F_Ch149FormforGeneralSubBid_Misc Metals.doc
DOC document 34 KB Posted
- Attached to
- USPFO Warehouse Loading Dock Addition
- Solicitation number
- BD-14-1069-MILDV-10000-00000000358
- Issued by
- Middlesex County, Massachusetts
About this file
This document is a Commonwealth of Massachusetts Military Division Form for Sub-Bid for the construction of a Loading Dock at the USPFO Warehouse facility located at Camp Edwards in Bourne, MA. The work involves miscellaneous and ornamental ironwork, as well as other trades, and is part of a larger project with a 180-calendar day substantial completion timeframe. The project requires two filed sub-bids, and prevailing wage rates apply.
The sub-bid form outlines the requirements for sub-contractors, including providing a comprehensive list of labor and materials, agreeing to contract terms, and certifying the ability to work in harmony with other trades. Pricing, qualifications, and references are also required as part of the sub-bid submission. The sub-bid may be used by any general contractor, except those that are specifically excluded.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF MASSACHUSETTS
MILITARY DIVISION FORM FOR SUB-BID
Construct Loading Dock, USPFO Warehouse, MILIFBPN002598707700 Misc Ornamental Metals SUB-BID
To all General Bidders except those excluded:
A. The undersigned proposes to furnish all labor and materials required for completing, in accordance with the Plans, Specifications and addenda of the bid and section listed above, all the work specified in the applicable named category of the Specifications and in any Plans specified in such sections for the project but is not limited to, the work described and includes all Alterations and Demolition, Concrete, Masonry Restoration Construction, Miscellaneous and Ornamental Ironwork, Carpentry Work, Finish Carpentry, Sealants, Hollow Metal Work, Finish Hardware, Toilet and Shower Compartments, Toilet Accessories, Acoustical Ceiling System, Seamless Epoxy Flooring, Painting, Plumbing, Heating, Ventilation, Heating, Ventilation and Air Conditioning, Electrical Work, for the Army National Guard Building 3468, HP and Latrine Renovations and Repairs at Camp Edwards at the Massachusetts Military Reservation, Bourne, MA. Colors shall be selected by the Government. Located in Camp Edwards, Massachusetts, for the Contract sum of:
Dollars $________________________
B. This sub-bid includes addenda numbered _______________________________.
C. This sub-bid
May be used by any general bidder except: _______________________
May only be used by the following general bidders: ________________
(To exclude general bidders, insert “X” in one box only and fill in blank following that box. Do not answer C if no general bidders are excluded.)
Name of Sub – Bidder ________________________________________________________
D. The undersigned agrees that, if he is selected as a sub-bidder, he will, within 5 (five) days, Saturdays, Sundays, and legal holidays excluded, after presentation of a subcontract by the general bidder selected as the general contractor, execute with such general bidder a subcontract in accordance with the terms of this sub-bid, and contingent upon the execution of the general contract, and, if requested so to do in the general bid by such general bidder, who shall pay the premiums therefore, or if prequalification is required pursuant to section 44D3/4, furnish a performance and payment bond of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the awarding authority in the full sum of the subcontract price.
E. The names of all persons, firms and corporations furnishing to the undersigned labor or labor and materials for the class or classes or part thereof of work for which the provisions of the section of the specifications for this sub-trade require a listing in this paragraph, including the undersigned if customarily furnished by persons on his own payroll and in the absence of a contrary provision in the specifications, the name of each such class of work or part thereto and the bid price for such class of work or part thereof are:
NAME
CLASS OF WORK
BID PRICE
(Do not give bid price for any class or part thereof furnished by undersigned).
F. The undersigned agrees that the above list of bids to the undersigned represents bona fide bids based on the herein before described Plans, Specifications and addenda and that, if the undersigned is awarded the contract, they will be used for the work indicated at the amounts stated, if satisfactory to the awarding authority.
G. The undersigned further agrees to be bound to the general Contractor by the terms of the herein before describe plans, specifications, including all general conditions stated therein, and addenda, and to assume toward him all the obligations and responsibilities that he, by those documents, assumes toward the owner.
H. The undersigned offers the following information as evidence of his qualifications to perform the work as bid upon according to all the requirements of the plans and specifications:
1. Have been in business under present business name ________ years.
2. Ever failed to complete any work awarded? ___________________.
3. List one or more recent buildings with names of the general contractor and Architect (Designer) on which you served as a subcontractor for work of similar character as required for the above named building.
Building
Architect
General Contractor Amount of
(Designer)
Contract
(a) _____________________ ___________________ _______________ ___________
(b) _____________________ ___________________ _______________ ___________
(c) _____________________ ___________________ _______________ ___________
4. Bank reference __________________________________________________.
I. The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time of the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards of subcontracts subject to section 44F (forty-four F) of Chapter 149 of the General Laws The undersigned further certifies under penalties of perjury that his sub-bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the work “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.
The undersigned further certifies under penalties of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.
Date: ______________________________
(Name of Sub-Bidder)
By: _______________________________
(Title and Name of Person Signing)
(Business Street Address)
(Business City, State, Zip)
(Business Telephone No.)
(Business email)
Page 1 of 3 Commonwealth Of Massachusetts Military Division Form for Sub-Bid for USPFO Loading Dock MILIFBPN002598707700
File details come from the government source that posted it. Updated .