to projects to the extent they meet the criteria set forth in Part I, Section C of this RFQ.
Firm’s office or branch that managed this project: _________________________________________
Project Name: ___________________________City ___________________ State _____ Zip ______
Project Size (SF): _______________ Contract Completion Date _______ Building Type: Museum ___, Library/Archive ___, Other Cultural ___, Government (y/n), if Other Describe _____________
Contract Type: GMP ___, D/B ___, Fixed Price ___, Other ___, If Other, Describe________________
Orig. Contract Amount: $______________ Final Contract Amount: $____________ % Change: ____*
Orig. Contract Duration ______________ Actual Contract Duration ___________ % Change: ____*
* If either Contract Completion time or Value increased by more than 5% attach an explanation.
Has this project received any awards (Construction, Quality, Safety or other): Yes ______ No ______
If yes, list: _____________________________________________________________________
Client Reference for Construction: (it is your responsibility to assure that the telephone number is correct. If your reference can not be contacted, this project may not count as a comparable.)
Owner’s Representative or Project Manager: _________________________________________________
Telephone: ____________________________ Email Address: _____________________________
Project Description (Building, Subject Matter, Challenges):
9/29/2016 p. 16 of 49
PART III – EXPERIENCE/PERFORMANCE – (continued)
Non-Comparable Experience - – Using the form below, list a minimum of three (3) non-comparable projects (as defined in Part I, General Information, Section C) completed or in progress during the past five (5) years. Submit under
Tab 5 using the attached excel template. For each project, descriptions should be included in Project Sheets under Part
42 and be placed behind this form in your qualification statement. Do not include more than five (5) projects. In assessing comparable experience as part of this RFQ, consideration will be placed to projects to the extent they meet the criteria set forth in Part I, Section C of this RFQ.
Firm’s office or branch that managed this project: _________________________________________
Project Name: ___________________________City ___________________ State _____ Zip ______
Project Size (SF): _______________ Contract Completion Date _______ Building Type: Museum ___, Library/Archive ___, Other Cultural ___, Government (y/n), if Other Describe _____________
Contract Type: GMP ___, D/B ___, Fixed Price ___, Other ___, If Other, Describe________________
Orig. Contract Amount: $______________ Final Contract Amount: $____________ % Change: ____*
Orig. Contract Duration ______________ Actual Contract Duration ___________ % Change: ____*
* If either Contract Completion time or Value increased by more than 5% attach an explanation.
Has this project received any awards (Construction, Quality, Safety or other): Yes ______ No ______
If yes, list: _____________________________________________________________________
Client Reference for Construction: (it is your responsibility to assure that the telephone number is correct. If your reference can not be contacted, this project may not count as a comparable.)
Owner’s Representative or Project Manager: _________________________________________________
Telephone: ____________________________ Email Address: _____________________________
Project Description (Building): ________________________________________________________
9/29/2016 p. 17 of 49
PART IV - CAPABILITIES
A. Organization: (Include in your submission under Tab 7). Organization will be reviewed on a qualitative basis as capability to perform. Consideration will be given to the extent that submissions demonstrate capability to successfully complete the subject project with relevant, project-specific detail.
Primary Evaluation Criteria - Attach a statement describing:
Your company, with an organization chart. The statement and organization chart must clearly identify specific organizational elements and/or member companies that will be participating in the project.
Location of units
Reporting relationships and functions to be performed by each unit
Successful past working relationships
Key Executive who will have overall responsibility
Key Management Personnel to be assigned to the project
Resumes of Key Personnel (w/ specific comparable project experience)
Professional staffing levels
Describe expertise, capability, structure, and resources to adequately handle building construction
Describe the company resources that would be available for the project
Provide an employment profile for the construction company showing: total employees, total permanent employees, and total professionals in each major category. Brief resumes of these individuals shall be attached.
B. Safety:
Information shall be furnished on your insurance carrier’s letterhead. (Submit under Tab 8)
Provide your firm’s Experience Modification Ratio (EMR) __ __. __ __. If your EMR is above 1.0, provide a written explanation.
If your firm is a joint venture and has no prior safety record, then the EMR of the majority construction partner shall be provided.
9/29/2016 p. 18 of 49
PART IV - CAPABILITIES
FINANCIAL RESPONSIBILITY is based on backlog; audited and interim financial statements; total bonding capability; written bank references; and determination that your company possesses sufficient resources to successfully complete this project. Financial capability elements will be reviewed for Offeror’s financial responsibility to perform, bond and insure the project, using the estimated construction cost of the subject project as described herein as a basis of comparison.
Provide your Dun and Bradstreet Number (DUNS #): _______________________________
You must be registered at System for Award Management (SAM) http://www.sam.gov
C. Backlog (Pass/Fail): Submit the information using the format shown below under Tab 9. Provide a statement of total entity backlog, currently and for the past two years. Include only those contracts for which the company has responsibilities and liabilities. Exclude construction management contracts.
A B A LESS B
# OF ACTIVE
CONTRACTS
TOTAL ORIGINAL
VALUE OF ACTIVE
CONTRACTS
TOTAL VALUE
COMPLETED FOR
ACTIVE CONTRACTS
BALANCE TO
COMPLETE ($)
i.e. BACKLOG
CURRENT
ONE YEAR
AGO
TWO YEARS
AGO
D. Financial Capability (Pass/Fail): Attach your most recent financial statements including the Balance Sheet, Statement of Income, Statement of Cash Flows, and notes to the financial statements. These statements must be
AUDITED by an independent, licensed CPA or CPA firm for the offeror’s previous two (2) fiscal years. Financial statements must be for the company making the submittal, not the parent company, unless a guarantee of the subsidiary’s obligations is provided. Provide the audited financial statements under Tab 10. Failure to submit audited financial statements may result in the disqualification of your submittal because a determination of financial responsibility can NOT be made without this information. Financial statements will be evaluated on a pass/fail basis to establish the responsibility of prospective contractors to perform the contract in accordance with
FAR 9.104. In addition, if the firm’s last fiscal year-end precedes the date of this submittal by more than six (6) months, complete the following “Contractor’s Interim Financial Data” form for the company’s most recent completed quarterly fiscal period. If the entity’s most recent fiscal year-end fell within the last six months;
completion of the form is not required.
(the remainder of this page purposefully left blank)
9/29/2016 p. 19 of 49 http://www.sam.gov/
Offeror’s Interim Financial Data
For the ________ month period ending ___________, ______
ASSETS LIABILITIES & NET WORTH
Current Assets Current Liabilities
CASH
ACCOUNTS RECEIVABLE
CONTRACTS (COMPLETED)
CONTRACTS (IN PROGRESS)
OTHER RECEIVABLES
LESS: RESERVE FOR UNCOL.
NOTES RECEIVABLE COSTS IN
EXCESS OF BILLING
INVENTORIES MARKETABLE
SECURITIES PREPAID EXPENSES
OTHER CURRENT ASSETS
TOTAL CURRENT ASSETS
NOTES PAYABLE
ACCOUNTS PAYABLE
ACCRUED EXPENSES
BILLINGS IN EXCESS OF COST
DEFERRED TAXES
OTHER CURRENT LIABILITIES
TOTAL CURRENT LIABILITIES
Long Term Liabilities
NOTES PAYABLE
DEFERRED TAXES
OTHER L/T LIABILITIES
TOTAL L/T LIABILITIES
Fixed Assets Net Worth
LAND
BUILDINGS
EQUIPMENT
FURNITURE & FIXTURES
LESS: ACCUM. DEPREC.
OTHER FIXED ASSETS
TOTAL FIXED ASSETS
CAPITAL STOCK
ADDITIONAL PAID-IN
RETAINED EARNINGS
TREASURY STOCK
OTHER ADJUSTMENTS
TOTAL NET WORTH
TOTAL LIAB+ NET WORTH
EARNED REVENUES+INCOME
COST OF REVENUES EARNED
GROSS INCOME
GENERAL & ADMIN, EXPENSE
NET INCOME
Other Assets
LIFE INSURANCE (CASH VALUE)
LONG TERM INVESTMENTS
OTHER ASSETS
TOTAL FIXED ASSETS
TOTAL ASSETS
9/29/2016 p. 20 of 49
PART IV – CAPABILITIES (continued)
E. Bonding (Pass/Fail): Please attach a letter from one or more bonding companies stating the following:
Your bonding capability with them.
The amount of bonding outstanding.
How long they have been providing bonds to your company.
Submit the bonding company’s letter under Tab 11.
F. Banking (Pass/Fail): Please attach a letter from a bank stating the following:
1. How long has the company been with your bank.
2. Average balance (in general terms).
3. Extent of credit available and terms of availability.
4. The bank’s rating of the company as a customer.
5. Name and telephone number and/or email address of person(s) at bank who can be contacted by
Smithsonian Institution evaluators.
6. Submit the bank reference under Tab 12.
9/29/2016 p. 21 of 49
I A
D
P
R O
P E
R T
Y
L
I N
E
R
O
U
T
E
R
O
U
E
HAUL AND
ACCESS PATH
A
R
A
N
D
S
P
A
C
E
M
U
S
E
U
M
K
W
Y
HAUL AND
ACCESS PATH
WORKER
PARKING
AREA
STABILIZED CONSTRUCTION ENTRANCE
CONCRETE WASHOUT STRUCTURE
STOCKPILE AREA
STAGING AREA
PROPOSED BUILDING ADDITION
6' CHAIN LINK
SAFETY FENCE
N
42x28m [138'x92'] TRAILER
AND PARKING AREA
WORKER
ACCESS PATH
M U
E
S
U
M
E
C
A
P
S
DN
A
R
I
A
L
A
N
O
I
T A
N
DULLES CENTER
STEVEN F. UDVAR-HAZY CENTER
KEY PLAN
STAMP
DATE SUBMISSION
REVISION REVISION
REVISION 1
REVISION 2
REVISION 3
REVISION 4
REVISION 5
REVISION 6
REVISION 7
Smithsonian
Institution
Smithsonian Facilities
600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
BUILDING NAME
ADDRESS
PROJECT TITLE
SF PROJECT NUMBER
A/E PROJECT NUMBER
DRAWING TITLE
DRAWING TYPE
WORKING STAFF
DESIGNED BY DRAWN BY CHECKED BY
DISCIPLINE
TYPE
DRAWING TYPE
SHEET NO.
OF
STRUCTURAL ENGINEER
M/E/P ENGINEER
CIVIL ENGINEER
Rummel, Klepper & Kahl, LLP
81 Mosher Street
Baltimore, MD 21217
Phone: (410) 728-2900
Fax: (410) 728-2834
Mueller Associates
1306 Concourse Drive
Suite 100
Linthicum, Maryland 21090
Phone: (410) 646-4500
Fax: (410) 646-4738
Robert Silman Associates
1053 31st Street, NW
Washington, DC 20007
Phone: (202) 333-6230 x 200
Fax: (202) 318-3015
FIRE PROTECTION/
SECURITY/TELECOM
GHD
14585 Avion Pkwy, Suite 150
Chantilly, VA 20151
Phone: (571) 352-5032
COST CONSULTANT
Dharam Consulting
1719 Chestnut Street, Suite 300
Philadelphia, PA 19103
Phone: (215) 563-0525
1040 HULL STREET, SUITE 100
(410) 347-8500PHONE:
(410) 347-8519FAX:
BALTIMORE, MARYLAND 21230
NASM Udvar-Hazy Center
09/01/16
100% CONSTRUCTION
DOCUMENTS RESUBMISSION
MNC/CWWM MNC/CWWM MBT
B A L S R V V S I I D I Q T A S K
D U L L E S
S W I N G
S P A C E C A D D P L A N S S I T E
U T I L I Z A T I O N
P L A N D W G
SEQUENCE
300 150 0 300 600
SCALE: 1"=300'
SITE UTILIZATION PLAN
1454504
15099-003
DULLES SWING SPACE
MODULE
1400 CONSTITUTION AVE
WASHINGTON, D.C. 20560
CIVIL
GENERAL NOTES:
1. CONTRACTOR TO PROVIDE SITE UTILIZATION PLAN AS A
SUBMITTAL TO COTR FOR APPROVAL PRIOR TO MOBILIZATION.
2. CONSTRUCTION TRAILERS WILL BE PROVIDED (SI AND
CONTRACTOR) PER SPECIFICATIONS
2.1. POWER WILL BE FROM THE SUPPORT FACILITIES BUILDING
(CONTRACTOR TO VERIFY AVAILABILITY)
2.2. SANITARY AND WATER, IF AVAILABLE WILL BE FROM SITE
UTILITIES ASSOCIATED WITH THE SUPPORT FACILITIES
BUILDING (CONTRACTOR TO VERIFY)
3. HAUL ROUTE AND CONSTRUCTION ENTRY TO BE FROM US 50
ALONG SECURE ACCESS ROAD.
4. US50 ENTRANCE GUARDHOUSE WILL BE MANNED BY SI SECURITY
AND ID CHECK WILL BE REQUIRED DURING CONSTRUCTION
HOURS.
5. CONSTRUCTION WORKER PARKING TO BE WITHIN THE MUSEUM
PARKING LOT AS SHOWN.
6. SECURITY ENTRY SHALL REMAIN CLOSED WITH LIMITED ACCESS.
CONSTRUCTION ACTIVITIES TO BE SCHEDULED WITH COTR AND
OPS.
7. HAUL RODE SHALL BE CLEANED, INSPECTED AND MAINTAINED
DAILY.
F16SOL10063
9/29/2016 p. 22 of 49
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
SP
CONTRACTOR LIMIT
OF DISTURBANCE /
LIMIT OF WORK
CONTRACTOR LIMIT
OF DISTURBANCE /
LIMIT OF WORK
S D x
S D x
S D x
S D x
S D x
S D x
SD
x
SD
x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
C x
C x
C x
C x x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
E x
E x
E x
E x
E x
E x E x
E x
E x
E x
E x
G x
G x G x
G x
G x
G x
G x
G x
G x
W x
W x
W x
W x W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
S S x
W x
W x
W x
W x
W x
W x
W x W x
W x
E x
E x
E x
E x
E x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
C x
C x
C x
C x
C x
C x
W x
W x
W x
W x
X
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
E x
E x
E x
S D x
S D x
S D x
S D x
W x
W x W x
W x
W x
W x
W x
W x
W x
SS
x
SS
x
SS
x
S
Sx
S
Sx
S
Sx
S
Sx
S
Sx
W x
S
D x
S
D x
S
D x
W x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
SS
x
SS
x
SS
x
SS
x
SS
x
7 1110
150mm (6") CL 52 D.I.P. 300mm (12") CL 52 DIP
200mm (8")FIRE
LINE, CL 52 DIP
150mm (6") DOMESTIC, CL 52 DIP
FOR CONTINUATION SEE
PLUMBING DRAWINGS
150mm (6") CL 52 DIP
300mm (12") WET TAP
SLEEVE, F.H. ASSEMBLY
150mm GATE VALVE
FOR CONTINUATION SEE
PLUMBING DRAWINGS
FOR CONTINUATION
SEE FIRE PROTECTION
DRAWINGS
CONNECT TO
EXISTING SANITARY
MANHOLE
PROPOSED 1.22m [4.0']
PRECAST CONCRETE
MANHOLE
PROPOSED 1.22m
(4.0') PRECAST
CONCRETE
MANHOLE
150mm (6") PERF. PVC TYP.
460mm (18") RCP m
D
C
L
BIORETENTION BASIN B
200m² LEVEL 1
ELEV.=87.30m
CLEANOUT / OBSERVATION WELL
(TYP. OF 4 - THIS FACILITY)
CLEANOUT / OBSERVATION WELL
(TYP. OF 4 - THIS FACILITY)
300mm (12") PVC
ROOF DRAIN
m m
D
C
L
R
C
P
R
C
P
200mm (8")
DIP CL 52
PROPOSED
CLEANOUT
BIORETENTION BASIN A
335m² LEVEL 1
ELEV.=87.58m
STONE FLOW
SPREADER
150mm (6") PERF. PVC (TYP.)
355mm (14") PVC
ROOF DRAIN
100 mm (4") PVC
FOUNDATION DRAIN
MEP UTILITIES, SEE
MEP DRAWINGS (TYP.)
MEP UTILITIES, SEE
MEP DRAWINGS (TYP.)
COOLING TOWER ON
1220 PLATFORM, SEE
MEP & ARCH DRAWINGS
DIESEL GENERATOR,
SEE MEP DRAWINGS
STONE FLOW SPREADER
LOAD BANK, SEE
MEP DRAWINGS
250mm (10") PVC
ROOF DRAIN
EX. STEEL CASING PIPE
EXISTING 4" WATER
METER (NOT SHOWN) TO
REMAIN.
UTILITY COMPOSITE PLAN
1454504
15099-003
DULLES SWING SPACE
MODULE
1400 CONSTITUTION AVE
WASHINGTON, D.C. 20560
NOTES:
1) THIS SURVEY IS FOR EXISTING CONDITIONS ONLY.
2) NO TITLE REPORT FURNISHED WHICH MAY REVEAL OR DISCOVER EASEMENTS NOT
SHOWN HEREON.
3) THE LOCATION OF FENCES (IF SHOWN) ARE APPROXIMATE AND DO NOT CERTIFY
OWNERSHIP.
4) UNDERGROUND UTILITY INFORMATION SHOWN HEREON IS BASED UPON DESIGNATIONS
AND MAPPING PERFORMED BY RICE ASSOCIATES BETWEEN THE DATES OF MARCH 23,
2015 AND APRIL 2, 2015.
5) NO CEMETERY SITES WERE OBSERVED ON THE SUBJECT PROPERTY, HOWEVER THIS
DOES NOT PRECLUDE THEIR EXISTENCE.
6) THE PHYSICAL FEATURES SHOWN HEREON WERE DERIVED BY CONVENTIONAL SURVEY
METHODS, FIELD LOCATED BETWEEN THE DATES OF MARCH 16, 2015 AND APRIL 2, 2015.
7) COORDINATES AND GEOMETRY SHOWN HEREON ARE REFERENCED TO NAD '83 (93)
DATUM AND ELEVATIONS SHOWN HEREON ARE BASED UPON VERTICAL DATUM NAVD
'88 BY GPS METHODS. THE CONTOUR INTERVAL IS 0.5 METERS.
M
U
E
S
U
M
E
C
A
P
S
DN
A
R
I
A
L
A
N
O
I
T A
N
DULLES CENTER
STEVEN F. UDVAR-HAZY CENTER
KEY PLAN
GRAPHIC SCALE(S)
STAMP
DATE SUBMISSION
REVISION REVISION
REVISION 1
REVISION 2
REVISION 3
REVISION 4
REVISION 5
REVISION 6
REVISION 7
Smithsonian
Institution
Smithsonian Facilities
600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
BUILDING NAME
ADDRESS
PROJECT TITLE
SF PROJECT NUMBER
A/E PROJECT NUMBER
DRAWING TITLE
DRAWING TYPE
WORKING STAFF
DESIGNED BY DRAWN BY CHECKED BY
DISCIPLINE
TYPE
DRAWING TYPE
SHEET NO.
OF
STRUCTURAL ENGINEER
M/E/P ENGINEER
CIVIL ENGINEER
Rummel, Klepper & Kahl, LLP
81 Mosher Street
Baltimore, MD 21217
Phone: (410) 728-2900
Fax: (410) 728-2834
Mueller Associates
1306 Concourse Drive
Suite 100
Linthicum, Maryland 21090
Phone: (410) 646-4500
Fax: (410) 646-4738
Robert Silman Associates
1053 31st Street, NW
Washington, DC 20007
Phone: (202) 333-6230 x 200
Fax: (202) 318-3015
FIRE PROTECTION/
SECURITY/TELECOM
GHD
14585 Avion Pkwy, Suite 150
Chantilly, VA 20151
Phone: (571) 352-5032
COST CONSULTANT
Dharam Consulting
1719 Chestnut Street, Suite 300
Philadelphia, PA 19103
Phone: (215) 563-0525
1040 HULL STREET, SUITE 100
(410) 347-8500PHONE:
(410) 347-8519FAX:
BALTIMORE, MARYLAND 21230
NASM Udvar-Hazy Center
GRAPHIC SCALE (m)
1:300
6 0 6 12
09/01/16
100% CONSTRUCTION
DOCUMENTS RESUBMISSION
MNC/CWWM MNC/CWWM MBT
B A L S R V V S I I D I Q T A S K
D U L L E S
S W I N G
S P A C E C A D D P L A N S
C D W G
SEQUENCE
PROPOSED BUILDING
LEGEND
PROPOSED BIORETENTION
FACILITY
CIVIL
PROPOSED SANITARY SEWER
PROPOSED DOMESTIC
PROPOSED STORM SEWER
WATERLINE
INDEX CONTOUR
INTERMEDIATE CONTOUR
PROPOSED CONCRETE
PAVEMENT
CONTRACTOR LIMITS OF
DISTURBANCE
THE LIMIT OF DISTURBANCE (LOD) SHOWN INCLUDES AREAS OF
TEMPORARY DISTURBANCE NECESSARY FOR THE CONTRACTOR
TO COMPLETE THE WORK. THE STORMWATER MANAGEMENT
LOD (SWM-LOD) SHOWN ON SHEET C701 INCLUDES ALL AREAS
OF DISTURBANCE WHICH RESULT IN HYDRAULIC CHANGE.
CONTRACTOR TO RETURN ALL AREAS OUTSIDE THE SWM-LOD
TO THE EXISTING HYDRAULIC CONDITION AT THE CONCLUSION
OF THE PROJECT.
LIMIT OF DISTURBANCE NOTE
F16SOL10063
9/29/2016 p. 23 of 49
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text 20602
AutoCAD SHX Text 88.97
AutoCAD SHX Text
SP
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
UK
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text 87.5
AutoCAD SHX Text 87.5
AutoCAD SHX Text 87.5
AutoCAD SHX Text 87.5
AutoCAD SHX Text 87.5
AutoCAD SHX Text 87.5
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
SANITARY LINE PER PLANS
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WV
AutoCAD SHX Text
NAD 83
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
UP
U K
C O N C
C O N C
U K
C O N C
C O N C
64 65 66 67 68
DAA
DBBDBB
DDDDDD
DFFDFF
DGGDGG
DJJDJJ
DKKDKK
HAUL RD CLEARANCE
EXISTING UHC,
PHASE 1 & 2
AREA 21
AREA 20
LEGEND:
DAA.1
DAA.9
DBB.9
DFF.1
DFF.9
DGG.8
DJJ.7
TRUE NORTH
E X
IS
T
IN
G
M
UE
S
UM
ECAPSDNARIA
LANOI
T A
N
DULLES CENTER
STEVEN F. UDVAR-HAZY CENTER
KEY PLAN
GRAPHIC SCALE(S)
STAMP
DATE SUBMISSION
REVISION REVISION
REVISION 1
REVIS…