Text version
(x)
F16SOL10024
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
OCON
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
08/22/2016000005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/22/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The RFP is amended as follows:
1) The attached amended bid sheets eliminates duplicated line items on page 4 of 6, as noted.
2) The attached amended bid sheet clarifies that line item 8 on page 3 of 6 refers to CMc's
'audited CAS rates' for its principle & branch offices.
Period of Performance: 11/16/2016 to 03/01/2018
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Thomas Dempsey
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
APPENDIX A_RFP F16SOL10024
REVISED BID SHEET & CERTIFICATION
October 18, 2016
BID SHEET
ITEM DESCRIPTION AMOUNT
001 Pre-construction Phase $___________
Services (Lump Sum)
002 Estimated General Conditions Reimbursable $___________
003 Estimated Maximum Reimbursable $___________
Construction Cost (MRCC) including contingency
004 Construction Services Profit/Fee ______%fee $___________
Estimated Guaranteed Maximum Price (0001+0002+0003+004.) $___________
Certification of Smithsonian Institution Furnished Construction Cost Limit (“CCL”) and Period of
Performance (completion by December 31, 2025 within 83 months of notice to initiate construction)
The Offeror named herein certifies that all construction cost for the project can be accomplished within the
Smithsonian Institution furnished CCL of $450,000,000.00 and the Offeror certifies that all work can be accomplished within the specified period of performance, as follows:
1. The CMc has based their fixed fee pre-construction services (Line Item 001) on the Construction Cost
Limit (CCL) of $450,000,000.00 for construction of the Project as set forth in Section C of this solicitation.
2. The CMc has provided a fixed fee for construction services calculated on the basis of the Construction
Cost Limit (CCL) of $450,000,000, as an option which may be exercised by the Smithsonian until the completion Pre-Construction Services.
3. Offerors shall provide Verification of Owner’s Costs of $450,000,000 on the form identified as Item
003 “Verification of Construction Costs.”
4. Any change in the CCL is expected to be determined at the end of the program verification phase. If the
Construction Cost Limit (CCL) changes after negotiation of the GMP, an equitable adjustment shall be made.
Equitable adjustments shall be based on the prices stated by the CMc on the attached Price Proposal Forms.
5. Offerors may provide up to fifteen (15) pages of back-up information supporting the costs shown on this
Bid Sheet. Pages 2-6 of this Bid Sheet are incorporated into this certification by reference.
So certified on behalf of the
Offeror:
Signature, Date
Name, Title
October 18, 2016
CMc Pre-Construction Phase Services Reporting Form (CCL $450,000,000.00)
ITEM 001
1. General (Section C.4.a)
2. Design (Section C.4.b)
3. Artifacts Logistics Coordination (Section C.4.c)
4. Budget & Cost Control (Section C.4.d)
5. Constructability Reviews (Section C.4.e)
6. Construction Plan (Section C.4.f)
7. Competitive Bid of Subcontracted Work (Section C.4.g)
8. Partnering (Section C.4.i)
9. Construction Staging Plan (Section C.4.j)
10. Quality Control Plan (Section C.4.k)
11. Safety Plan (Section C.4.l)
12. Site Utilization Plan (Section C.4.m)
13. Security Plan (Section C.4.n)
14. Exhibit Construction Logistics (Section C.4.o)
15. Scheduling (Section C.4.p)
16. Project Cost Tracking (Section C.4.r)
17. BIM Execution & Management Plan (Section C.4.s)
TOTAL PRECONSTRUCTION SERVICES FEE $
EXTENDED PRECONSTRUCTION SERVICES FEE, per day $
October 18, 2016
Construction Phase Services, Section C.5.a. (CCL-$450,000,000.00) ITEM 002
General Conditions Qty Unit Cost
1. Office Equipment
2. Telecommunications Services, including SI-friendly videoconferencing
3. Trash, debris control, LEED compliant waste disposal
4. Watchmen & security services
5. Storage & parking space
6. Temporary facilities (trailers, water, roads)
7. Employee Costs (reference Work Sheet A)
8. General Operating Costs (CMc’s audited CAS rates for principle
& branch offices)
9. Office Janitorial Services
10. Rodent & Vermin Control
11. Travel & relocation, including per diems & mileage
12. Builders’ Risk Policy
13. General Liability Policies
14. Bonds
15. Permits
16. Site Cleaning during construction, at substantial completion & final completion.
17. Project Documentation (Photography)
18. Project Signs
19. Layout for site, building structure & interior partitioning
20. Utilities-availability & usage, consumption charges
21. Temporary heat & weather protection
22. Barriers, barricades, walkways; dust & air control
23. Vertical Transportation
24. Pre-construction survey
25. Other (specify)
26. Other (specify)
27. Construction Fee/Profit Omitted
28. Mobilization
29. Submittals
30. Permits, Licenses, Fees
31. Testings
32. Noise Control
33. Equipment Rental
34. Punchlist
35. Health, Sanitation, Safety
36. Material Handling, Shipping, Storage
37. Quality Assurance
38. Demobilization
Total Construction Phase Fees $
General Conditions Per Day $
October 18, 2016
CMc Verification of Construction Costs
ITEM 003
1. Div. 2 Existing Conditions $
2. HAZMAT $
3. Div. 3 Concrete $
4. Div. 4 Masonry $
5. Div. 5 Metals $
6. Div. 6 Wood, Plastics and Composites $
7. Div. 7 Thermal and Moisture Protection $
8. Div. 8 Openings $
9. Div. 9 Finishes $
10. Div. 10 Specialties $
11. Div. 11. Equipment $
12. Div. 12 Furnishings $
13. Div. 13 Special Construction $
14. Div. 14 Conveying Systems $
15. Div. 21 Fire Suppression $
16. Div. 22 Plumbing $
17. Div. 23 HVAC $
18. Div. 26 Electrical $
19. Div. 27 Communications $
20. Div. 28 Electronic Safety & Security $
21. Div. 31. Earthwork $
22. Div. 32 Exterior Improvements $
23. Div. 33 Utilities $
24. Option 1-Vestibule 1 & Canopy Addition, North $
25. Option 2-Vestibule 2 & Canopy Addition, South $
26. Silver Shadow (012300) $
27. Convert Zone 2/Photovoltaic array & single ply (012300) $
28. Convert Zone 3/Terrace & single ply (012300) $
COST OF THE WORK-TOTAL $
Construction Phase Services, Profit/Fee Omitted $ Preconstruction Phase Services Fee Omitted $ General Conditions Omitted $ Reimburseable Contingency $ CMc Contingency $
TOTAL VERIFICATION OF Construction Costs (ITEM 003) $
Construction Phase Services Profit/Fee (ITEM 004) $
October 18, 2016
EMPLOYMENT COST WORK SHEET A
PLEASE NOTE THE FOLLOWING:
1. This attachment is to be included with the Offeror’s Cost Proposal. (Total Hours must at a minimum match those provided for evaluation in the Technical Proposal.)
2. If any of the positions noted below will not be filled by the Offeror, the Offeror is to note in the space provided what position will be handling the duties associated with the unfilled position.
POSITION EST. HOURS HOURLY RATE TOTAL COST
Senior Project Manager ______ $ $
Project Manager ______ $ $
Assistant Project Manager ______ $ $
Field Superintendent ______ $ $
Project Engineer (A/S/C) ______ $ $
Project Engineer (M/E/P) ______ $ $
Field Secretary/Clerk ______ $ $
Clerk/Document Control Person ______ $ $
Coordinated Drawing Engineer ______ $ $
Close Out Engineer ______ $ $
Field Accountant ______ $ $
Assistant Project Manager ______ $ $
Assistant Superintendent ______ $ $
Test Engineer ______ $ $
Laborer ______ $ $
BIM Manager ______ $ $
Cost Estimator ______ $ $
Scheduler ______ $ $
CQC Representative ______ $ $
Total Hours/Cost $
Based on hours per year
October 18, 2016
PRE-CONSTRUCTION SERVICES SCHEDULE OF COSTS
SERVICE ESTIMATED COST
1. Pre-Construction Services
Draft Preconstruction Task Schedule: $
Draft Preconstruction Task Schedule Presentation Meeting $
Final Preconstruction Task Schedule $
Draft Project Management Plan $
Monthly Reporting $
Project Team Meetings $
2.Cost Estimate Services (inclusive of ad hoc estimating as needed)
65% Project Documents: $
95% Project Documents: $
100% Project Documents: $
Final Project Documents $
Total for Cost Estimate: $
3. Constructability Reviews
65% Project Documents: $
95% Project Documents: $
100% Project Documents: $
Final Project Documents $
Total for Constructability: $
4. Partnering Sessions
Initial Workshop $
Offsite Workshop $