Copy_of_Project_Description_Template.xls
XLS spreadsheet 92 KB Posted
- Solicitation number
- F16SOL10063
About this file
Project Description Template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Copy_of_QA_2_F16SOL10063.pdf | ||
| am_1_F16SOL10063.pdf | ||
| FINAL_RFQ_F16SOL10063.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Matrix
| Smithsonian Institution | Comparable Projects Overview | ||||
| Office of Engineering, Design and Construction | |||||
| DATA | PROJECT #1 | PROJECT #2 | PROJECT #3 | ||
| PROJECT GENERAL INFORMATION | |||||
| 01. | Project Title: | ||||
| 02. | Project Location: | ||||
| 03. | Contract Number (if any): | ||||
| Owner of the project | |||||
| 04. | Name: | ||||
| 05. | Phone number: | ||||
| 06. | E-mail address: | ||||
| Point of contact (to evaluate performance) | |||||
| 07. | Name: | ||||
| 08. | Role in the project: | ||||
| 09. | Phone number: | ||||
| 10. | E-mail address: | ||||
| Alternalte point of contact (to evaluate performance) | |||||
| 11. | Name: | ||||
| 12. | Role in the project: | ||||
| 13. | Phone number: | ||||
| 14. | E-mail address: | ||||
| Role of the applicant | |||||
| 15. | Prime contractor, Joint Venture, Sub-contractor (1): | ||||
| 16. | Percentage of work completed by applicant: | ||||
| 17. | Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2): | ||||
| PROJECT TYPE | |||||
| 18. | Museum, Library, Archive or Other | ||||
| 19. | Square Footage | ||||
| PROJECT CONTRACT/ SCHEDULE DATA: | |||||
| 20. | Contract Award Date: | ||||
| 21. | Contract Completion (month/year, including any agreed-upon time extension): | ||||
| 22. | Actual Completion - month/year: | ||||
| 23. | Delta ( between above two cells) (3): | ||||
| 24. | Amount of Award ($) (4): | ||||
| 25. | Amount at Completion, including any agreed-upon addition/change order: | ||||
| 26. | Delta (between above two cells) (3): | ||||
| 27. | CPM Schedule Used (Yes or No): | ||||
| 28. | Liquidated Damages Assessed in $: (2) (4) | ||||
| PROJECT SCOPE: Reference RFQ Minimum Requirements, Section C | |||||
| 29. | Coordination & sequencing for tie-in to central utility source | ||||
| 30. | LEED Certification | ||||
| 31. | Controlled access | ||||
| 33. | Environmental Controls | ||||
| 34. | Coordination with numerous specialty subcontractors relevant to this project | ||||
| 35. | Completed in an occupied facility or on active, occupied campus | ||||
| KEY PERSONNEL: | PROPOSED FOR THIS PROJECT | PROJECT #1 | PROJECT #2 | PROJECT #3 | |
| 36. | Lead POC | ||||
| 37. | Alternate POC | ||||
| NOTES (referring to this sheet and all other worksheets): | |||||
| (1) | If the proposal is presented by a JV, indicate which member of the JV performed the project presented for comparable experience evaluation. | ||||
| (2) | Provide reasons for deltas in Contract & Schedule data the single project presentation sheets at Block 39. | ||||
| (3) | For projects paid in different currency, please provide the amount in US Dollars and indicate rate of exchange used for conversion at Block 39 of the single project presentation sheets. | ||||
| (4) | List any additional key personnel proposed for this project and/or used for past performance projects, if any. | ||||
| WARNING: INPUT DATA ONLY IN YELLOW CELLS ONLY |
Project #1
| Smithsonian Institution | Comparable Project 1 | NASM-UHC Collections Storage Module | ||||
| Office of Engineering, Design and Construction | ||||||
| DATA | PROJECT #1 | 0 | ||||
| PROJECT GENERAL INFORMATION | PROJECT PICTURES: | |||||
| 01. | Project Title: | 38 | ||||
| 02. | Project Location: | |||||
| 03. | Contract Number (if any): | |||||
| Owner of the project | ||||||
| 04. | Name: | |||||
| 05. | Phone number: | |||||
| 06. | E-mail address: | |||||
| Point of contact (to evaluate performance) | ||||||
| 07. | Name: | |||||
| 08. | Role in the project: | |||||
| 09. | Phone number: | |||||
| 10. | E-mail address: | |||||
| Alternalte point of contact (to evaluate performance) | ||||||
| 11. | Name: | |||||
| 12. | Role in the project: | |||||
| 13. | Phone number: | |||||
| 14. | E-mail address: | |||||
| Role of the applicant | ||||||
| 15. | Prime contractor, Joint Venture, Sub-contractor (1): | |||||
| 16. | Percentage of work completed by applicant: | |||||
| 17. | Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2): | |||||
| PROJECT TYPE | ||||||
| 18. | Museum, Library, Archive or Other | |||||
| 19. | Square Footage | |||||
| PROJECT CONTRACT/ SCHEDULE DATA: | ||||||
| 20. | Contract Award Date: | |||||
| 21. | Contract Completion (month/year, including any agreed-upon time extension): | |||||
| 22. | Actual Completion - month/year: | |||||
| 23. | Delta ( between above two cells) (3): | |||||
| 24. | Amount of Award ($) (4): | |||||
| 25. | Amount at Completion, including any agreed-upon addition/change order: | |||||
| 26. | Delta (between above two cells) (3): | |||||
| 27. | CPM Schedule Used (Yes or No): | |||||
| 28. | Liquidated Damages Assessed in $: (2) (4) | |||||
| MINIMUM REQUIREMENTS | ||||||
| 29. | Coordination & sequencing for tie-in to central utility source | |||||
| 30. | LEED Certification | |||||
| 31. | Controlled access | |||||
| 33. | Environmental Controls | |||||
| 34. | Coordination with numerous specialty subcontractors relevant to this project | |||||
| 35. | Completed in an occupied facility or on active, occupied campus | |||||
| KEY PERSONNEL: | PROJECT NARRATIVE DESCRIPTION: | |||||
| 36. | Lead POC | 39 | Please include awards, if any, and challenges relevant to the minimum criteria | |||
| 37. | Alternate POC |
Project #2
| Smithsonian Institution | Comparable Project 2 | NASM-UHC Collections Storage Module | ||||
| Office of Engineering, Design and Construction | ||||||
| DATA | PROJECT #2 | 0 | ||||
| PROJECT GENERAL INFORMATION | PROJECT PICTURES: | |||||
| 01. | Project Title: | 38 | ||||
| 02. | Project Location: | |||||
| 03. | Contract Number (if any): | |||||
| Owner of the project | ||||||
| 04. | Name: | |||||
| 05. | Phone number: | |||||
| 06. | E-mail address: | |||||
| Point of contact (to evaluate performance) | ||||||
| 07. | Name: | |||||
| 08. | Role in the project: | |||||
| 09. | Phone number: | |||||
| 10. | E-mail address: | |||||
| Alternalte point of contact (to evaluate performance) | ||||||
| 11. | Name: | |||||
| 12. | Role in the project: | |||||
| 13. | Phone number: | |||||
| 14. | E-mail address: | |||||
| Role of the applicant | ||||||
| 15. | Prime contractor, Joint Venture, Sub-contractor (1): | |||||
| 16. | Percentage of work completed by applicant: | |||||
| 17. | Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2): | |||||
| PROJECT TYPE | ||||||
| 18. | Museum, Library, Archive or Other | |||||
| 19. | Square Footage | |||||
| PROJECT CONTRACT/ SCHEDULE DATA: | ||||||
| 20. | Contract Award Date: | |||||
| 21. | Contract Completion (month/year, including any agreed-upon time extension): | |||||
| 22. | Actual Completion - month/year: | |||||
| 23. | Delta ( between above two cells) (3): | |||||
| 24. | Amount of Award ($) (4): | |||||
| 25. | Amount at Completion, including any agreed-upon addition/change order: | |||||
| 26. | Delta (between above two cells) (3): | |||||
| 27. | CPM Schedule Used (Yes or No): | |||||
| 28. | Liquidated Damages Assessed in $: (2) (4) | |||||
| MINIMUM REQUIREMENTS | ||||||
| 29. | Coordination & sequencing for tie-in to central utility source | |||||
| 30. | LEED Certification | |||||
| 31. | Controlled access | |||||
| 33. | Environmental Controls | |||||
| 34. | Coordination with numerous specialty subcontractors relevant to this project | |||||
| 35. | Completed in an occupied facility or on active, occupied campus | |||||
| KEY PERSONNEL: | PROJECT NARRATIVE DESCRIPTION: | |||||
| 36. | Lead POC | 39 | Please include awards, if any, and challenges relevant to the minimum criteria | |||
| 37. | Alternate POC |
Project #3
| Smithsonian Institution | Comparable Project 3 | NASM-UHC Collections Storage Module | ||||
| Office of Engineering, Design and Construction | ||||||
| DATA | PROJECT #3 | 0 | ||||
| PROJECT GENERAL INFORMATION | PROJECT PICTURES: | |||||
| 01. | Project Title: | 38 | ||||
| 02. | Project Location: | |||||
| 03. | Contract Number (if any): | |||||
| Owner of the project | ||||||
| 04. | Name: | |||||
| 05. | Phone number: | |||||
| 06. | E-mail address: | |||||
| Point of contact (to evaluate performance) | ||||||
| 07. | Name: | |||||
| 08. | Role in the project: | |||||
| 09. | Phone number: | |||||
| 10. | E-mail address: | |||||
| Alternalte point of contact (to evaluate performance) | ||||||
| 11. | Name: | |||||
| 12. | Role in the project: | |||||
| 13. | Phone number: | |||||
| 14. | E-mail address: | |||||
| Role of the applicant | ||||||
| 15. | Prime contractor, Joint Venture, Sub-contractor (1): | |||||
| 16. | Percentage of work completed by applicant: | |||||
| 17. | Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2): | |||||
| PROJECT TYPE | ||||||
| 18. | Museum, Library, Archive or Other | |||||
| 19. | Square Footage | |||||
| PROJECT CONTRACT/ SCHEDULE DATA: | ||||||
| 20. | Contract Award Date: | |||||
| 21. | Contract Completion (month/year, including any agreed-upon time extension): | |||||
| 22. | Actual Completion - month/year: | |||||
| 23. | Delta ( between above two cells) (3): | |||||
| 24. | Amount of Award ($) (4): | |||||
| 25. | Amount at Completion, including any agreed-upon addition/change order: | |||||
| 26. | Delta (between above two cells) (3): | |||||
| 27. | CPM Schedule Used (Yes or No): | |||||
| 28. | Liquidated Damages Assessed in $: (2) (4) | |||||
| MINIMUM REQUIREMENTS | ||||||
| 29. | Coordination & sequencing for tie-in to central utility source | |||||
| 30. | LEED Certification | |||||
| 31. | Controlled access | |||||
| 33. | Environmental Controls | |||||
| 34. | Coordination with numerous specialty subcontractors relevant to this project | |||||
| 35. | Completed in an occupied facility or on active, occupied campus | |||||
| KEY PERSONNEL: | PROJECT NARRATIVE DESCRIPTION: | |||||
| 36. | Lead POC | 39 | Please include awards, if any, and challenges relevant to the minimum criteria | |||
| 37. | Alternate POC |
Non-Comp Matrix
| Smithsonian Institution | Non-Comparable Projects Overview | ||||
| Office of Engineering, Design and Construction | |||||
| DATA | PROJECT #1 | PROJECT #2 | PROJECT #3 | ||
| PROJECT GENERAL INFORMATION | |||||
| 01. | Project Title: | ||||
| 02. | Project Location: | ||||
| 03. | Contract Number (if any): | ||||
| Owner of the project | |||||
| 04. | Name: | ||||
| 05. | Phone number: | ||||
| 06. | E-mail address: | ||||
| Point of contact (to evaluate performance) | |||||
| 07. | Name: | ||||
| 08. | Role in the project: | ||||
| 09. | Phone number: | ||||
| 10. | E-mail address: | ||||
| Alternalte point of contact (to evaluate performance) | |||||
| 11. | Name: | ||||
| 12. | Role in the project: | ||||
| 13. | Phone number: | ||||
| 14. | E-mail address: | ||||
| Role of the applicant | |||||
| 15. | Prime contractor, Joint Venture, Sub-contractor (1): | ||||
| 16. | Percentage of work completed by applicant: | ||||
| 17. | Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2): | ||||
| PROJECT TYPE | |||||
| 18. | Museum, Library, Archive or Other | ||||
| 19. | Square Footage | ||||
| PROJECT CONTRACT/ SCHEDULE DATA: | |||||
| 20. | Contract Award Date: | ||||
| 21. | Contract Completion (month/year, including any agreed-upon time extension): | ||||
| 22. | Actual Completion - month/year: | ||||
| 23. | Delta ( between above two cells) (3): | ||||
| 24. | Amount of Award ($) (4): | ||||
| 25. | Amount at Completion, including any agreed-upon addition/change order: | ||||
| 26. | Delta (between above two cells) (3): | ||||
| 27. | CPM Schedule Used (Yes or No): | ||||
| 28. | Liquidated Damages Assessed in $: (2) (4) | ||||
| PROJECT SCOPE: REFERENCE RFQ SECTION C | |||||
| 29. | Coordination & sequencing for tie-in to central utility source | ||||
| 30. | LEED Certification | ||||
| 31. | Controlled access | ||||
| 33. | Environmental Controls | ||||
| 34. | Coordination with numerous specialty subcontractors relevant to this project | ||||
| 35. | Completed in an occupied facility or on active, occupied campus | ||||
| KEY PERSONNEL: | PROPOSED FOR THIS PROJECT | PROJECT #1 | PROJECT #2 | PROJECT #3 | |
| 36. | Lead POC | ||||
| 37. | Alternate POC | ||||
| NOTES (referring to this sheet and all other worksheets): | |||||
| (1) | If the proposal is presented by a JV, indicate which member of the JV performed the project presented for past experience evaluation. | ||||
| (2) | Provide reasons for deltas in Contract & Schedule data the single project presentation sheets at Block 39. | ||||
| (3) | For projects paid in different currency, please provide the amount in US Dollars and indicate rate of exchange used for conversion at Block 39 of the single project presentation sheets. | ||||
| (4) | List any additional key personnel proposed for this project and/or used for past performance projects, if any. | ||||
| WARNING: INPUT DATA ONLY IN YELLOW CELLS ONLY |
NC #1
| Smithsonian Institution | Non-Comparable Project 1 | NASM-UHC Collections Storage Module | ||||
| Office of Engineering, Design and Construction | ||||||
| DATA | PROJECT #1 | 0 | ||||
| PROJECT GENERAL INFORMATION | PROJECT PICTURES: | |||||
| 01. | Project Title: | 38 | ||||
| 02. | Project Location: | |||||
| 03. | Contract Number (if any): | |||||
| Owner of the project | ||||||
| 04. | Name: | |||||
| 05. | Phone number: | |||||
| 06. | E-mail address: | |||||
| Point of contact (to evaluate performance) | ||||||
| 07. | Name: | |||||
| 08. | Role in the project: | |||||
| 09. | Phone number: | |||||
| 10. | E-mail address: | |||||
| Alternalte point of contact (to evaluate performance) | ||||||
| 11. | Name: | |||||
| 12. | Role in the project: | |||||
| 13. | Phone number: | |||||
| 14. | E-mail address: | |||||
| Role of the applicant | ||||||
| 15. | Prime contractor, Joint Venture, Sub-contractor (1): | |||||
| 16. | Percentage of work completed by applicant: | |||||
| 17. | Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2): | |||||
| PROJECT TYPE | ||||||
| 18. | Museum, Library, Archive or Other | |||||
| 19. | Square Footage | |||||
| PROJECT CONTRACT/ SCHEDULE DATA: | ||||||
| 20. | Contract Award Date: | |||||
| 21. | Contract Completion (month/year, including any agreed-upon time extension): | |||||
| 22. | Actual Completion - month/year: | |||||
| 23. | Delta ( between above two cells) (3): | |||||
| 24. | Amount of Award ($) (4): | |||||
| 25. | Amount at Completion, including any agreed-upon addition/change order: | |||||
| 26. | Delta (between above two cells) (3): | |||||
| 27. | CPM Schedule Used (Yes or No): | |||||
| 28. | Liquidated Damages Assessed in $: (2) (4) | |||||
| MINIMUM REQUIREMENTS | ||||||
| 29. | Coordination & sequencing for tie-in to central utility source | |||||
| 30. | LEED Certification | |||||
| 31. | Controlled access | |||||
| 33. | Environmental Controls | |||||
| 34. | Coordination with numerous specialty subcontractors relevant to this project | |||||
| 35. | Completed in an occupied facility or on active, occupied campus | |||||
| KEY PERSONNEL: | PROJECT NARRATIVE DESCRIPTION: | |||||
| 36. | Lead POC | 39 | Please include awards, if any, and challenges relevant to the minimum criteria | |||
| 37. | Alternate POC |
NC #2
| Smithsonian Institution | Non-Comparable Project 2 | NASM-UHC Collections Storage Module | ||||
| Office of Engineering, Design and Construction | ||||||
| DATA | PROJECT #2 | 0 | ||||
| PROJECT GENERAL INFORMATION | PROJECT PICTURES: | |||||
| 01. | Project Title: | 38 | ||||
| 02. | Project Location: | |||||
| 03. | Contract Number (if any): | |||||
| Owner of the project | ||||||
| 04. | Name: | |||||
| 05. | Phone number: | |||||
| 06. | E-mail address: | |||||
| Point of contact (to evaluate performance) | ||||||
| 07. | Name: | |||||
| 08. | Role in the project: | |||||
| 09. | Phone number: | |||||
| 10. | E-mail address: | |||||
| Alternalte point of contact (to evaluate performance) | ||||||
| 11. | Name: | |||||
| 12. | Role in the project: | |||||
| 13. | Phone number: | |||||
| 14. | E-mail address: | |||||
| Role of the applicant | ||||||
| 15. | Prime contractor, Joint Venture, Sub-contractor (1): | |||||
| 16. | Percentage of work completed by applicant: | |||||
| 17. | Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2): | |||||
| PROJECT TYPE | ||||||
| 18. | Museum, Library, Archive or Other | |||||
| 19. | Square Footage | |||||
| PROJECT CONTRACT/ SCHEDULE DATA: | ||||||
| 20. | Contract Award Date: | |||||
| 21. | Contract Completion (month/year, including any agreed-upon time extension): | |||||
| 22. | Actual Completion - month/year: | |||||
| 23. | Delta ( between above two cells) (3): | |||||
| 24. | Amount of Award ($) (4): | |||||
| 25. | Amount at Completion, including any agreed-upon addition/change order: | |||||
| 26. | Delta (between above two cells) (3): | |||||
| 27. | CPM Schedule Used (Yes or No): | |||||
| 28. | Liquidated Damages Assessed in $: (2) (4) | |||||
| MINIMUM REQUIREMENTS | ||||||
| 29. | Coordination & sequencing for tie-in to central utility source | |||||
| 30. | LEED Certification | |||||
| 31. | Controlled access | |||||
| 33. | Environmental Controls | |||||
| 34. | Coordination with numerous specialty subcontractors relevant to this project | |||||
| 35. | Completed in an occupied facility or on active, occupied campus | |||||
| KEY PERSONNEL: | PROJECT NARRATIVE DESCRIPTION: | |||||
| 36. | Lead POC | 39 | Please include awards, if any, and challenges relevant to the minimum criteria | |||
| 37. | Alternate POC |
NC #3
| Smithsonian Institution | Non-Comparable Project 3 | NASM-UHC Collections Storage Module | ||||
| Office of Engineering, Design and Construction | ||||||
| DATA | PROJECT #3 | 0 | ||||
| PROJECT GENERAL INFORMATION | PROJECT PICTURES: | |||||
| 01. | Project Title: | 38 | ||||
| 02. | Project Location: | |||||
| 03. | Contract Number (if any): | |||||
| Owner of the project | ||||||
| 04. | Name: | |||||
| 05. | Phone number: | |||||
| 06. | E-mail address: | |||||
| Point of contact (to evaluate performance) | ||||||
| 07. | Name: | |||||
| 08. | Role in the project: | |||||
| 09. | Phone number: | |||||
| 10. | E-mail address: | |||||
| Alternalte point of contact (to evaluate performance) | ||||||
| 11. | Name: | |||||
| 12. | Role in the project: | |||||
| 13. | Phone number: | |||||
| 14. | E-mail address: | |||||
| Role of the applicant | ||||||
| 15. | Prime contractor, Joint Venture, Sub-contractor (1): | |||||
| 16. | Percentage of work completed by applicant: | |||||
| 17. | Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2): | |||||
| PROJECT TYPE | ||||||
| 18. | Museum, Library, Archive or Other | |||||
| 19. | Square Footage | |||||
| PROJECT CONTRACT/ SCHEDULE DATA: | ||||||
| 20. | Contract Award Date: | |||||
| 21. | Contract Completion (month/year, including any agreed-upon time extension): | |||||
| 22. | Actual Completion - month/year: | |||||
| 23. | Delta ( between above two cells) (3): | |||||
| 24. | Amount of Award ($) (4): | |||||
| 25. | Amount at Completion, including any agreed-upon addition/change order: | |||||
| 26. | Delta (between above two cells) (3): | |||||
| 27. | CPM Schedule Used (Yes or No): | |||||
| 28. | Liquidated Damages Assessed in $: (2) (4) | |||||
| MINIMUM REQUIREMENTS | ||||||
| 29. | Coordination & sequencing for tie-in to central utility source | |||||
| 30. | LEED Certification | |||||
| 31. | Controlled access | |||||
| 33. | Environmental Controls | |||||
| 34. | Coordination with numerous specialty subcontractors relevant to this project | |||||
| 35. | Completed in an occupied facility or on active, occupied campus | |||||
| KEY PERSONNEL: | PROJECT NARRATIVE DESCRIPTION: | |||||
| 36. | Lead POC | 39 | Please include awards, if any, and challenges relevant to the minimum criteria | |||
| 37. | Alternate POC |
File details come from the government source that posted it. Updated .