Sebastian Municipal Airport Barrier Netting
Solicitation number
25-04-RFP
Issued by
Indian River County, Florida

About this file

This document is an Addendum No. 1 issued by the Sebastian Finance Department's Procurement Division for the 25-04-RFP Sebastian Municipal Airport Netting Replacement project. The addendum, dated November 20, 2024, provides clarifications and revisions to the original Request for Proposal, specifically addressing questions about the project's requirements. Key modifications include adding two new scope of work items: providing a pole design standard and describing the installation method using best practices. The addendum confirms that no engineered drawings or permits are required for this netting replacement project.

The document does not provide specific pricing details or funding information. It is primarily an administrative document that allows potential contractors to understand the updated project specifications. The addendum includes a section for contractors to acknowledge receipt of the changes, which must be completed and returned with the solicitation submittal. No other substantive changes were made to the original bid terms, conditions, and specifications, indicating that the core project requirements remain consistent with the initial Request for Proposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Finance Department

Procurement Division

1225 Main Street

Sebastian, FL 32958

(772) 388-8231

25-04-RFP – Addendum 1 Page 1 of 2

ADDENDUM NO. 1

November 20, 2024

25-04-RFP, Sebastian Municipal Airport Netting Replacement

The original Request for Proposal shall remain in full force and effect, except as modified herein, which shall take precedence over any contrary provisions in the prior documents.

SECTION I: CLARIFICATIONS

• N/A

SECTION II: QUESTIONS

1. Question 1: Did the previous net installation have engineered drawings?

Answer: No

2. Question 2: Are engineered drawings required?

3. Question 2: Are Permits Required:

SECTION III: REVISIONS TO THE SCOPE OF WORK

• Section 6.8.5 has been revised to add the following:

6.8.5.6 Provide pole design standard.

6.8.5.7 Describe the installation method. Best installation practices should be used.

SECTION IV: ATTACHMENTS

• N/A

Sincerely, Jessica Graham, CPPB

Procurement/Contracts Manager

Finance Department

Procurement Division

1225 Main Street

Sebastian, FL 32958

(772) 388-8231

25-04-RFP – Addendum 1 Page 2 of 2

Acknowledgment of Addendum No. 1 by Contractor

The Respondent hereby acknowledges receipt of the following Addendum:

This addendum shall be completed and signed by an authorized representative and returned with the solicitation submittal. The Acknowledgment of the addendum receipt will become an integral part of the solicitation document. Acknowledging receipt of this Addendum, the undersigned understands and accepts the foregoing solicitation changes and clarifications.

All other bid terms, conditions, and specifications as originally issued remain unchanged

Printed Name Signature

Title Date

2024-11-20T08:21:14-0500
Jessica Graham

File details come from the government source that posted it. Updated .