Copy_of_Project_Description_Template.xls

XLS spreadsheet 92 KB Posted

Attached to
Construction of Storage Module at Udvar Hazy Museum Center
Solicitation number
F16SOL10063
Issued by

About this file

Project Description Template

View the file

Other files

File Type Posted
Copy_of_QA_2_F16SOL10063.pdf PDF
am_1_F16SOL10063.pdf PDF
FINAL_RFQ_F16SOL10063.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Matrix

Smithsonian InstitutionComparable Projects Overview
Office of Engineering, Design and Construction
DATAPROJECT #1PROJECT #2PROJECT #3
PROJECT GENERAL INFORMATION
01.Project Title:
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.Square Footage
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE: Reference RFQ Minimum Requirements, Section C
29.Coordination & sequencing for tie-in to central utility source
30.LEED Certification
31.Controlled access
33.Environmental Controls
34.Coordination with numerous specialty subcontractors relevant to this project
35.Completed in an occupied facility or on active, occupied campus
KEY PERSONNEL:PROPOSED FOR THIS PROJECTPROJECT #1PROJECT #2PROJECT #3
36.Lead POC
37.Alternate POC
NOTES (referring to this sheet and all other worksheets):
(1)If the proposal is presented by a JV, indicate which member of the JV performed the project presented for comparable experience evaluation.
(2)Provide reasons for deltas in Contract & Schedule data the single project presentation sheets at Block 39.
(3)For projects paid in different currency, please provide the amount in US Dollars and indicate rate of exchange used for conversion at Block 39 of the single project presentation sheets.
(4)List any additional key personnel proposed for this project and/or used for past performance projects, if any.
WARNING: INPUT DATA ONLY IN YELLOW CELLS ONLY

Project #1

Smithsonian InstitutionComparable Project 1NASM-UHC Collections Storage Module
Office of Engineering, Design and Construction
DATAPROJECT #10
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:38
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.Square Footage
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
MINIMUM REQUIREMENTS
29.Coordination & sequencing for tie-in to central utility source
30.LEED Certification
31.Controlled access
33.Environmental Controls
34.Coordination with numerous specialty subcontractors relevant to this project
35.Completed in an occupied facility or on active, occupied campus
KEY PERSONNEL:PROJECT NARRATIVE DESCRIPTION:
36.Lead POC39Please include awards, if any, and challenges relevant to the minimum criteria
37.Alternate POC

Project #2

Smithsonian InstitutionComparable Project 2NASM-UHC Collections Storage Module
Office of Engineering, Design and Construction
DATAPROJECT #20
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:38
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.Square Footage
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
MINIMUM REQUIREMENTS
29.Coordination & sequencing for tie-in to central utility source
30.LEED Certification
31.Controlled access
33.Environmental Controls
34.Coordination with numerous specialty subcontractors relevant to this project
35.Completed in an occupied facility or on active, occupied campus
KEY PERSONNEL:PROJECT NARRATIVE DESCRIPTION:
36.Lead POC39Please include awards, if any, and challenges relevant to the minimum criteria
37.Alternate POC

Project #3

Smithsonian InstitutionComparable Project 3NASM-UHC Collections Storage Module
Office of Engineering, Design and Construction
DATAPROJECT #30
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:38
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.Square Footage
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
MINIMUM REQUIREMENTS
29.Coordination & sequencing for tie-in to central utility source
30.LEED Certification
31.Controlled access
33.Environmental Controls
34.Coordination with numerous specialty subcontractors relevant to this project
35.Completed in an occupied facility or on active, occupied campus
KEY PERSONNEL:PROJECT NARRATIVE DESCRIPTION:
36.Lead POC39Please include awards, if any, and challenges relevant to the minimum criteria
37.Alternate POC

Non-Comp Matrix

Smithsonian InstitutionNon-Comparable Projects Overview
Office of Engineering, Design and Construction
DATAPROJECT #1PROJECT #2PROJECT #3
PROJECT GENERAL INFORMATION
01.Project Title:
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.Square Footage
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE: REFERENCE RFQ SECTION C
29.Coordination & sequencing for tie-in to central utility source
30.LEED Certification
31.Controlled access
33.Environmental Controls
34.Coordination with numerous specialty subcontractors relevant to this project
35.Completed in an occupied facility or on active, occupied campus
KEY PERSONNEL:PROPOSED FOR THIS PROJECTPROJECT #1PROJECT #2PROJECT #3
36.Lead POC
37.Alternate POC
NOTES (referring to this sheet and all other worksheets):
(1)If the proposal is presented by a JV, indicate which member of the JV performed the project presented for past experience evaluation.
(2)Provide reasons for deltas in Contract & Schedule data the single project presentation sheets at Block 39.
(3)For projects paid in different currency, please provide the amount in US Dollars and indicate rate of exchange used for conversion at Block 39 of the single project presentation sheets.
(4)List any additional key personnel proposed for this project and/or used for past performance projects, if any.
WARNING: INPUT DATA ONLY IN YELLOW CELLS ONLY

NC #1

Smithsonian InstitutionNon-Comparable Project 1NASM-UHC Collections Storage Module
Office of Engineering, Design and Construction
DATAPROJECT #10
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:38
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.Square Footage
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
MINIMUM REQUIREMENTS
29.Coordination & sequencing for tie-in to central utility source
30.LEED Certification
31.Controlled access
33.Environmental Controls
34.Coordination with numerous specialty subcontractors relevant to this project
35.Completed in an occupied facility or on active, occupied campus
KEY PERSONNEL:PROJECT NARRATIVE DESCRIPTION:
36.Lead POC39Please include awards, if any, and challenges relevant to the minimum criteria
37.Alternate POC

NC #2

Smithsonian InstitutionNon-Comparable Project 2NASM-UHC Collections Storage Module
Office of Engineering, Design and Construction
DATAPROJECT #20
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:38
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.Square Footage
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
MINIMUM REQUIREMENTS
29.Coordination & sequencing for tie-in to central utility source
30.LEED Certification
31.Controlled access
33.Environmental Controls
34.Coordination with numerous specialty subcontractors relevant to this project
35.Completed in an occupied facility or on active, occupied campus
KEY PERSONNEL:PROJECT NARRATIVE DESCRIPTION:
36.Lead POC39Please include awards, if any, and challenges relevant to the minimum criteria
37.Alternate POC

NC #3

Smithsonian InstitutionNon-Comparable Project 3NASM-UHC Collections Storage Module
Office of Engineering, Design and Construction
DATAPROJECT #30
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:38
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.Square Footage
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
MINIMUM REQUIREMENTS
29.Coordination & sequencing for tie-in to central utility source
30.LEED Certification
31.Controlled access
33.Environmental Controls
34.Coordination with numerous specialty subcontractors relevant to this project
35.Completed in an occupied facility or on active, occupied campus
KEY PERSONNEL:PROJECT NARRATIVE DESCRIPTION:
36.Lead POC39Please include awards, if any, and challenges relevant to the minimum criteria
37.Alternate POC