F_Consolidated Report_REVa.pdf

PDF 212 KB Posted

Attached to
Post 45 Upper Harbor Dredging Contract 5
Solicitation number
W912HP20B0004
Issued by

About this file

This consolidated report summarizes dredging work performed under a federal contract to maintain depths in the Charleston Upper Harbor. The contract required maintenance and new work dredging of approximately 4,012,000 cubic yards of unclassified material from eight acceptance sections of the harbor and depositing it in two placement areas. The contractor dredged using dredge(s) and other equipment from the dates of notice to proceed through actual completion, removing quantities of material before, during, and after dredging in each section. Placement was at Clouter Creek Highway Cell and Yellow House Creek. The report provides production and operating statistics, costs, claims, modifications, and lessons learned from the work performed under the contract.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POST 45 CHARLESTON UPPER HARBOR W912HP20B0004

MAINTENANCE AND NEW WORK DREDGING

F-1 ATTACHMENT F

CONSOLIDATED REPORT – DREDGING_REVa

TITLE: POST 45 CHARLESTON UPPER HARBOR MAINTENANCE AND NEW WORK DREDGING,

CHARLESTON AND BERKELEY COUNTIES, SOUTH CAROLINA

IFB NO. W912HP20B0004 CONTRACT NO. W912HP20C00XX

DRAWING NO. 9620 (Contract), 9621 (BD), 9622 (AD)

GOVERNMENT INSPECTOR:

CONTRACTOR:

CONTRACTOR'S SUPERINTENDENT:

TYPE EQUIPMENT USED ON JOB:

DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)

OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)

SUBCONTRACTORS:

DATES:

ADVERTISEMENT: BID OPENING:

AWARD: NOTICE TO PROCEED:

REQUIRED STARTING: ACTUAL STARTING:

REQUIRED COMPLETION DATE: ACTUAL COMPLETION:

NUMBERS DAYS ON JOB (PUMPING):

NUMBERS DAYS ON JOB (TOTAL):

DREDGING QUANTITIES:

REQUIRED PRODUCTION RATE:

ACTUAL PRODUCTION RATE:

CHARACTER OF MATERIALS:

NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE

NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED

WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP

WAS USED FOR REMOVAL.

k2tsoh9c Text Box Accompanying Amendment 01 (AM#01)

F-2 ATTACHMENT F

CONSOLIDATED REPORT – DREDGING

ADVERTISED QUANTITIES:

ACCEPTANCE

SECTION

REQUIRED

MAINTENANCE

DREDGING PRISM

REQUIRED NEW

WORK DREDGING

PRISM

ALLOWABLE

OVERDEPTH

PRISM

TOTAL

NO. LOCATION CY MEAS. * CY MEAS.* CY MEAS.** CY MEAS.

1 Daniel Island Bend

1597+51 to 1625+66

2 Clouter Creek Reach

1625+66 to 1695+66

3 Navy Yard Reach

1675+66 to 1749+49 1695+66 to 1749+49 4 North Charleston Reach

1749+49 to 1800+75

5 Filbin Creek Reach

1800+75 to 1853+00

6 Port Terminal Reach

1853+00 to 1873+26

7 Ordnance Reach

1873+26 to 1905+63

8 Ordnance Reach Turning Basin

1873+26 to 1905+63

Pier X-Ray South

Pier S

Pier T

Pier U

TC Dock DESC

1703+90 to 1704+90

MSDDC

1704+90 to 1720+83

TOTALS

F-3 ATTACHMENT F

BEFORE DREDGING QUANTITIES:

DREDGING PRISM

REQUIRED NEW

WORK DREDGING

PRISM

ALLOWABLE

OVERDEPTH

PRISM

TOTAL

NO. LOCATION CY MEAS. * CY MEAS.* CY MEAS.** CY MEAS.

1 Daniel Island Bend

1597+51 to 1625+66

1695+66 to 1749+49 4 North Charleston Reach

1749+49 to 1800+75

7 Ordnance Reach

1873+26 to 1905+63

F-4 ATTACHMENT F

AFTER DREDGING QUANTITIES:

DREDGING PRISM

REQUIRED NEW

WORK DREDGING

PRISM

ALLOWABLE

OVERDEPTH

PRISM

TOTAL

NO. LOCATION CY MEAS. * CY MEAS.* CY MEAS.** CY MEAS.

1 Daniel Island Bend

1597+51 to 1625+66

1695+66 to 1749+49 4 North Charleston Reach

1749+49 to 1800+75

7 Ordnance Reach

1873+26 to 1905+63

F-5 ATTACHMENT F

CONSOLIDATED REPORT - DREDGING

EFFECTIVE AND NON-EFFECTIVE TIME:

NAME OF

DREDGE

PUMPING:

HANDLING PIPE LINES:

HANDLING SWING LINES:

CLEARING PUMP AND PIPELINES:

CLEARING CUTTER:

CHANGING LOCATION ON JOB:

PASSING VESSELS:

SHORE LINE & SHORE WORK:

MINOR REPAIR:

PREPARATION:

MISCELLANEOUS:

MOBILIZATION AND

DEMOBILIZATION:

PRIVATE WORK:

SUNDAYS AND HOLIDAYS:

MAJOR REPAIRS:

LOST TIME:

LOST TIME NOT CHARGEABLE TO COST AT WORK:

TOTAL TIME:

AVERAGES:

WIDTH OF CUT:

LIFT:

NUMBER OF LOADS PER DAY:

CUBIC YARDS PER LOAD:

CUBIC YARDS PUMPED PER HOUR - CREDIT:

CUBIC YARDS PUMPED PER HOUR - GROSS:

CUBIC YARDS PUMPED PER DAY - CREDIT:

CUBIC YARDS PUMPED PER DAY - GROSS:

PUMPING TIME - HOURS PER DAY

TIME DELAYS AND CAUSES OF SUCH DELAYS:

F-6 ATTACHMENT F

CONSOLIDATED REPORT - DREDGING

PLACEMENT AREA(S): (FOR EACH PLACEMENT AREA)

PLACEMENT AREA: CLOUTER CREEK HIGHWAY CELL

TOTAL GROSS CYDS PLACED IN THE PLACEMENT AREA:

LOCATION: (WHAT DISCHARGE POINT)

REMARKS:

PLACEMENT AREA: YELLOW HOUSE CREEK

TOTAL GROSS CYDS PLACED IN THE PLACEMENT AREA:

LOCATION: (WHAT DISCHARGE POINT)

REMARKS:

WATER QUALITY:

NOTE: DOCUMENTATION SHOULD LIST ALL EFFORTS MADE TO INSURE

WATER QUALITY HAS BEEN MAINTAINED AND ANY PROBLEMS

THAT WERE ENCOUNTERED.

OTHER – EXPLAIN:

REMARKS, COMMENTS, AND LESSONS LEARNED:

F-7 ATTACHMENT F

COSTS/PRICES:

ORIGINAL CONTRACT AWARD AMOUNTS:

ITEM

NO. DESCRIPTION ESTIMATED

QUANTITY U/I UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND

DEMOBILIZATION -

MAINTENANCE AND NEW WORK

DREDGING IN CHARLESTON UPPER

HARBOR

1 JA JOB $_________

0002 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

CHARLESTON UPPER HARBOR

ACCEPTANCE SECTIONS 1-8

CY $_________ $_________

0003 DREDGING OF UNCLASSIFIED NEW

WORK MATERIAL IN CHARLESTON

UPPER HARBOR ACCEPTANCE

SECTIONS 1-8

0004 COMPLIANCE WITH ENDANGERED

SPECIES ACT AND MARINE

MAMMALS PROTECTION ACT

(CHARLESTON UPPER HARBOR AND

COOPER RIVER CHANNELS)

0005 REMOVAL OF UNIDENTIFIED KNOWN

OBJECTS

TOTAL (COMBINATION OF BASE

BID ITEMS 0001-0005)

OPTION

0006 MOBILIZATION AND

DEMOBILIZATION MAINTENANCE

AND NEW WORK DREDGING PIER X-

RAY SOUTH

0007 DREDGING OF UNCLASSIFIED

MAINTENANCE AND NEW WORK

MATERIAL PIER X-RAY SOUTH

0008 MOBILIZATION AND

DREDGING MARADS PIERS S,T,U

0009 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL MARADS

PIERS S,T,U

F-8 ATTACHMENT F

0010 DREDGING OF UNCLASSIFIED

MATERIAL TC DOCK

0010AA

MOBILIZATION AND

DEMOBILIZATION MAINTENANCE

DREDGING IN JOINT BASE

CHARLESTON CHANNEL TC Dock

1 JA JOB $_________

0010AB DESC (Sta. 1703+90 to

1704+90) 1 JA JOB $_________

0010AC MSDDC (Sta. 1704+90 to

1720+83) CY $_________ $_________

TOTAL (COMBINATION OF

OPTIONAL BID ITEMS 0006-0010)

TOTAL (COMBINATION OF BID

ITEMS 0001-0010)

ACTUAL CONTRACT AMOUNTS:

ITEM

NO. DESCRIPTION ESTIMATED

QUANTITY U/I UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND

DEMOBILIZATION -

MAINTENANCE AND NEW WORK

DREDGING IN CHARLESTON UPPER

HARBOR

0002 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

CHARLESTON UPPER HARBOR

ACCEPTANCE SECTIONS 1-8

0003 DREDGING OF UNCLASSIFIED NEW

WORK MATERIAL IN CHARLESTON

UPPER HARBOR ACCEPTANCE

SECTIONS 1-8

0004 COMPLIANCE WITH ENDANGERED

SPECIES ACT AND MARINE

MAMMALS PROTECTION ACT

(CHARLESTON UPPER HARBOR AND

COOPER RIVER CHANNELS)

0005 REMOVAL OF UNIDENTIFIED KNOWN

OBJECTS

TOTAL (COMBINATION OF BASE

BID ITEMS 0001-0005)

F-9 ATTACHMENT F

OPTION

0006 MOBILIZATION AND

AND NEW WORK DREDGING PIER X-

RAY SOUTH

0007 DREDGING OF UNCLASSIFIED

MAINTENANCE AND NEW WORK

MATERIAL PIER X-RAY SOUTH

0008 MOBILIZATION AND

DREDGING MARADS PIERS S,T,U

0009 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL MARADS

PIERS S,T,U

0010 DREDGING OF UNCLASSIFIED

MATERIAL TC DOCK

0010AA

MOBILIZATION AND

DEMOBILIZATION MAINTENANCE

DREDGING IN JOINT BASE

CHARLESTON CHANNEL TC Dock

1 JA JOB $_________

0010AB DESC (Sta. 1703+90 to

1704+90) 1 JA JOB $_________

0010AC MSDDC (Sta. 1704+90 to

1720+83) CY $_________ $_________

TOTAL (COMBINATION OF

OPTIONAL BID ITEMS 0006-0010)

TOTAL (COMBINATION OF BID

ITEMS 0001-0010)

MODIFICATIONS:

MOD 1: (BRIEF DESCRIPTION) $___________

MOD 2: (BRIEF DESCRIPTION) $___________

CLAIMS:

CLAIM 1: (BRIEF DESCRIPTION) $___________

CLAIM 2: (BRIEF DESCRIPTION) $___________

ADDITIONAL COSTS:

NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE.

k2tsoh9c Text Box Accompanying Amendment 01 (/AM#01)

File details come from the government source that posted it. Updated .