This document contains an experience information sheet template and details of a related federal contract opportunity for design-build improvements to a walking path. The experience information sheet template requests information on four past projects including contractor details, contract numbers, work performed as prime or subcontractor, government customers, descriptions of scope and roles, performance periods, completion dates, and pricing details. The related federal contract opportunity is a 100% SDVOSB set-aside to provide labor, tools, and materials to demolish and replace an existing walking path to meet ADA accessibility guidelines. Interested vendors must attend a site visit on January 4th, submit questions by January 9th, and submit phase one proposals by January 20th for the work being done at the West Palm Beach VAMC for the Department of Veterans Affairs.

View the file

Other files

File Type Posted
36C24823R0057 0002 with Attachments.pdf PDF
36C24823R0057 0001.pdf PDF
P1 Sign In Sheet.pdf PDF
C03 RFP 36C24823R0057_1.pdf PDF
Reference Standards 014219.pdf PDF
Combatting COVID 19.pdf PDF
Project Schedule 013216.15.pdf PDF
General Requirements 010000.pdf PDF
Project Price Breakdown.xlsx XLSX spreadsheet
LOS Certification.pdf PDF
Appendix B PG18 15 Vol C.pdf PDF
WD FL20220220 09.30.2022.pdf PDF
Network Analysis Sched 013216.16.pdf PDF
VA Info and Info System Security.pdf PDF
Shop Dwgs and Product Data 013323.pdf PDF
Appendix A Concept Drawings.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPERIENCE INFORMATION SHEET

36C24823R0057

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1 Must have a total of four (4) projects, more than 4 will not be evaluated; less than 4 may result in a lower rating.

a. Contractor Information of Awarded Contract (Firm Name, Address, DUNS Number, Phone number, POC Name, POC e‐mail, Company e‐mail)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor or Subcontractor

e. Percent (%) of project work performed by your company.

f. If you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation page for additional information, if necessary.

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during project performance; steps taken toward resolution

j. Describe differing site condition(s) occurrence(s) and how each were resolved.

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy)

Contract start date (mm/dd/yyyy): Original completion date (mm/dd/yyyy):

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

m. Attesting the example project is 100% complete? YES [ ]

n. The Offerors shall indicate if any of the example project provided was terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences:

PROJECT NO. [ ] Page 4

CONTINUATION PAGE: