36C24823R0057 0002 with Attachments.pdf

PDF 32 MB Posted

Attached to
FY 23: NRM-TIER 1 (PROJ: 548-22-152) DB IMPROVE WALKING PATH
Solicitation number
36C24823R0057_1
Issued by

About this file

This solicitation is for a design-build project to improve the walking path at the West Palm Beach VA Medical Center campus. The contractor shall provide all labor, materials, and tools necessary to demolish and replace the existing walking path to meet ADA and VA accessibility guidelines for installation of lighting and miscellaneous concrete repairs within the work area. A site visit is scheduled for January 4, 2023 at 0830 and requests for information are due January 9, 2023 at 1400. Phase 1 proposals are due January 20, 2023 at 1400. This is a 100% set-aside opportunity for Service-Disabled Veteran-Owned Small Businesses. The project is located at the West Palm Beach VAMC campus and is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8.

View the file

Other files

File Type Posted
36C24823R0057 0001.pdf PDF
P1 Sign In Sheet.pdf PDF
C03 RFP 36C24823R0057_1.pdf PDF
Reference Standards 014219.pdf PDF
Experience Information Sheet.pdf PDF
Combatting COVID 19.pdf PDF
Project Schedule 013216.15.pdf PDF
General Requirements 010000.pdf PDF
Project Price Breakdown.xlsx XLSX spreadsheet
LOS Certification.pdf PDF
Appendix B PG18 15 Vol C.pdf PDF
WD FL20220220 09.30.2022.pdf PDF
Network Analysis Sched 013216.16.pdf PDF
VA Info and Info System Security.pdf PDF
Shop Dwgs and Product Data 013323.pdf PDF
Appendix A Concept Drawings.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 1

01-19-2023

548-22-152

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8)

8875 Hidden River Pkwy Suite 525 Tampa FL 33637

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8)

8875 Hidden River Pkwy Tampa FL 33637

To all Offerors/Bidders

36C24823R0057

X

X X

01-27-2023 at 12:00 PM

See CONTINUATION Page

X 1

This amendment provides the Phase 1 RFI responses. The Phase 1 proposal due date is now 01-27-2023 at 12:00 PM EST.

Attached are the following:

1. RFI responses

2. Appendix A Markups

3. Topo Survey

Stacy Figlinski Contracting Officer

Phase 1 Requests for Information DB Improve Walking Path 548-22-152 36C24823R0057

1. The solicitation notes three (3) design submissions (65%, 95%, and 100%). In today's market we would recommend a minimum project duration for the construction portion of the project to be a minimum of 365 days after the approval of the 100% for construction documents. Please review the period of performance noted, 200 days after NTP.

a. Contractor to propose timeline as part of the bid proposal

2. The Scope of Work notes that the walkway lighting shall be flush mounted within the walkway slabs. Please clarify the following questions related to the walkway lighting:

(a) Would it be acceptable to install bollard type walkway lighting in lieu of flush mounted walkway lights?

Bollard type lights are are not acceptable per the VA guidelines

(b) Please provide a site plan which shows the location of the various electrical rooms around the site that we can use for designing the power distribution system for the walkway lights.

(c) Please advise if solar powered walkway lighting would be acceptable.

The A/E can propose this in design but should bid on non solar lighting per the package

(d) Please advise if the lighting levels for the walkway lighting need to meet the minimum ADA requirements.

Lighting levels should meet all ADA guidelines

(e) Please advise on what type of lighting control system is required for the walkway lights, i.e., photocells and/or timeclocks with lighting contractors.

Lighting controls should at a minimum be photocells with timeclock backups but will depend on the design.

(f) If the walkway lighting is required to be installed within the walkways as noted, please advise if there is a minimum spacing required or minimum lighting level.

Meet ADA requirements

3. The conceptual plan for the walkways notes all the walkways are to be replaced and/or extended as shown. The statement of work notes a total of 6,828 LF of walkway to be demolished (4.1.1.2.) and section 4.1.3 notes various lengths of sidewalks to be replaced which are less than 6 ft wide. Please clarify the following questions:

(a) Do we include replacing all of the sidewalks per the conceptual plan or do we follow the statement of work?

The contractor will be responsible for “ALL” of the sidewalk per the conceptual plans. Within this scope of work the walking path sidewalks are different from the non walking path sidewalks please see the mark-up of Appendix A.

(b) If we follow the statement of work and only replace the sections which are less than 6 ft wide, do we still install the flush walkway lights in the sections which remain?

All of the sidewalk is replaced. There is a small section in front of some of the buildings that may remain hence there is no need for lighting in that area. Walking path sidewalks are the only one with lighting requirements.

4. Where the conceptual plan notes replacing the walkway to Military, it will require modifications to the existing gate supports and chain link gate. Please clarify the extent of the work associated with the perimeter fencing and the exist gate where the space is limited due to the structural supports.

The walkway will need to be modified from 6 down to the available space we have at this location due to the physical placement of the gate and supports. This is allowed.

5. Please clarify the locations for the light blue walkways on the conceptual plan.

The light blue line delineates where the new sidewalk will extent to the new wheel curb stop. It is by lot 17 and lot 10

6. Please clarify the type of retaining walls allowed for the added walkway along lot 11 (south side).

Contractor shall propose what type of retaining wall they will utilize.

7. Please provide the latest as-built drawings for the underground utilities for the site.

VA will provide latest survey dwgs. Contractor is responsible to verify all data within these documents.

8. Please provide the latest site survey which shows the site elevations and drainage structures.

VA will provide latest survey dwgs. Contractor is responsible to verify all data within these documents.

9. Please clarify if the striping/painting for the roadways/walkway crossing are required to be thermoplastic with or without glass beads.

Thermoplastic WITH glass bead

10. Is a contractor schedule required within the Phase 1 proposal submission?

CO Response: Yes, it is Factor III.

11. Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?

Yes, as long as the proper credentials are provided.

12. If no to the question above, will the SSHO need to be full-time for this project?

This is dictated by the contractor’s own safety plan that needs to be provided.

13. Is the VA hard set on the "well lights" for pathway lighting? Could be a maintenance nightmare in the future and not very practical for pathway lighting.

We will certainly look for any design guidance that can be provided if it gives us a better end product.

14. Will the VA consider pole lighting around 14'-15' tall?

No this is not an option

15. Can you please provide topographical surveys for the grounds that will receive sidewalks and include who performed the survey and the dates.

VA will provide any documentation that they have but the contractor will be responsible for verifying all data from those documents and fill in any gaps as needed

16. Can you please provide a site map that depicts where available power panels are.

This will need to be verified through the design phase

17. Can we use the existing street light power in some areas?

This will need to be verified through the design phase. If there is capacity this is ok.

18. Does the VA have a preferred utility locating company?

No

19. Does the VA allow directional boring at the facility?

Yes

20. Lead time on fixtures of any kind is undeterminable at this point in time. Could extend project deadline.

Understood

21. Is Buy American Act in full effect on this project?

Yes

22. Does the VA allow aluminum conductors for this type of project?

23. What is the minimum foot candles required by the VA on the walkway at any given point?

Per ADA requirements

24. Does the VA require software design to show foot candles?

No

25. Will a third party scheduler be necessary if the schedule requirements can be met in-house?

No

26. Will a network analysis schedule be required or will a cost loaded CPM schedule suffice?

Cost loaded CPM schedule

27. Will you need or require a bond?

CO Response: Yes, that is stated in the solicitation. A Bid Bond is also required.

28. Are you able to provide funds upfront for material delivery?

CO Response: No, we do not provide any upfront funding.

29. In parking lot 22, where the abandon fence posts are, there may not be enough land to expand to a 6 foot wide ADA approved path with room for the fire lane. For that area, are you willing and able to reduce the size of the path less than 6 foot?

There will be enough room if the abandoned posts are removed.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

C-001

Fi le

P at h

/9 /2

:5

3:

A M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Chkd ByDate:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

FOR REFERENCE ONLY

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VNRevisions: Date: GP

LOCATION PLAN IMPROVE WALKING PATH

WEST PALM BEACH VA MEDICAL CTR

10/28/2022

7305 North Military Trail West Palm Beach, FL 33410-6400 561-422-8262

WEST PALM BEACH VA MEDICAL CENTER

Date:Revisions: Date:

BEG 7-26-22

N

BEE LINE HIGHW

AY

N 53° 41'32" E 1046.16'

N

1°3

'4

" E

.5 7'

L A

K E

LAKE # 4

LAK

E

EXISTING WETLANDS

N

1°4

'2

" E

.5 7'

LAKE #3

WATER TOWER

LOT#10

L O

T #16

LOT # 17

LOT #14

LOT # 13

LOT #20

Catch Basin

LOT #12

LO

T#21

LOT#18 / 19

LOT#23

C1-

B

CORR.

RAMP

LAKE # 2

PARKING

UPPER LEVEL

PARKING

GARAGE

PARKING

PARKING

PARKING

GARAGE

20.3020

LAKE # 6

LOT # 22

LOT # 11

MAIN HOSPITAL

CLC - COMMUNITY LIVING CENTER

FISHER HOUSE4

EMERGENCY WELL (PUMP HOUSE)5

VETERAN RESOURCE CENTER6

CONTRACTING OFFICE12

WAREHOUSE13

SUBSTANCE/MENTAL HEALTH (PTSD CLINIC)14

CANCER CENTER15

MENTAL HEALTH OUT PATIENT (2500 SQFT CSI 16

BUILDING

NUMBER BUILDING

PROJECT MENTAL HEALTH/HOMELESS PROGRAM)

BUILDING

NUMBER BUILDING

PET/CT ADDITION18

HOSPICE19

MAINTENANCE BUILDING20

MRI BUILDING21

DOMICILIARY22

DECON (IN TUNNEL)17

BUILDING

NUMBER BUILDING

8 MCCR (WOODBINE - LEASE NOT ON THIS MAP)

M/C STORAGE

VBA/VSO BLDG.

TRANSPORTATION TRAILER11

INSPECTOR GENERAL TRAILER7

BUILDING

NUMBER BUILDING

0 64' 128' 192' 256' 320'32'

16' 48'

LEGEND

SYMBOL DISCRIPTION

NEW FITNESS STATION

ARM GATE

PEDESTRIAN CROSSING LIGHT

ABANDONED FENCE POSTS

NEW BENCH

REPLACE BENCH

BUS STOP

REPLACE EXISTING WITH 6' SIDEWALK

EXTENDED SIDEWALK TO NEW CURB-WHEEL STOP

NEW 6' SIDEWALK

SIDEWALK REMOVAL

NEW COMBINATION CURB-WHEEL STOP

44444444444444

548-22-152

AutoCAD SHX Text

BLUE HERON BLVD.

AutoCAD SHX Text

MILITARY TRAIL

AutoCAD SHX Text

ASPHALT ROAD

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text Open to below

AutoCAD SHX Text Open to below

AutoCAD SHX Text Open to below

AutoCAD SHX Text Open to below

AutoCAD SHX Text Planter

AutoCAD SHX Text Planter

AutoCAD SHX Text Plant.

AutoCAD SHX Text Drop-off

AutoCAD SHX Text Plant.

AutoCAD SHX Text Planter

AutoCAD SHX Text

7" OAK

AutoCAD SHX Text

7" OAK

AutoCAD SHX Text

12" PALM

AutoCAD SHX Text

10" PALM

AutoCAD SHX Text

10" PALM

AutoCAD SHX Text

12" PALM

AutoCAD SHX Text

12" PALM

AutoCAD SHX Text

12" PALM

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

6" OAK

AutoCAD SHX Text

6" OAK

AutoCAD SHX Text

6" OAK

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text 548-09-124

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

ELEV.

viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect

CLOUDED PORTIONS ARE CONSIDERED SIDEWALKS - NON WALKING PATH

viviana.nazario Engineer REMAINING SIDEWALKS (NOT CLOUDED) ARE PART OF WHAT THE VA CALLS THE WALKING PATH.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

C-002

Fi le

P at h

/9 /2

:5

3:

A M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VNDate:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

FOR REFERENCE ONLY

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GPRevisions: Date:

STANDARD DETAILS IMPROVE WALKING PATH

WEST PALM BEACH VA MEDICAL CTR

10/28/2022

7305 North Military Trail West Palm Beach, FL 33410-6400 561-422-8262

WEST PALM BEACH VA MEDICAL CENTER

Date:Revisions: Date:

GP 10-28-22

CONCEPT 548-22-152

AutoCAD SHX Text [1981mm]

AutoCAD SHX Text [1219mm]

AutoCAD SHX Text [1829mm]

AutoCAD SHX Text [1829mm]

AutoCAD SHX Text

CONCRETE WALK

AutoCAD SHX Text

CURB & GUTTER

AutoCAD SHX Text

EXPANSION JOINT

AutoCAD SHX Text

RAMP FLUSH WITH GUTTER

AutoCAD SHX Text

EXPANSION JOINT

AutoCAD SHX Text

CURB & GUTTER

AutoCAD SHX Text [102mm]

AutoCAD SHX Text

CONCRETE WALK

AutoCAD SHX Text

SECTION A

AutoCAD SHX Text

1:12 MAX. SLOPE

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

CURB RAMP

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

1:12 MAX.

AutoCAD SHX Text

1:12 MAX.

AutoCAD SHX Text [1829mm]

AutoCAD SHX Text [1219mm]

AutoCAD SHX Text [1829mm]

AutoCAD SHX Text

1:12 MAX.

AutoCAD SHX Text

1:12 MAX.

AutoCAD SHX Text

CONCRETE WALK

AutoCAD SHX Text

VARIES

AutoCAD SHX Text 2'-6" [760mm]

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

LIMITS OF RAMP

AutoCAD SHX Text

CROSS SLOPE

AutoCAD SHX Text

(1%. (TYP.))

AutoCAD SHX Text

AutoCAD SHX Text

MAXIMUM SLOPE = 2%

AutoCAD SHX Text

AutoCAD SHX Text

VARIES

AutoCAD SHX Text 2'-6" [760mm]

AutoCAD SHX Text 2'-6" [760mm]

AutoCAD SHX Text 4' [1.2m]

AutoCAD SHX Text

ROADWAY WIDTH

AutoCAD SHX Text

VARIES

AutoCAD SHX Text NOTE: 1. TOP OF CURB (TC) AND TOP OF CURB (TC) AND TOP OF RAMP ELEVATIONS SHOWN ARE IN RELATION TO THE GUTTER AND ARE LOCATED RADIALLY. GUTTER = 0" 2. SEE STANDARD VA DETAIL SEE STANDARD VA DETAIL 32 05 23-18 "CONCRETE SIDEWALK" FOR JOINT REQUIREMENTS. 3. WHEN CURB HEIGHTS OF WHEN CURB HEIGHTS OF GREATER THAN 7" [180mm] ARE SHOWN ON PLANS, SEE PLANS AND ADA REQUIREMENTS. 4. REFER TO SHEET 3 OF 5 REFER TO SHEET 3 OF 5 FOR RAMP SURFACE FINISH.

AutoCAD SHX Text TYPE 2 CURB, H=6" [150mm] PER STANDARD VA DETAIL 32 05 23-17 "CONCRETE VERTICLE CURB AND TERMINAL SECTION" OR BARRICADE RAILING PER STANDARD VA DETAIL 32 05 23-04 "CONCRETE POST BARRICADE" REQUIRED ONLY WHEN NOTED ON PLANS IN ORDER TO RESTRICT VEHICULAR TRAFFIC.

AutoCAD SHX Text 6'-6" [2m] SIDEWALK RAMP WIDTH

AutoCAD SHX Text SIDEWALK WIDTH PER PLANS 4' MIN. [1.2m]

AutoCAD SHX Text

VARIES

AutoCAD SHX Text 2'-6" [760mm]

AutoCAD SHX Text TC=1/2" [13mm]

AutoCAD SHX Text TC=7" [760mm]

AutoCAD SHX Text TOP OF RAMP=3" [75mm]

AutoCAD SHX Text TRANSITION TO MATCH EXIST. CURB AND GUTTER AND SIDEWALK. EXISTING DIMENSIONS MAY VARY SEE PLANS

AutoCAD SHX Text

SIDEWALK RAMP CONTROL POINT SEE PLANS

AutoCAD SHX Text TOP OF RAMP=3 1/2" [90mm]

AutoCAD SHX Text TOP OF RAMP=3" [75mm]

AutoCAD SHX Text

RADIUS PER PLANS

AutoCAD SHX Text TOP OF RAMP= 7 5/8" [195mm]

AutoCAD SHX Text

PER PLANS

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

ROADWAY WIDTH

AutoCAD SHX Text

CURB AND GUTTER

AutoCAD SHX Text TC=7" [760mm]

AutoCAD SHX Text TC=1/2" [13mm]

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

TRUNCATED DOMES DETECTABLE WARNING STRIP

AutoCAD SHX Text 2' [609mm]

AutoCAD SHX Text

TRUNCATED DOMES DETECTABLE WARNING STRIP

AutoCAD SHX Text

TRUNCATED DOMES DETECTABLE WARNING STRIP

AutoCAD SHX Text

CURB ACESS RAMP - LIMITED RIGHT-OF-WAY

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

SECTION A-A

AutoCAD SHX Text

ELEVATION DEPRESSED CURBE AT SIDEWALK RAMP

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text 2' [609mm]

AutoCAD SHX Text

12:1 (MAX)

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

CURB ACCESS RAMP ALTERNATIVES

AutoCAD SHX Text

1:50 (MAX)

AutoCAD SHX Text

TRUNCATED DOMES DETECTIBLE WARNING STRIP

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text

12:1 (MAX)

AutoCAD SHX Text

1:50 (MAX)

AutoCAD SHX Text

TRUNCATED DOMES DETECTIBLE WARNING STRIP

AutoCAD SHX Text

CHORD

AutoCAD SHX Text NOTE: REFER TO VA STANDARD DETAIL 32 05 23-20 "TRUNCATED DOME TACTILE - WARNING STRIP" FOR ADDITIONAL INFORMATION.

AutoCAD SHX Text [1219mm]

AutoCAD SHX Text [1219mm]

AutoCAD SHX Text [1524mm]

AutoCAD SHX Text [455mm]

AutoCAD SHX Text [455mm]

AutoCAD SHX Text [455mm]

AutoCAD SHX Text [1524mm]

AutoCAD SHX Text

LOCATE CURB ACCESS RAMP TO ALIGN WITH CROSSWALK

AutoCAD SHX Text

12:1 (MAX.)

AutoCAD SHX Text

CROSSWALK

AutoCAD SHX Text

CROSSWALK

AutoCAD SHX Text

TRUNCATED DOMES DETECTIBLE WARNING STRIP

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text 2' [609mm]

AutoCAD SHX Text

12:1 (MAX)

AutoCAD SHX Text

CURB ACCESS RAMP ALTERNATIVES

AutoCAD SHX Text

1:50 (MAX)

AutoCAD SHX Text

TRUNCATED DOMES DETECTIBLE WARNING STRIP

AutoCAD SHX Text [1219mm]

AutoCAD SHX Text [455mm]

AutoCAD SHX Text [1524mm]

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text 2' [609mm]

AutoCAD SHX Text [1829mm] OR PER PLAN

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text NOTES: 1. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB OR OTHER ADJACENT STRUCTURES. 2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT LOCATIONS AND SHALL EXTEND THE FULL DEPTH OF THE CONCRETE. 3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' [4572mm] OR AT A SPACING THAT MATCHES THE ADJACENT CURB. 4. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS. 5. SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH OF SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB. 6. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH A FINE BRUSH IN A TRANSVERSE DIRECTION. 7. 1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' [1829mm] OR EQUAL TO SIDEWALK WIDTH.1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' [1829mm] OR EQUAL TO SIDEWALK WIDTH.

AutoCAD SHX Text 1" [25mm] SCORED OR SAWCUT CONTRACTION JOINT.

AutoCAD SHX Text

TOP OF CURB

AutoCAD SHX Text 1/4" [6mm] DEEP SCORED JOINTS

AutoCAD SHX Text 1/4" [6mm] R. (TYP.) FORMED JOINTS ONLY

AutoCAD SHX Text

CLASS "B" CONCRETE

AutoCAD SHX Text EXPANSION JOINT WITH 1/4" [6mm] BITUMINOUS JOINT FILLER

AutoCAD SHX Text

1% MIN. 2% MAX.

AutoCAD SHX Text

1% MIN. 2% MAX.

AutoCAD SHX Text [152mm]

AutoCAD SHX Text 10.5' MAX. [3200mm]

AutoCAD SHX Text

TYPICAL SECTION

AutoCAD SHX Text

EXPANSION AND SCORED JOINT DETAIL

AutoCAD SHX Text [5mm]

AutoCAD SHX Text [102mm]

AutoCAD SHX Text [18288mm] EXPANSION JOINT TO EXPANSION JOINT

AutoCAD SHX Text [18288mm] EXPANSION JOINT TO EXPANSION JOINT

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

PLANS

AutoCAD SHX Text

PLANS

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

TRUNCATED DOME TACTILE - WARNING STRIP

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

NOTE: FIELD LEVEL DOME COVERAGE = 41 POINTS PER SQUARE INCH

AutoCAD SHX Text INTERNAL EMBEDMENT FLANGE @ 3" [76mm] C/C (SEE PLAN FOR ORIENTATION)

AutoCAD SHX Text 90° POINTS0.045" [1mm] HIGH

AutoCAD SHX Text

INTERNAL EMBEDMENT FLANGE @ 3" [76MM] C/C (SEE PLAN FOR ORIENTATION)

AutoCAD SHX Text

0.625" HOLE THROUGH EMBEDMENTFLANGES (3 PER FLANGE) AS SHOWN ON REFLECTED PLAN

AutoCAD SHX Text 0.625"[16mm] HOLE THROUGH EMBEDMENT FLANGES (3 PER FLANGE)

AutoCAD SHX Text

INTERNAL EMBEDMENT FLANGE 7 PER TILE

AutoCAD SHX Text 0.1875" x0.0625"DEEP [5mm x1mm]DOME UNDERSIDE OF TILE

AutoCAD SHX Text

SECTION B-B

AutoCAD SHX Text

SECTION A-A

AutoCAD SHX Text

DETAIL

AutoCAD SHX Text

PLAN - TILE

AutoCAD SHX Text

REFLECTED PLAN - TILE

AutoCAD SHX Text [79mm]

AutoCAD SHX Text [76mm]

AutoCAD SHX Text [5mm]

AutoCAD SHX Text [79mm]

AutoCAD SHX Text [5mm]

AutoCAD SHX Text [5mm]

AutoCAD SHX Text [35mm]

AutoCAD SHX Text [5mm]

AutoCAD SHX Text [51mm]

AutoCAD SHX Text [11mm]

AutoCAD SHX Text [11mm]

AutoCAD SHX Text [32mm]

AutoCAD SHX Text [42mm]

AutoCAD SHX Text [42mm]

AutoCAD SHX Text [625mm]

AutoCAD SHX Text

TILE FILLED WITH STRUCTURAL POLYMER CONCRETE

AutoCAD SHX Text 0.625" [16mm] HOLEEMBEDMENT FLANGES AS SHOWN IN PLAN

AutoCAD SHX Text [2mm]

AutoCAD SHX Text [6mm]

AutoCAD SHX Text [10mm]

AutoCAD SHX Text 90° POINTS0.045" [1mm] HIGH

AutoCAD SHX Text [5mm]

AutoCAD SHX Text [51mm]

AutoCAD SHX Text [11mm]

AutoCAD SHX Text [11mm]

AutoCAD SHX Text [32mm]

AutoCAD SHX Text [42mm]

AutoCAD SHX Text [42mm]

AutoCAD SHX Text [625mm]

AutoCAD SHX Text [10mm]

AutoCAD SHX Text [5mm]

AutoCAD SHX Text [4mm]

AutoCAD SHX Text [35mm]

AutoCAD SHX Text [18mm]

AutoCAD SHX Text [7mm]

AutoCAD SHX Text [24mm]

AutoCAD SHX Text [60mm]

AutoCAD SHX Text [10mm]

AutoCAD SHX Text [32mm]

AutoCAD SHX Text [2mm]

AutoCAD SHX Text [23mm]

AutoCAD SHX Text [10mm]

AutoCAD SHX Text [42mm]

AutoCAD SHX Text [42mm]

AutoCAD SHX Text [2mm]

AutoCAD SHX Text [2mm]

AutoCAD SHX Text [2mm]

AutoCAD SHX Text [1mm]

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text [32mm]

AutoCAD SHX Text [32mm]

AutoCAD SHX Text [42mm] SPACING C/C

AutoCAD SHX Text [625mm]

AutoCAD SHX Text [32mm]

AutoCAD SHX Text [32mm]

AutoCAD SHX Text [42mm] SPACING C/C

AutoCAD SHX Text [625mm]

AutoCAD SHX Text

SEE DETAIL RIGHT

AutoCAD SHX Text [79mm]

AutoCAD SHX Text [79mm]

AutoCAD SHX Text [76mm] SPACING C/C

AutoCAD SHX Text [625mm]

AutoCAD SHX Text [5mm]

AutoCAD SHX Text [32mm]

AutoCAD SHX Text [203mm]

AutoCAD SHX Text [625mm]

AutoCAD SHX Text [203mm]

AutoCAD SHX Text [19mm]

AutoCAD SHX Text [16mm]

AutoCAD SHX Text [31mm]

AutoCAD SHX Text DETECTABLE WARNING NOTES: THE DETECTABLE WARNING STRIP MUST COVER THE ENTIRE WIDTH OF THE RAMP OPENING, EXCLUDING THE WINGS. ALL DOMES MUST BE ALIGNED IN THE DIRECTION OF TRAVEL. ONE CORNER OF THE LEADING EDGE OF THE DETECTABLE WARNING MAY BE MORE THAN 5 FEET FROM THE BACK OF THE CURB. WHEN LOCATED ALONG A CURB RETURN, THE LEADING EDGE OF THE DETECTABLE WARNING MAY BE DEIFNED BY THE CHORD DRAWN BETWEEN THE LEADING EDGES OF THE RAMP OPENING.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

C-003

Fi le

P at h

/9 /2

:5

3:

A M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VNDate:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

FOR REFERENCE ONLY

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GPRevisions: Date:

WEST PALM BEACH VA MEDICAL CTR

10/28/2022

7305 North Military Trail West Palm Beach, FL 33410-6400 561-422-8262

WEST PALM BEACH VA MEDICAL CENTER

Date:Revisions: Date:

GP 10-28-22

STANDARD DETAILS IMPROVE WALKING PATHCONCEPT 548-22-152

VA FURNISHED CONTRACTOR INSTALLED (VC)

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

%%UPLAN

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text

%%USECTION A

AutoCAD SHX Text

%%USECTION B

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text [2438mm]

AutoCAD SHX Text [1524mm]

AutoCAD SHX Text 20'

AutoCAD SHX Text [6096mm]

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text 4' [1219mm]

AutoCAD SHX Text [1524mm]

AutoCAD SHX Text [305mm]

AutoCAD SHX Text 3'

AutoCAD SHX Text [914mm]

AutoCAD SHX Text

TOP OF CURB

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text [152mm]

AutoCAD SHX Text

PAVEMENT

AutoCAD SHX Text

WALK FLUSH WITH CURB

AutoCAD SHX Text 1/2" [13mm] EXPANSION JOINT

AutoCAD SHX Text

AutoCAD SHX Text

COMBINATION CURB-WHEEL STOP

AutoCAD SHX Text

NTS

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

TOP OF CURB

AutoCAD SHX Text [1524mm]

AutoCAD SHX Text 4" [102mm] PAINTED DIAGONAL LINES

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text

CROSS SLOPE OF GUTTER SAME AS PAVEMENT

AutoCAD SHX Text

CURB & GUTTER

AutoCAD SHX Text [152mm]

AutoCAD SHX Text

AutoCAD SHX Text

BENCH DETAIL

AutoCAD SHX Text

NTS

AutoCAD SHX Text

NTS

NTS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

C-004

Fi le

P at h

/9 /2

:5

3:

A M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

FOR REFERENCE ONLY

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

WEST PALM BEACH VA MEDICAL CTR7305 North Military Trail West Palm Beach, FL 33410-6400 561-422-8262

WEST PALM BEACH VA MEDICAL CENTER

Date:Revisions: Date:

VC FITNESS EQUIPMENT IMPROVE WALKING PATH

VN GP10/28/2022

GP 10-28-22

CONCEPT 548-22-152

VA FURNISHED CONTRACTOR INSTALLED (VC) VA FURNISHED CONTRACTOR INSTALLED (VC)

VA FURNISHED CONTRACTOR INSTALLED (VC) VA FURNISHED CONTRACTOR INSTALLED (VC)

VA FURNISHED CONTRACTOR INSTALLED (VC)

VA FURNISHED CONTRACTOR INSTALLED (VC)

VA FURNISHED CONTRACTOR INSTALLED (VC)

AutoCAD SHX Text

AutoCAD SHX Text

SIT UP BOARD

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

MULTI BENCH

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

BACK EXTENSION

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

HORIZONTAL BAR

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

PARALLEL BAR

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

BALANCE BEAM

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

PULL UP AND DIP STATION

NTS

D

DD

D

9.

1'

21.3'

.0

9.5'

.6

19.6'

4.

5'33.3'0.

3'

54.2'0.

3'

38.0'

.9

10.4'

6.

8'

66.6'

.7

8.5'

1.

3'

2.1'

.5

202.0'

BUS

SHELTER

D

D

S

SDDDD

S

CO RDRDRDRD

RD

COCOCO

D

S S S S

HYD

GV

G V G

VD

D

C V

R

PZ

PIV

WPB

WPB

WPB

TR

AN

S

TRANS

WPB

WPB

WPB

X X X X X X

X

X

X

X

X

GT

GT

CO

CO

TOBTOB

TOB

TOE TOE

TOE

TO

E

GV

GV

W

W

W

W

W

W

W

LS W CO

CO

FM

FDC

DUMPSTER

PAD

C O

C O

B U

S

BUS

BU

S

TOB

TOB

TO

B

TOB

TO

B

TO

B

TOB

TO

B

TO

B

TO

B

TO

B

TO

B

TO

B

TO

B

TOB

TO

B

TOB

TOB

TOB TOB

TOB TOB

TOB TOB TOB TOB TOB TOB

TOB TOB TOB TOB TOB TOB

TOE TOE TOE TOE TOE TOE TOETOE TOE TOE TOE TOE TOE TOE

YD

YD

YD

YD

D

D

D

D

D

D

D

YD

YDYD

YD YD YD

YDYD

YDYD

YD

HR

H R

HR

HR

HR

H R

H R

HR

HR

Gate

Gate

Gat e

Gate

Gate

Gate

DDCV

GV

H

YD

H

YD

GV

GV

ICV

GV

WM

ICV

GV

GV

HY

D

RP

Z

HYD

GV

ICV

ICV

WV

GV

GV

GV

GV

IC

V IC

VIC

V

HYD GV

GV

DDCV

HYD

GV

FDC

FDC

GV

GV

IC

VIC

V

FD

C

FD

C

HY

D

GV

W

W

W

WPB

WPB

WPB

WPB

ECB

WPB

WPB

WPBWPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

GATE

GATE

YD

YD

Building B-10

Building B-12

Building B-7

Building B-3

Building B-4

Pa rk ing G ar ag e

Parking Garage

Building B-1

G

AT

E

RP

Z

Building B-22

Building B-13

Building B-14

W

W

W

W W

W

WW

D

W W

W

W

D

D

D

D

D

W

W

W

W

W

W

W

W

PROPANE GAS

BE

BE

BE

BE

BE

BE

BE

BE

BEBEBE

UNK

BE

BE

BEBE

BE

IR

R

IRR

D

D

BE

IRR

BE

BE

D

D

D

D D

D

D

D

D

D

D

D

D D D D

D

D

D

D

D D D D D D D D

D

D

D

D

D

D D

D

D D

Unknown

Unknown

Unknown Unknown

Unknown

Unknown

Unknown

Unknown Unknown

Unknown

Unknown

Unknown

Unknown

Unknown

Unknown

Unknown

CAN

OPY

C

OVE

R

ALUMINUM TRAILOR WITH ALUMINUM HANDI-CAP RAMP & STEPS

CALL BOX

CALL BOX

CALL BOX

CS cs cs

CONTROL BOXS

WPB

WPB

WPB

WPB WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

TRANS

WPB

WPB

WPB

XXXXXXXX

X

X

X

X

X

XXXXXXXXXXXXXXXXX

X

X

X

X

X

X

X

GATE

CONTROL BOXS

GATE

GATE

CONTROL BOXS

CONTROL BOXS

HYD

GV

HYD

GV

FDC

HYD

G

VGV

KEY PAD

KEY PAD

KEY PAD

KEY PAD

WATER PUMP

WATER PUMP

SI

G

N SIGN

SI

GN

SI

GN

METAL STEPS

YD

DIESEL TANK

DIESEL TANK

4" H.D.P.E.

TOP EL. 11.27

D

D

D

D

D

D

BE

BEBEBE

BEBE

D

BE

D D D

BE

BE

D

D

BEBE

BE

BE

W

BE BE

BE

D

CALL BOX

VAULT

KEY PAD

D

FO

FOFOFO

FO

FO

FO

FO

FO

FO FO

FO

FO

FO

D

D

S

A PORTION OF THE VETERANS ADMINISTRATION HOSPITAL IN RIVIERA BEACH, FLORIDA.

LYING IN THE SOUTHWEST 1/4 OF SECTION 25, TOWNSHIP 42 SOUTH, RANGE 42 EAST.

FOR THE FIRM

FLORIDA CERTIFICATION No. 4817

GARY P. WILLIAMS, R.L.S.

F.R.S. AND ASSOCIATES, INC.

WE HEREBY STATE THAT THE MAP OF SURVEY SHOWN HEREON IS A TRUE AND

CORRECT REPRESENTATION OF THE NEWLY CONSTRUCTED FEATURES, MADE UNDER

OUR DIRECTION, AND IS ACCURATE TO THE BEST OF OUR KNOWLEDGE AND BELIEF.

THE UNDERSIGNED HEREBY CERTIFIES THAT THIS SURVEY CONFORMS TO THE

STANDARDS OF PRACTICE AS OUTLINED IN CHAPTER 5J-17, F.A.C. AS THEY PERTAIN

TO A "TOPOGRAPHICAL SURVEY" ADOPTED BY THE FLORIDA BOARD OF

PROFESSIONAL SURVEYORS & MAPPERS, PURSUANT TO SECTION 472.027, FLORIDA

STATUTES. NOT VALID UNLESS SEALED WITH SURVEYOR'S EMBOSSED SEAL AND

SIGNATURE.

LA

N

D S

U R

VE

YO

R S

AN

D

L

AN

D P

LA

N

N

ER

S

T. C. MULLIN

SHEET:

JOB NUMBER:

APPROVED BY:

G. P. WILLIAMS

FIELD BOOK/PAGES

GPS COLLECTED

DRAWN BY:

SCALE:

1" = 80'

DATE:

07/06/2022

R E V

IS

IO

N S

B Y

D A T E

C

ER

TI

FI

C

AT

E O

F

AU

TH

O

R

IZ

AT

IO

N N

O . L

B

PH

O

N E

(5

) 4

-7

V

IS

TA

P

AR

KW

AY

, S

U

IT

E

W

ES

T

PA

LM

B

EA

C

H , F

LO

R

ID

A

W eb

S ite

: w w w .fr ss ur ve y.

co m

N O

R T

H

1. BEARINGS SHOWN HEREON REFER TO S 00° 45' 23" E ALONG THE EAST

SECTION LINE OF SECTION 31, TOWNSHIP 34 SOUTH, RANGE 36 EAST, STATE

PLANE GRID SYSTEM. ALL OTHER BEARINGS ARE RELATIVE THERETO.

2. ALL DISTANCES AND BEARINGS SHOWN HEREON ARE GRID DISTANCES AND

GRID BEARINGS AND ARE SHOWN IN U.S. SURVEY FEET.

3. THE LANDS SHOWN HEREON WERE NOT ABSTRACTED BY THIS FIRM FOR

RIGHTS-OF-WAY, EASEMENTS, OWNERSHIP, OR OTHER INSTRUMENTS OF

RECORD THAT MAY AFFECT THE SUBJECT SITE.

4. ALL UNDERGROUND UTILITIES WERE LOCATED BY BLOOD HOUND

UNDERGROUND UTILITY LOCATORS AND SHOWN ON SURVEY.

5. ELEVATIONS SHOWN HEREON REFER TO THE NORTH AMERICAN VERTICAL

DATUM OF 1988 (N.A.V.D. '88).

6. COORDINATES SHOWN HEREON REFER TO THE STATE PLANE COORDINATE

SYSTEM 1983 DATUM WITH THE 2011 ADJUSTMENT FOR FLORIDA EAST ZONE.

7. HORIZONTAL AND VERTICAL CONTROL USED: NATIONAL GEODETIC SURVEY

(NGS) MONUMENTS "E-535" NORTHING = 763,507.27, EASTING = 673,808.63,

ELEVATION = 6.739; "FLGPS65" NORTHING = 763,067.69, EASTING = 661,808.81,

ELEVATION = 5.967.

8. THIS SURVEY WAS PERFORMED UTILIZING TRIMBLE REAL TIME KINEMATIC

GPS (RTK GPS) SURVEY EQUIPMENT FOR THE HORIZONTAL AND VERTICAL

INFORMATION SHOWN HEREON.

SHEET 3 OF 11SHEET 2 OF 11

SHEET 4 OF 11

SHEET 5 OF 11 SHEET 6 OF 11

SHEET 8 OF 11

SHEET 7 OF 11

SHEET 9 OF 11

SHEET 10 OF 11 T.

C

.M

/0

2/

AD

D

ED

D R

AI

N

AG

E

R

IM

S

IN

VE

R T

EL

EV

AT

IO

N S

T.

C

.M

/0

8/

AD

D

ED

T R

EE

T

YP

E, S

IZ

E

C

AN

O

PY

D

IA

. S H

EE

TS

FDC

= BELLSOUTH TELEPHONE MANHOLE

= SIAMESE CONNECTION

= WATER SPRINKLER VALVE

= WATER GATE VALVE

= FIRE HYDRANT

= CABLE TELEVISION RISER

= CURB INLET

= CATCH BASIN

= POSTED SIGNS

= ELECTRIC BOX

= CONCRETE LIGHT POLE

= BELLSOUTH TELEPHONE RISER

= SANITARY MANHOLE

GV

S

CTV

HYD

SCV

= EXISTING DRAINAGE PIPE

= EXISTING SANITARY SEWER PIPE

= EXISTING WATER MAIN PIPE

D

S

W

= EXISTING GUARDRAIL

= EXISTING FIBOR OPTIC LINE

= EXISTING BURRIED ELECTRIC LINE

FO

BE

= EXISTING BURRIED ELECTRIC LINEIRR

= EXISTING UNKNOWN LINEUNK

= EXISTING GAS LINEGAS

= WIRE PULL BOX

= EMERGENCY CALL BOXECB

WPB

SHEET 11 OF 11 T.

C

.M

/1

6/

U

PD

AT

ED

S

U R

VE

Y

AD

D

ED

S

H

EE

TS

0, , 2 0, T.

C .M

/1 5/

AD

D

R

ES

SE

D

C O

M M

EN

TS

F R

O M

E R

N

ES

T D

AV

IS

E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:36 AM, AutoCAD PDF (High Quality Print).pc3, FRS & ASSOCIATES, INC, (561) 478-7178

TO

B

TOB

TOB

TOB

TOB

TOB

TO

B

TO

B

TO

B

TO

B

TO

B

TOB

TOB

TOB TOB

TOB

TOB

TOB

TOB

TOB

TOB

TOB TOB

TOB

TOB

TOB

TOB

TOB TOB

YD

YD

H R

H R

HR

HR

Gate

Gate

Gat e

Gate

Gate

H

YD

GV

GV

W

WPB

WPB

WPB

WPB

WPB

WPB

WPB

Building B-10

RP

Z

1616 16

17 16

12131415

14 15 16

12 13 14

15141312

19 20

W W

W W

W W

W

W W

W

W

WW

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

BE

BE

BE

BE

UNK

UNK

UNK

UNK

UNK

UNK

UNK

UNK

UNK

UNK

UNK

UNK

UNK

UNK

UNK

BEBEBEBEBEBE

BE

BE

BEBEBEBE

BE

BE

BE

BE

BE

BE

BE BE BE BE BE BE BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

UNK

UNK

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BEBEBEBE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

UNK

UNK

IR

R

IR

R

IR

R

IRR

IRR

IRR

IRR

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

IRR

IRR

IRR

IRR

IRR

IRR

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

D

D

D

D

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

IR

R

IR

R

IR

R

IRR

16.09

11.08

12.03 13.69

16.01

16.68

.38

17.72

16.81

15.59

12.56 11.81

.19

.3711

.5913 .4514

.9815 .29

.52

.10 11

.0611 .97

.80

.30

.18

12.38

11.65

10.91

.23

.14

.17

.21

.21

.01

.14

.00

.1411

.6612 .49

.45

.3911

.2612 .0213

.24

.23

.81

.75

.82

.61

.42

.42

.87

14.63

14.35

.14

.4014

.40

.77

.98

.61

.16

.86

.08

.09

.64

.33

.98

.11

.68

16.32

.43

12.10

11.53

.12

.0

.4

.32

.05

.77

.18

16.28

.57

.84

.12

.2019

.88

.25

.43

.87

.99

.51

17.91

19.86 20.12

20.22

.32

.52

.26

.76

.08

.15

.23

.22

16.08

16.03

15.94

15.92

15.98

.0

.1

.2

.31

.24

.15

.06

.92

.79

.78

.78

15.73

15.08

14.99

.11

.2

.47

.49

.50

.5

415.5215.47 15.41

15.67

15.52

.6

0 15 .6

.5

.5

.4

.3

.22

.1

.11

15.85

15.76

15.67

15.75

15.82

15.88

16.07

16.61 16.29

16.9116.55

16.84 17.34

17.46 17.01

17.18 17.60

16.34

16.28

.16

16.21

16.11

15.95

15.83

15.74

15.72

15.84

15.92

15.74

15.78

15.86

15.99

15.78

15.81

15.73

15.62

.17

16.62

16.79 16.38

16.35 16.73

17.12 16.91

16.96

17.15

.7

17.07

.58

16.59

17.02

17.21 17.69

17.23

17.31

17.39

17.27

17.74

16.93 17.3716.86

17.30

16.79

16.70

.06

.20

.54

17.78

17.88

.8717 .77

17.83

.80

.7

17.70 17.75

17.72

17.78

17.85

.6

.6 8 17.77

17.98

18.11

18.02

18.28

17.81

17.91

17.61

17.82

16.69

16.74

.9

.0

.6

.69

.6

.59

.08

16.60

16.70 17.20

16.86

17.02 17.52

17.6017 .1

.68

16.65

.54

16.52

16.34

.5

16.61

16.55

16.61

16.46 16 .74

16.73

.14

.62

16.11

.74

.64

16.14

.65

16.66

16.21

.7

.7

.24 16

.31

.7

.7

.28

.21

.72

.28

16.6016.68

.21

.33

16.70

.34

.62

.22

17.66

17.95

17.98 17 .99

.36

.33

17.59

17.08 17

.01

16.40

16.3916 .8416.22

.10

16.58

.96

.4

16.23

.7416.21

.29

.83

15.7816.18

15.84

.35

.98

.5916 .08

.4

616.02 16.00

.55

.84

.81

.77

.85

.93

.87

16.85

.36

.27

.30

.89

16.03

.14

.04

.90

.30

17.80

18.14

17.85 17.85

18.13

.8

.6417.62

.28

.92

.71

16.68

16.9716 .71

.16

.09

.54

.91

.70

.6816

.6

.13

.26

16.6216.62

16.65

16.63

16.55

16.60

16.22

.36

.44

20.22

19.90

.62

.69

19.55

19.64

19.83

20.02 20.11

.1

20.16

.08

.50

16.89

.88

.3617

.34

14.86

14.96

15.11

.66

17.04

16.80

16.76

.5

15.51 15.56

15.61

16.16

16.1415.74 15.73

15.07

14.99 14.94

15.30

17.30

17.75

16.50

.58

.0

16.68

16.96 16.69

13.28

11.82 11.21

14.36

D

D

D

D

D

D

D

D

D

D

D

D DD D

Unknown

D

D

D

LA

N

D S

U R

VE

YO

R S

AN

D

L

AN

D P

LA

N

N

ER

S

T. C. MULLIN

SHEET:

JOB NUMBER:

APPROVED BY:

G. P. WILLIAMS

FIELD BOOK/PAGES

GPS COLLECTED

DRAWN BY:

SCALE:

1" = 20'

DATE:

07/06/2022

R E V

IS

IO

N S

B Y

D A T E

C

ER

TI

FI

C

AT

E O

F

AU

TH

O

R

IZ

AT

IO

N N

O . L

B

PH

O

N E

(5

) 4

-7

V

IS

TA

P

AR

KW

AY

, S

U

IT

E

W

ES

T

PA

LM

B

EA

C

H , F

LO

R

ID

A

W eb

S ite

: w w w .fr ss ur ve y.

co m

N O

R T

H

FDC

= BELLSOUTH TELEPHONE MANHOLE

= SIAMESE CONNECTION

= WATER SPRINKLER VALVE

= WATER GATE VALVE

= FIRE HYDRANT

= CABLE TELEVISION RISER

= CURB INLET

= CATCH BASIN

= POSTED SIGNS

= ELECTRIC BOX

= CONCRETE LIGHT POLE

= BELLSOUTH TELEPHONE RISER

= SANITARY MANHOLE

GV

S

CTV

HYD

SCV

= EXISTING DRAINAGE PIPE

= EXISTING SANITARY SEWER PIPE

= EXISTING WATER MAIN PIPE

D

S

W

= EXISTING GUARDRAIL

= EXISTING FIBOR OPTIC LINE

= EXISTING BURRIED ELECTRIC LINE

FO

BE

= EXISTING BURRIED ELECTRIC LINEIRR

= EXISTING UNKNOWN LINEUNK

4" PVC PIPE

TOP EL. = 14.18

INVERT EL. = 13.81

4" PVC PIPE

TOP EL. = 14.17

INVERT EL. = 13.80= EXISTING GAS LINEGAS

CATCH BASIN

RIM EL. 17.26

INV. EL. 13.74 (SW)

CATCH BASIN

RIM EL. 17.17

INV. EL. 13.17 (NE)

INV. EL. 13.17 (SW)

CATCH BASIN

RIM EL. 14.02

INV. EL. 12.62 (NE)

INV. EL. 12.62 (SW)

" R

.C .P

" R

.C .P

" R

.C .P

= WIRE PULL BOX

= EMERGENCY CALL BOXECB

WPB

CATCH BASIN

RIM EL. = 15.49

INV. EL. = 7.12 (N) 48" R.C.P.

INV. EL. = 6.52 (S) 24" R.C.P.

24" R.C.P. OUTFALL

INV. EL. = 6.05

E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:46 AM, AutoCAD PDF (High Quality Print).pc3, BUS

TOB

TOB TOB TOB

TOB

TOB

TOB

TOB

TO

B

TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB

TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB

TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE

TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE

D

YD

YDYD

YD YD YD

H R

H R

HR

HR

Gate

Gate

GV

WM

ICV

GV

GV

HY

D

RP

Z

WPB

WPB

WPB

WPB

WPB

WPB

WPB Building B-7

Building B-4

13 14

17 18

14 14

W W

W

W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

W

W

W

W

W

W

W

W

W

W

W

W

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BEBE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBE

BE

BEBEBEBE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BEBE

BE

BEBE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

UNK

UNK

UNK

UNK

UNKUNK

UNK

BE

BE

IR

R

IR

R

IR

R

IRR

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

U N

K U

N

K BE

BE

BE

.59

.67

.76

.66

16.21

.1411

.6612 .49

.45

.39

.57

.28

.23

.67

.90

.85

.96

.06

.32

.73 14

.81 16 .32

.93

15.88

.07

.21

16.14

16.20

.34

.15

15.98

.86

.93

.70

.53

.8

.94

.32

.2

716.37

.54

16.5916.70

16.5616.65

16.69

16.7916.90

16.80

.75

16.78

16.75

16.03

.67

.80

16.14

16.31

.97

.11

.2

16.49 16.27

15.85

16.12 15.67

.80

16.1616 .3

.91

16.13 16.5816.27

16.37

.68

14.66

.3414.32

14.64

.64

.94 14

.94

.68

14.63

14.99

.94

.86

14.60

.66

.97

.93

.47

.88

.45

14.87

.9

.00

.05

14.97

.82

.94

15.14

.37

.50

15.23

14.99

.56

15.79

.08

.8

.8

.06

.9

.9

16.03

.3615 .9

15.60 15.41

16.28

15.88

.3715.96

15.84

.22

.34

.7115.02

.72

.6

.01

.81

.53

.81

.3914

.84

.52

.44

.40

.88

.69

.76

.53

.33

.20

.45

.81

.83

.77

.65

.46

.91

.75

.12

.41

.45

.29

14.28

.34

.58

.54

.66

.65

.16

.74

.51

.83

.67

.90

.92

.9215

.3

.53

15.84

.43 13

.95

.53

.73 14

.14

.30

.46

15.98

.82 14

.87

.44

.3014

.8315 .62

.94

.69

.17

.35

.54

.60

16.36

.21

.08

.29

16.78

.74

16.71

16.86

17.19

17.38

17.70

18.02 18 .11

.77

17.44

17.14

17.02

16.74

16.73

16.66

16.72 16.72

16.60

16.59

16.68

16.77

16.73 16.77

16.86 17.01

16.77

16.99

17.31

17.41

.57

.20

.63

.62

16.78

.84

16.90

.91

.76

.67

.78

.66

.90 16

.87

.00

.06

.25

.12

.40

.52

.58

.38

.11

19.70

.5

19.49

19.47

19.71

19.74

19.34

.83

18.23

17.64

.7919

.69

.70

.85

19.83

.65

.59

19.84

19.54

19.46

19.47

.99

.95

.9

.29

.70

18.56

.54

.5218

.46

18.51 18.52

19.03

.49

.86

.7719.80

19.77

19.41

18.93

18.93

.04

19.42

.67

.68

.69

.85

.89

19.00

19.04

.32

.4

.7

19.52

.16

18.72

.34

.1

.76

.14

.27

.93 18.04

.00

.7

.99

.26

.2

.95

.5

17.45 18.07

17.67

18.27 17.94

18.38 18.01

18.1518.52

.72

.35

18.44

.84

.06

18.65

18.51

.9

.5

.91

.60

18.47

18.3018.72 18.61

18.25 18.21

18.26

.08

18.39

.38

.02

.8614

.6

11.94

11.59 11.56

.6

.91

.61

14.41 14.38

11.60

.49

11.05

.93

.15

.37

.45

.51

18.83

18.37

18.62

.71

18.9218.97

18.97

19.04

18.90 18.86

18.93 19.08

19.26

19.21

19.34

18.73

.97

18.75

18.71

18.58 18.58

18.46 18.34

18.07 18.19

19.37

20.67

.36

22.3621.12

21.83

22.11

.27

.30

.57

.4819

.80

.23

.67

.17

.05

.37

.42

.68

.8115

.14

.36

.94

.0714

.76

.72

.74

.47

.28

.0814 .96

.94

.09

.44

.47

.19

.17 15

.7815 .05

.31

.55

.36

.23

.06

.13

.06

.02

.93

.03

.55

.64

.01

.73

.74

.07

.60

.12

.69

.98

.23

.81

.75

.82

.79

.61

.42

.42

.87

.24

.0

11.33

11.2211.56

12.72

.79

.05

.65

.34

.81

18.62

.20

20.11

.95

.18

.09

.88

.25

.43

.87

.16

.42

.99

.77

.43

.28

.68

.51

17.91

19.86 20.12

20.22

.32

.52

.26

19.26

.95

.90 17

.65 17 .11

.01

.58

.11

19.06

.46

.40

.04

.07

.61

.7

.6416

.38

.22

.87

.71

.76

.92

.79

.72

.84

.91

.0

.64

.50

.22

.12

.9615

.9715 .9415

.72

.62

.39

.21

15.67

.21

15.23

.1

.25

15.52

.63

15.72

.83

15.89 15.86

.85

.9

15.90 15.98

.16

.28

.39

.62

.78

.78

15.73

15.08

.1

.11

15.13

15.23

.22

15.67

.7

.96

.94 16.53

.74

16.72

16.72

.78

.26

.24

.11

.16

.44

.50

.35

.18 16

.16

.13

.06

.00

.71

.45 15

.29

.56

.86

.20

.26

.39

.22

.89

.57

.96

.58

.30

.93

.91

.92

.83

.78

.76

.66

.78

.86

.99

.07

.2016

.2216 .36

.39

.49

.51

.48

.39

.37

.26

.51

.44

.39

.26 16.20 16

.02

.8

.79

15.73

15.78

.79

.86

.92

.96 16

.25

.23

.18

16.22

.75

.63

.20

.80

.90

.47

.97

.22

.75

.18

15.42 15.72

16.57 16.12

.78

.72

.77

16.82 16 .27

20.22

19.90

.62

.69

19.55

19.64

19.83

20.02 20.11

.1

20.21

20.19

20.16 20.24

20.30 20.30

20.23

.08

.50

16.89

.88

.8

.9

.9

.8

17.16

.64

.36

.4717

.53

.3617 .34

.1

.3

12.27

11.75

11.50 11.49

11.97

11.90

17.01

.05

.65

14.86

14.96

15.11

.66

15.08

.46

16.86

.86

16.62

.67

.53 16

.38

.30

.17

16.02

.84

.78

.87

.90

16.00

16.02

16.03

16.04

16.08

.62

.52

.45

.33

16.28

.12

18.80

18.85

18.92

15.07

14.99 14.94

15.30

17.16

19.29

17.76

17.44

17.12

16.83

.2

.24

.5

.0

17.90

.32

15.26

.92

16.24

15.78

.8914.67

14.52

14.9614.90

14.85

14.40

15.04

15.01

D D

D D

D D

D D

D D

D D

D D

D D

D

D

D

D

D

D

D

D

D

D

D DD D

Unknown

FO

FO

FO

FO

FO

FO

LA

N

D S

U R

VE

YO

R S

AN

D

L

AN

D P

LA

N

N

ER

S

T. C. MULLIN

SHEET:

JOB NUMBER:

APPROVED BY:

G. P. WILLIAMS

FIELD BOOK/PAGES

GPS COLLECTED

DRAWN BY:

SCALE:

1" = 20'

DATE:

07/06/2022

R E V

IS

IO

N S

B Y

D A T E

C

ER

TI

FI

C

AT

E O

F

AU

TH

O

R

IZ

AT

IO

N N

O . L

B

PH

O

N E

(5

) 4

-7

V

IS

TA

P

AR

KW

AY

, S

U

IT

E

W

ES

T

PA

LM

B

EA

C

H , F

LO

R

ID

A

W eb

S ite

: w w w .fr ss ur ve y.

co m

N O

R T

H

4" PVC PIPE

TOP EL. = 13.90

INVERT EL. = 13.53

4" PVC PIPE

TOP EL. = 13.81

INVERT EL. = 13.44

12" R .C

.P.

CATCH BASIN

RIM EL. 13.05

INV. EL. 7.90 (S)

CATCH BASIN

RIM EL. 14.32

INV. EL. 7.99 (N)

INV. EL. 7.99 (S)

24" R .C

.P.

" R

.C .P

CATCH BASIN

RIM EL. 16.36

INV. EL. 9.76 (NE)

INV. EL. 9.76 (SW)

18" R.C.P.

" R

.C .P

CATCH BASIN

RIM EL. 13.92

INV. EL. 9.33 (NE)

INV. EL. 9.33 (SW)

CATCH BASIN

RIM EL. 15.28

INV. EL. 8.55 (SW)

CATCH BASIN

RIM EL. 18.20

INV. EL. 10.85 (NE)

INV. EL. 13.30 (SE)

INV. EL. 10.85 (SW)

FDC

= BELLSOUTH TELEPHONE MANHOLE

= SIAMESE CONNECTION

= WATER SPRINKLER VALVE

= WATER GATE VALVE

= FIRE HYDRANT

= CABLE TELEVISION RISER

= CURB INLET

= CATCH BASIN

= POSTED SIGNS

= ELECTRIC BOX

= CONCRETE LIGHT POLE

= BELLSOUTH TELEPHONE RISER

= SANITARY MANHOLE

GV

S

CTV

HYD

SCV

= EXISTING DRAINAGE PIPE

= EXISTING SANITARY SEWER PIPE

= EXISTING WATER MAIN PIPE

D

S

W

= EXISTING GUARDRAIL

= EXISTING FIBOR OPTIC LINE

= EXISTING BURRIED ELECTRIC LINE

FO

BE

= EXISTING BURRIED ELECTRIC LINEIRR

= EXISTING UNKNOWN LINEUNK

= EXISTING GAS LINEGAS

= WIRE PULL BOX

= EMERGENCY CALL BOXECB

WPB

E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:49 AM, AutoCAD PDF (High Quality Print).pc3, TO

B

TOB

TOB

TOB

TOB

TOB

D

D

Gate

Gate

DDCV

GV

H

YD

H

YD

ICV

W

WPB

WPB

WPB

WPB

WPB

WPB

14 15 16

12 13 14

15141312

14 15

201918

13 14

15 16

19 20

W

W

W

W

W

W

W

W

W

W

W

W

W

D

D

D

D

D

D

D

W

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

UNK

UNK

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

BE

BE

BE

IR

R

IR

R

IR

R

IR

R

IRR

IRR

IRR

IRR

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

IRR

IRR

IRR

IRR

IRR

IRR

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

U N

K U

N K

U N

K

U N

K U

N K

U N

K U

N K

U N

K

UNK

UNK

D

D

D

D

D

D

D

D

D

D

D

D

D

D

BE

BE

BE

BE

BE

BE

BE

BE

BEBE

BE BE

BE

BE

BE

BE BE

BE

BE

BE

BE

BE

16.09

11.08

12.03 13.69

16.01

16.68

.38

17.72

16.32

.43

12.10

11.53

.12

.0

.4

.32

.05

.77

.18

16.28

.57

.84

.12

.06

.61

.4

.18

.93

.24

16.06

.87

.3

.54

11.02

.81

.55

.16

.47

11.06

16.61

16.9116.55

16.84 17.34

17.46 17.01

17.18 17.60

16.34

16.2816.62

16.79 16.38

16.35 16.73

17.12 16.91

16.96

17.15

.7

17.07

.58

16.59

17.02

17.21 17.69

17.23

17.31

17.39

17.27

17.74

16.93 17.3716.86

17.30

16.79

16.70

.06

.20

.54

17.78

17.88

.8717 .77

17.83

.80

.7

17.70 17.75

17.72

17.78

.6

.6 8 17.77

18.11

18.02

18.28

17.81

17.91

17.61

17.82

16.69

16.74

.9

.0

.6

.69

.6

.59

.08

16.60

16.70 17.20

16.86

17.02 17.52

17.6017 .1

.68

16.65

.54

16.52

16.34

.5

16.61

16.55

16.61

16.46 16 .74

16.73

.14

.62

16.11

.74

.64

16.14

.65

16.66

16.21

.7

.7

.24 16 .31

.7

.7

.28

.21

.72

.28

16.60

16.62

16.54

16.42

16.30

16.12

16.02

15.91

.79

16.02

16.19

16.38

16.59

16.61

16.68

.21

.33

16.70

16.39

.10

.80

.46

.46

.54

.61

.97

.06

.56

.02

.34

.62

.22

18.71

.66

.06

19.24

19.49

20.11

20.06

.4

.03

.43

17.50

17.66

17.95

17.98 17 .99

.36

.33

17.59

19.72

19.78 19.90

17.08 17 .01

17.96

.50

18.60

.08

.87

19.40

20.04

.53

.99

20.42

20.55

.57

20.72

.74

.68

.76

20.74

20.76

.7

20.45

20.33 20.4320.51

18.25

.5817 .7217.79

19.17

18.72

.36

.79

.30

.85

.47

.88

.2

.6

19.59

20.00

.19

19.63

.4

.6

.9

20.06

.0

.0

16.40

16.3916 .8416.22

.10

16.58

.96

.4

16.23

.7416.21

.29

.83

15.7816.18

15.84

.35

.98

.5916 .08

.4

616.02 16.00

.55

.84

.81

.77

.85

.93

.87

16.85

.36

.27

.30

.89

16.03

.14

.04

.90

20.09

19.82

19.87

19.90

20.26

20.27 20.28

20.65

.49

20.43 20.44

20.28 20.31

20.13

.89

19.77

.75

20.0920.08

20.15

.8419

.80

19.78

19.76

19.78

19.69

19.50

.0

19.56 19.99

19.75

19.80

19.81

.72

19.94

.77 20

.13

.46

.65

.48

.92

.31

.47

.20

.30

17.80

18.14

17.85 17.85

18.13

.8

.6417.62

17.04

16.80

16.76

.5

16.16

16.1415.74 15.73

.38

20.12 20.19

17.30

17.75

19.8720.1320.41

.0

19.86

19.66

16.50

.58

.0

13.28

11.82 11.21

D

D

D

D

D

D

D

D

D

D

D D

D D

D

D

D

D

D

D

D

LA

N

D S

U R

VE

YO

R S

AN

D

L

AN

D P

LA

N

N

ER

S

T. C. MULLIN

SHEET:

JOB NUMBER:

APPROVED BY:

G. P. WILLIAMS

FIELD BOOK/PAGES

GPS COLLECTED

DRAWN BY:

SCALE:

1" = 20'

DATE:

07/06/2022

R E V

IS

IO

N S

B Y

D A T E

C

ER

TI

FI

C

AT

E O

F

AU

TH

O

R

IZ

AT

IO

N N

O . L

B

PH

O

N E

(5

) 4

-7

V

IS

TA

P

AR

KW

AY

, S

U

IT

E

W

ES

T

PA

LM

B

EA

C

H , F

LO

R

ID

A

W eb

S ite

: w w w .fr ss ur ve y.

co m

N O

R T

H

DRAINAGE MANHOLE

RIM EL. 16.12

INV. EL. 7.42 (NE)

INV. EL. 12.26 (NW)

INV. EL. 6.92 (W)

" R

.C .P

15" H.D.P.E.

DRAINAGE MANHOLE

RIM EL. 19.13

INV. EL. 11.33 (NE)

INV. EL. 11.03 (SW)

" R

.C .P

12" R.C.P.

" R

.C .P

CATCH BASIN

RIM EL. 17.26

INV. EL. 13.74 (SW)

CATCH BASIN

RIM EL. 17.17

INV. EL. 13.17 (NE)

INV. EL. 13.17 (SW)

CATCH BASIN

RIM EL. 14.02

INV. EL. 12.62 (NE)

INV. EL. 12.62 (SW)

" R

.C .P

" R

.C .P

CATCH BASIN

RIM EL. 16.71

INV. EL. 12.31 (NE)

INV. EL. 12.31 (SE)

INV. EL. 12.31 (SW)

12" R.C.P.

CATCH BASIN

RIM EL. 17.88

INV. EL. 12.61 (NW)

INV. EL. 12.52 (SE)

" R

.C .P

18" P.V.C.

" P

.V .C

CATCH BASIN

RIM EL. 19.18

INV. EL. 13.48 (NE)

INV. EL. 13.48 (SE)

INV. EL. 13.48 (SW)

CATCH BASIN

RIM EL. 19.18

INV. EL. 12.76 (NE)

INV. EL. 12.76 (NW)

FDC

= BELLSOUTH TELEPHONE MANHOLE

= SIAMESE CONNECTION

= WATER SPRINKLER VALVE

= WATER GATE VALVE

= FIRE HYDRANT

= CABLE TELEVISION RISER

= CURB INLET

= CATCH BASIN

= POSTED SIGNS

= ELECTRIC BOX

= CONCRETE LIGHT POLE

= BELLSOUTH TELEPHONE RISER

= SANITARY MANHOLE

GV

S

CTV

HYD

SCV

= EXISTING DRAINAGE PIPE

= EXISTING SANITARY SEWER PIPE

= EXISTING WATER MAIN PIPE

D

S

W

= EXISTING GUARDRAIL

= EXISTING FIBOR OPTIC LINE

= EXISTING BURRIED ELECTRIC LINE

FO

BE

= EXISTING BURRIED ELECTRIC LINEIRR

= EXISTING UNKNOWN LINEUNK

= EXISTING GAS LINEGAS

= WIRE PULL BOX

= EMERGENCY CALL BOXECB

WPB

E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:53 AM, AutoCAD PDF (High Quality Print).pc3, BU

S

YD

YD

YD

YD

D

D

D

GV

DDCV

HYD

GV

FDC

FDC

GV

GV

IC

VIC

V

FD

C

FD

C

HY

D

GV

WPB

WPB

WPB

WPB

X

X

X

X

GATE

Building B-12

B-7

Building B-3 Pa rk ing G ar ag e

G

AT

E

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

D

D

D

D

D

D

D

D

D

D

D

D

D

D

W

W

W

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

UNK

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

BE

BE

BE

BE

IR

R

IR

R

IRR

IR

R

IR

R

IR

R

IR

R

UNK

BE

BE

BE

BE

.77

20.77

20.76 20.72

.58

20.50

20.6620 .59

.38

.3

19.69

19.72

18.34

.11

18.26 18.37

18.62

18.9218.97

18.97

19.04

18.90 18.86

18.93 19.08

19.26

19.21

19.34

19.40

18.73

.97

18.75

19.18

19.7019.88 19.98

20.35 20.42

20.20

20.26

19.37

19.46

20.28 20.42

20.33

20.16

20.09

19.83

19.87 19.60

19.63

19.2819.18

19.14 19.34

19.38

19.40

19.2519.14

19.12

.23 19 .38

.96

18.90

18.7118.72

18.58 18.58

18.92

18.46 18.34

18.07 18.19

.4819

.80

.95

20.62

.58

20.40

.50

.57

.44

.49

.25

.16

.20

.22

.25

.30

.51

.1

20.27

20.43

20.18 20.3020

.48

.56

.47

.44

.38 20

.12

.27

.24

.37

.49

20.47

20.46

.46

20.55

.58

20.60

.5

20.61 20.54

20.51

20.48

20.58

20.64

.81

20.11

.95

.18

.09

.52

.26

.04

.09

.24

.60

.50

.27

17.08 15.48

15.79

18.31

15.89

19.08

16.00

20.09

20.80 16.11

16.28

20.80

16.42

16.40

16.52

16.3820.84

20.7916.46

.39

20.76

16.66 20.85

.50

.50

.55

16.35 18.50

16.32 17.73

17.0516.24

16.16 16.93

16.7716.24

16.23 16.22 16.61

16.52

.1

.0

16.4515 .9

15.86

15.96

15.87

15.75

16.43

16.43

16.42 16.45

.24

.33

17.40

18.34

18.36

19.77 19.81

19.88

.1

.39

.73

.6

20.31

20.34

20.27

20.23

.21

20.22

20.18

20.30 20.22

19.90

.62

19.64

19.83

20.02 20.11

.1

20.21

20.19

20.16 20.24

20.30 20.30

20.23

20.33 20.35

20.35

20.34

.2

20.28

.33

20.20

.21

.25

.23

.24

.25

.24

.43

.45

.50

.30

.83

.08

.50

.69

.29

.00

.79

.69

.75

.13

.43

.36

.30

.74

.4

.32

.14

.91

19.78 19.82

19.96

20.31

.31

.07 20

.10

.86

18.80

18.85

18.92

16.89 16.77

.58

.08

.04

17.95

17.42

16.84

16.59

.4

.4

.4

.5515.85

15.76

.2

.8

.8 416.78

16.35

16.38

16.91

.01

16.4015.96

.8

.92

DD

D D

D

D

D

D

D

D

D

LA

N

D S

U R

VE

YO

R S

AN

D

L

AN

D P

LA

N

N

ER

S

T. C. MULLIN

SHEET:

JOB NUMBER:

APPROVED BY:

G. P. WILLIAMS

FIELD BOOK/PAGES

GPS COLLECTED

DRAWN BY:

SCALE:

1" = 20'

DATE:

07/06/2022

R E V

IS

IO

N S

B Y

D A T E

C

ER

TI

FI

C

AT

E O

F

AU

TH

O

R

IZ

AT

IO

N N

O . L

B

PH

O

N E

(5

) 4

-7

V

IS

TA

P

AR

KW

AY

, S

U

IT

E

W

ES

T

PA

LM

B

EA

C

H , F

LO

R

ID

A

W eb

S ite

: w w w .fr ss ur ve y.

co m

N O

R T

H

CATCH BASIN

RIM EL. 18.20

INV. EL. 10.85 (NE)

INV. EL. 13.30 (SE)

INV. EL. 10.85 (SW)

" R

.C .P

CATCH BASIN

RIM EL. 19.00

INV. EL. 11.60 (NE)

INV. EL. 11.60 (SW)

" R

.C .P

DRAINAGE MANHOLE

RIM EL. 20.24

INV. EL. 11.54 (NE)

INV. EL. 13.04 (SE)

INV. EL. 16.09 (S)

INV. EL. 13.34 (SW)

INV. EL. 13.04 (W)

18" H.D.P.E.

DRAINAGE MANHOLE

RIM EL. 20.64

18" H .D

.P.E.18 " H

.D.P.E.

8" P.V.C.

FDC

= BELLSOUTH TELEPHONE MANHOLE

= SIAMESE CONNECTION

= WATER SPRINKLER VALVE

= WATER GATE VALVE

= FIRE HYDRANT

= CABLE TELEVISION RISER

= CURB INLET

= CATCH BASIN

= POSTED SIGNS

= ELECTRIC BOX

= CONCRETE LIGHT POLE

= BELLSOUTH TELEPHONE RISER

= SANITARY MANHOLE

GV

S

CTV

HYD

SCV

= EXISTING DRAINAGE PIPE

= EXISTING SANITARY SEWER PIPE

= EXISTING WATER MAIN PIPE

D

S

W

= EXISTING GUARDRAIL

= EXISTING FIBOR OPTIC LINE

= EXISTING BURRIED ELECTRIC LINE

FO

BE

= EXISTING BURRIED ELECTRIC LINEIRR

= EXISTING UNKNOWN LINEUNK

= EXISTING GAS LINEGAS

= WIRE PULL BOX

= EMERGENCY CALL BOXECB

WPB

E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:56 AM, AutoCAD PDF (High Quality Print).pc3, HYD

GV

ICV

ICV

W

WPB

WPB

WPBWPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

WPB

14 14

14 14 14

15 15

WWWWWWWW

WWW

WWWWWWWWWW

W

W W

W W

W

D

W

W

W

W

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

BEBE

BE

BE

BE

BE

BE

BE

BE

BE

BEBE

BEBEBE

BE BE BE BE BE BE

BE

BE

BE

BE

BE

BE

BE

BE

BE

UNK

UNK

UNK

UNK

UNK

D D

D

IRR

IRR

IRR

IRR

IRR

IRR

IRR

IRR

IRR

IRR

IRR

IRR

.3

.5

16.40

16.38

.5

.3

.77

19.98 18 .34

.2

.84

15.63

15.63

.80

.92

15.80

15.88

.07

15.93

.63

.38

15.79

16.03

.67

14.03

13.85

13.76

.00 14.61

14.59

.68

14.66

.3414.32

.75

.35

.44

.09

.47 15

.41

.93

.22

.74

.54

13.72

.12

.82

.32

13.5514 .49

.8313

.66

13.23

13.90

14.96

.30

.89

.50

.23

13.7413 .66

.88

.51

.65

.16

.74

.94

.03

.15

.64

.9614

.8514 .32

.60

.92

.28

.58

.87

.81

.76

.2

.87

16.73

.50

.28

.10

.22

.35

.66

.49

.28

.10

.14

.34

.60

.75

16.61

15.64

15.68

.02

.88

.27

.3315

.51

15.82

16.33 16.34

16.26

.97

.79…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .