This solicitation is for a design-build project to improve the walking path at the West Palm Beach VA Medical Center campus. The contractor shall provide all labor, materials, and tools necessary to demolish and replace the existing walking path to meet ADA and VA accessibility guidelines for installation of lighting and miscellaneous concrete repairs within the work area. A site visit is scheduled for January 4, 2023 at 0830 and requests for information are due January 9, 2023 at 1400. Phase 1 proposals are due January 20, 2023 at 1400. This is a 100% set-aside opportunity for Service-Disabled Veteran-Owned Small Businesses. The project is located at the West Palm Beach VAMC campus and is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 1
01-19-2023
548-22-152
36C248
Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
8875 Hidden River Pkwy Suite 525 Tampa FL 33637
36C248
Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
8875 Hidden River Pkwy Tampa FL 33637
To all Offerors/Bidders
36C24823R0057
X
X X
01-27-2023 at 12:00 PM
See CONTINUATION Page
X 1
This amendment provides the Phase 1 RFI responses. The Phase 1 proposal due date is now 01-27-2023 at 12:00 PM EST.
Attached are the following:
1. RFI responses
2. Appendix A Markups
3. Topo Survey
Stacy Figlinski Contracting Officer
Phase 1 Requests for Information DB Improve Walking Path 548-22-152 36C24823R0057
1. The solicitation notes three (3) design submissions (65%, 95%, and 100%). In today's market we would recommend a minimum project duration for the construction portion of the project to be a minimum of 365 days after the approval of the 100% for construction documents. Please review the period of performance noted, 200 days after NTP.
a. Contractor to propose timeline as part of the bid proposal
2. The Scope of Work notes that the walkway lighting shall be flush mounted within the walkway slabs. Please clarify the following questions related to the walkway lighting:
(a) Would it be acceptable to install bollard type walkway lighting in lieu of flush mounted walkway lights?
Bollard type lights are are not acceptable per the VA guidelines
(b) Please provide a site plan which shows the location of the various electrical rooms around the site that we can use for designing the power distribution system for the walkway lights.
(c) Please advise if solar powered walkway lighting would be acceptable.
The A/E can propose this in design but should bid on non solar lighting per the package
(d) Please advise if the lighting levels for the walkway lighting need to meet the minimum ADA requirements.
Lighting levels should meet all ADA guidelines
(e) Please advise on what type of lighting control system is required for the walkway lights, i.e., photocells and/or timeclocks with lighting contractors.
Lighting controls should at a minimum be photocells with timeclock backups but will depend on the design.
(f) If the walkway lighting is required to be installed within the walkways as noted, please advise if there is a minimum spacing required or minimum lighting level.
Meet ADA requirements
3. The conceptual plan for the walkways notes all the walkways are to be replaced and/or extended as shown. The statement of work notes a total of 6,828 LF of walkway to be demolished (4.1.1.2.) and section 4.1.3 notes various lengths of sidewalks to be replaced which are less than 6 ft wide. Please clarify the following questions:
(a) Do we include replacing all of the sidewalks per the conceptual plan or do we follow the statement of work?
The contractor will be responsible for “ALL” of the sidewalk per the conceptual plans. Within this scope of work the walking path sidewalks are different from the non walking path sidewalks please see the mark-up of Appendix A.
(b) If we follow the statement of work and only replace the sections which are less than 6 ft wide, do we still install the flush walkway lights in the sections which remain?
All of the sidewalk is replaced. There is a small section in front of some of the buildings that may remain hence there is no need for lighting in that area. Walking path sidewalks are the only one with lighting requirements.
4. Where the conceptual plan notes replacing the walkway to Military, it will require modifications to the existing gate supports and chain link gate. Please clarify the extent of the work associated with the perimeter fencing and the exist gate where the space is limited due to the structural supports.
The walkway will need to be modified from 6 down to the available space we have at this location due to the physical placement of the gate and supports. This is allowed.
5. Please clarify the locations for the light blue walkways on the conceptual plan.
The light blue line delineates where the new sidewalk will extent to the new wheel curb stop. It is by lot 17 and lot 10
6. Please clarify the type of retaining walls allowed for the added walkway along lot 11 (south side).
Contractor shall propose what type of retaining wall they will utilize.
7. Please provide the latest as-built drawings for the underground utilities for the site.
VA will provide latest survey dwgs. Contractor is responsible to verify all data within these documents.
8. Please provide the latest site survey which shows the site elevations and drainage structures.
VA will provide latest survey dwgs. Contractor is responsible to verify all data within these documents.
9. Please clarify if the striping/painting for the roadways/walkway crossing are required to be thermoplastic with or without glass beads.
Thermoplastic WITH glass bead
10. Is a contractor schedule required within the Phase 1 proposal submission?
CO Response: Yes, it is Factor III.
11. Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?
Yes, as long as the proper credentials are provided.
12. If no to the question above, will the SSHO need to be full-time for this project?
This is dictated by the contractor’s own safety plan that needs to be provided.
13. Is the VA hard set on the "well lights" for pathway lighting? Could be a maintenance nightmare in the future and not very practical for pathway lighting.
We will certainly look for any design guidance that can be provided if it gives us a better end product.
14. Will the VA consider pole lighting around 14'-15' tall?
No this is not an option
15. Can you please provide topographical surveys for the grounds that will receive sidewalks and include who performed the survey and the dates.
VA will provide any documentation that they have but the contractor will be responsible for verifying all data from those documents and fill in any gaps as needed
16. Can you please provide a site map that depicts where available power panels are.
This will need to be verified through the design phase
17. Can we use the existing street light power in some areas?
This will need to be verified through the design phase. If there is capacity this is ok.
18. Does the VA have a preferred utility locating company?
No
19. Does the VA allow directional boring at the facility?
Yes
20. Lead time on fixtures of any kind is undeterminable at this point in time. Could extend project deadline.
Understood
21. Is Buy American Act in full effect on this project?
Yes
22. Does the VA allow aluminum conductors for this type of project?
23. What is the minimum foot candles required by the VA on the walkway at any given point?
Per ADA requirements
24. Does the VA require software design to show foot candles?
No
25. Will a third party scheduler be necessary if the schedule requirements can be met in-house?
No
26. Will a network analysis schedule be required or will a cost loaded CPM schedule suffice?
Cost loaded CPM schedule
27. Will you need or require a bond?
CO Response: Yes, that is stated in the solicitation. A Bid Bond is also required.
28. Are you able to provide funds upfront for material delivery?
CO Response: No, we do not provide any upfront funding.
29. In parking lot 22, where the abandon fence posts are, there may not be enough land to expand to a 6 foot wide ADA approved path with room for the fire lane. For that area, are you willing and able to reduce the size of the path less than 6 foot?
There will be enough room if the abandoned posts are removed.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
C-001
Fi le
P at h
/9 /2
:5
3:
A M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Chkd ByDate:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
FOR REFERENCE ONLY
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VNRevisions: Date: GP
LOCATION PLAN IMPROVE WALKING PATH
WEST PALM BEACH VA MEDICAL CTR
10/28/2022
7305 North Military Trail West Palm Beach, FL 33410-6400 561-422-8262
WEST PALM BEACH VA MEDICAL CENTER
Date:Revisions: Date:
BEG 7-26-22
N
BEE LINE HIGHW
AY
N 53° 41'32" E 1046.16'
N
1°3
'4
" E
.5 7'
L A
K E
LAKE # 4
LAK
E
EXISTING WETLANDS
N
1°4
'2
" E
.5 7'
LAKE #3
WATER TOWER
LOT#10
L O
T #16
LOT # 17
LOT #14
LOT # 13
LOT #20
Catch Basin
LOT #12
LO
T#21
LOT#18 / 19
LOT#23
C1-
B
CORR.
RAMP
LAKE # 2
PARKING
UPPER LEVEL
PARKING
GARAGE
PARKING
PARKING
PARKING
GARAGE
20.3020
LAKE # 6
LOT # 22
LOT # 11
MAIN HOSPITAL
CLC - COMMUNITY LIVING CENTER
FISHER HOUSE4
EMERGENCY WELL (PUMP HOUSE)5
VETERAN RESOURCE CENTER6
CONTRACTING OFFICE12
WAREHOUSE13
SUBSTANCE/MENTAL HEALTH (PTSD CLINIC)14
CANCER CENTER15
MENTAL HEALTH OUT PATIENT (2500 SQFT CSI 16
BUILDING
NUMBER BUILDING
PROJECT MENTAL HEALTH/HOMELESS PROGRAM)
BUILDING
NUMBER BUILDING
PET/CT ADDITION18
HOSPICE19
MAINTENANCE BUILDING20
MRI BUILDING21
DOMICILIARY22
DECON (IN TUNNEL)17
BUILDING
NUMBER BUILDING
8 MCCR (WOODBINE - LEASE NOT ON THIS MAP)
M/C STORAGE
VBA/VSO BLDG.
TRANSPORTATION TRAILER11
INSPECTOR GENERAL TRAILER7
BUILDING
NUMBER BUILDING
0 64' 128' 192' 256' 320'32'
16' 48'
LEGEND
SYMBOL DISCRIPTION
NEW FITNESS STATION
ARM GATE
PEDESTRIAN CROSSING LIGHT
ABANDONED FENCE POSTS
NEW BENCH
REPLACE BENCH
BUS STOP
REPLACE EXISTING WITH 6' SIDEWALK
EXTENDED SIDEWALK TO NEW CURB-WHEEL STOP
NEW 6' SIDEWALK
SIDEWALK REMOVAL
NEW COMBINATION CURB-WHEEL STOP
44444444444444
548-22-152
AutoCAD SHX Text
BLUE HERON BLVD.
AutoCAD SHX Text
MILITARY TRAIL
AutoCAD SHX Text
ASPHALT ROAD
AutoCAD SHX Text 548-09-124
AutoCAD SHX Text Open to below
AutoCAD SHX Text Open to below
AutoCAD SHX Text Open to below
AutoCAD SHX Text Open to below
AutoCAD SHX Text Planter
AutoCAD SHX Text Planter
AutoCAD SHX Text Plant.
AutoCAD SHX Text Drop-off
AutoCAD SHX Text Plant.
AutoCAD SHX Text Planter
AutoCAD SHX Text
7" OAK
AutoCAD SHX Text
7" OAK
AutoCAD SHX Text
12" PALM
AutoCAD SHX Text
10" PALM
AutoCAD SHX Text
10" PALM
AutoCAD SHX Text
12" PALM
AutoCAD SHX Text
12" PALM
AutoCAD SHX Text
12" PALM
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
6" OAK
AutoCAD SHX Text
6" OAK
AutoCAD SHX Text
6" OAK
AutoCAD SHX Text 548-09-124
AutoCAD SHX Text 548-09-124
AutoCAD SHX Text 548-09-124
AutoCAD SHX Text 548-09-124
AutoCAD SHX Text 548-09-124
AutoCAD SHX Text 548-09-124
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
ELEV.
viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect viviana.nazario Architect
CLOUDED PORTIONS ARE CONSIDERED SIDEWALKS - NON WALKING PATH
viviana.nazario Engineer REMAINING SIDEWALKS (NOT CLOUDED) ARE PART OF WHAT THE VA CALLS THE WALKING PATH.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
C-002
Fi le
P at h
/9 /2
:5
3:
A M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VNDate:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
FOR REFERENCE ONLY
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
GPRevisions: Date:
STANDARD DETAILS IMPROVE WALKING PATH
WEST PALM BEACH VA MEDICAL CTR
10/28/2022
7305 North Military Trail West Palm Beach, FL 33410-6400 561-422-8262
WEST PALM BEACH VA MEDICAL CENTER
Date:Revisions: Date:
GP 10-28-22
CONCEPT 548-22-152
AutoCAD SHX Text [1981mm]
AutoCAD SHX Text [1219mm]
AutoCAD SHX Text [1829mm]
AutoCAD SHX Text [1829mm]
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
CURB & GUTTER
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
RAMP FLUSH WITH GUTTER
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
CURB & GUTTER
AutoCAD SHX Text [102mm]
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
SECTION A
AutoCAD SHX Text
1:12 MAX. SLOPE
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
CURB RAMP
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
1:12 MAX.
AutoCAD SHX Text
1:12 MAX.
AutoCAD SHX Text [1829mm]
AutoCAD SHX Text [1219mm]
AutoCAD SHX Text [1829mm]
AutoCAD SHX Text
1:12 MAX.
AutoCAD SHX Text
1:12 MAX.
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
VARIES
AutoCAD SHX Text 2'-6" [760mm]
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
LIMITS OF RAMP
AutoCAD SHX Text
CROSS SLOPE
AutoCAD SHX Text
(1%. (TYP.))
AutoCAD SHX Text
AutoCAD SHX Text
MAXIMUM SLOPE = 2%
AutoCAD SHX Text
AutoCAD SHX Text
VARIES
AutoCAD SHX Text 2'-6" [760mm]
AutoCAD SHX Text 2'-6" [760mm]
AutoCAD SHX Text 4' [1.2m]
AutoCAD SHX Text
ROADWAY WIDTH
AutoCAD SHX Text
VARIES
AutoCAD SHX Text NOTE: 1. TOP OF CURB (TC) AND TOP OF CURB (TC) AND TOP OF RAMP ELEVATIONS SHOWN ARE IN RELATION TO THE GUTTER AND ARE LOCATED RADIALLY. GUTTER = 0" 2. SEE STANDARD VA DETAIL SEE STANDARD VA DETAIL 32 05 23-18 "CONCRETE SIDEWALK" FOR JOINT REQUIREMENTS. 3. WHEN CURB HEIGHTS OF WHEN CURB HEIGHTS OF GREATER THAN 7" [180mm] ARE SHOWN ON PLANS, SEE PLANS AND ADA REQUIREMENTS. 4. REFER TO SHEET 3 OF 5 REFER TO SHEET 3 OF 5 FOR RAMP SURFACE FINISH.
AutoCAD SHX Text TYPE 2 CURB, H=6" [150mm] PER STANDARD VA DETAIL 32 05 23-17 "CONCRETE VERTICLE CURB AND TERMINAL SECTION" OR BARRICADE RAILING PER STANDARD VA DETAIL 32 05 23-04 "CONCRETE POST BARRICADE" REQUIRED ONLY WHEN NOTED ON PLANS IN ORDER TO RESTRICT VEHICULAR TRAFFIC.
AutoCAD SHX Text 6'-6" [2m] SIDEWALK RAMP WIDTH
AutoCAD SHX Text SIDEWALK WIDTH PER PLANS 4' MIN. [1.2m]
AutoCAD SHX Text
VARIES
AutoCAD SHX Text 2'-6" [760mm]
AutoCAD SHX Text TC=1/2" [13mm]
AutoCAD SHX Text TC=7" [760mm]
AutoCAD SHX Text TOP OF RAMP=3" [75mm]
AutoCAD SHX Text TRANSITION TO MATCH EXIST. CURB AND GUTTER AND SIDEWALK. EXISTING DIMENSIONS MAY VARY SEE PLANS
AutoCAD SHX Text
SIDEWALK RAMP CONTROL POINT SEE PLANS
AutoCAD SHX Text TOP OF RAMP=3 1/2" [90mm]
AutoCAD SHX Text TOP OF RAMP=3" [75mm]
AutoCAD SHX Text
RADIUS PER PLANS
AutoCAD SHX Text TOP OF RAMP= 7 5/8" [195mm]
AutoCAD SHX Text
PER PLANS
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
ROADWAY WIDTH
AutoCAD SHX Text
CURB AND GUTTER
AutoCAD SHX Text TC=7" [760mm]
AutoCAD SHX Text TC=1/2" [13mm]
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
TRUNCATED DOMES DETECTABLE WARNING STRIP
AutoCAD SHX Text 2' [609mm]
AutoCAD SHX Text
TRUNCATED DOMES DETECTABLE WARNING STRIP
AutoCAD SHX Text
TRUNCATED DOMES DETECTABLE WARNING STRIP
AutoCAD SHX Text
CURB ACESS RAMP - LIMITED RIGHT-OF-WAY
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
ELEVATION DEPRESSED CURBE AT SIDEWALK RAMP
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text 2' [609mm]
AutoCAD SHX Text
12:1 (MAX)
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
CURB ACCESS RAMP ALTERNATIVES
AutoCAD SHX Text
1:50 (MAX)
AutoCAD SHX Text
TRUNCATED DOMES DETECTIBLE WARNING STRIP
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text
12:1 (MAX)
AutoCAD SHX Text
1:50 (MAX)
AutoCAD SHX Text
TRUNCATED DOMES DETECTIBLE WARNING STRIP
AutoCAD SHX Text
CHORD
AutoCAD SHX Text NOTE: REFER TO VA STANDARD DETAIL 32 05 23-20 "TRUNCATED DOME TACTILE - WARNING STRIP" FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text [1219mm]
AutoCAD SHX Text [1219mm]
AutoCAD SHX Text [1524mm]
AutoCAD SHX Text [455mm]
AutoCAD SHX Text [455mm]
AutoCAD SHX Text [455mm]
AutoCAD SHX Text [1524mm]
AutoCAD SHX Text
LOCATE CURB ACCESS RAMP TO ALIGN WITH CROSSWALK
AutoCAD SHX Text
12:1 (MAX.)
AutoCAD SHX Text
CROSSWALK
AutoCAD SHX Text
CROSSWALK
AutoCAD SHX Text
TRUNCATED DOMES DETECTIBLE WARNING STRIP
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text 2' [609mm]
AutoCAD SHX Text
12:1 (MAX)
AutoCAD SHX Text
CURB ACCESS RAMP ALTERNATIVES
AutoCAD SHX Text
1:50 (MAX)
AutoCAD SHX Text
TRUNCATED DOMES DETECTIBLE WARNING STRIP
AutoCAD SHX Text [1219mm]
AutoCAD SHX Text [455mm]
AutoCAD SHX Text [1524mm]
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text 2' [609mm]
AutoCAD SHX Text [1829mm] OR PER PLAN
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text NOTES: 1. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB OR OTHER ADJACENT STRUCTURES. 2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT LOCATIONS AND SHALL EXTEND THE FULL DEPTH OF THE CONCRETE. 3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' [4572mm] OR AT A SPACING THAT MATCHES THE ADJACENT CURB. 4. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS. 5. SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH OF SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB. 6. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH A FINE BRUSH IN A TRANSVERSE DIRECTION. 7. 1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' [1829mm] OR EQUAL TO SIDEWALK WIDTH.1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' [1829mm] OR EQUAL TO SIDEWALK WIDTH.
AutoCAD SHX Text 1" [25mm] SCORED OR SAWCUT CONTRACTION JOINT.
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text 1/4" [6mm] DEEP SCORED JOINTS
AutoCAD SHX Text 1/4" [6mm] R. (TYP.) FORMED JOINTS ONLY
AutoCAD SHX Text
CLASS "B" CONCRETE
AutoCAD SHX Text EXPANSION JOINT WITH 1/4" [6mm] BITUMINOUS JOINT FILLER
AutoCAD SHX Text
1% MIN. 2% MAX.
AutoCAD SHX Text
1% MIN. 2% MAX.
AutoCAD SHX Text [152mm]
AutoCAD SHX Text 10.5' MAX. [3200mm]
AutoCAD SHX Text
TYPICAL SECTION
AutoCAD SHX Text
EXPANSION AND SCORED JOINT DETAIL
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [102mm]
AutoCAD SHX Text [18288mm] EXPANSION JOINT TO EXPANSION JOINT
AutoCAD SHX Text [18288mm] EXPANSION JOINT TO EXPANSION JOINT
AutoCAD SHX Text
(TYP)
AutoCAD SHX Text
PLANS
AutoCAD SHX Text
PLANS
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
TRUNCATED DOME TACTILE - WARNING STRIP
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NOTE: FIELD LEVEL DOME COVERAGE = 41 POINTS PER SQUARE INCH
AutoCAD SHX Text INTERNAL EMBEDMENT FLANGE @ 3" [76mm] C/C (SEE PLAN FOR ORIENTATION)
AutoCAD SHX Text 90° POINTS0.045" [1mm] HIGH
AutoCAD SHX Text
INTERNAL EMBEDMENT FLANGE @ 3" [76MM] C/C (SEE PLAN FOR ORIENTATION)
AutoCAD SHX Text
0.625" HOLE THROUGH EMBEDMENTFLANGES (3 PER FLANGE) AS SHOWN ON REFLECTED PLAN
AutoCAD SHX Text 0.625"[16mm] HOLE THROUGH EMBEDMENT FLANGES (3 PER FLANGE)
AutoCAD SHX Text
INTERNAL EMBEDMENT FLANGE 7 PER TILE
AutoCAD SHX Text 0.1875" x0.0625"DEEP [5mm x1mm]DOME UNDERSIDE OF TILE
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
PLAN - TILE
AutoCAD SHX Text
REFLECTED PLAN - TILE
AutoCAD SHX Text [79mm]
AutoCAD SHX Text [76mm]
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [79mm]
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [35mm]
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [51mm]
AutoCAD SHX Text [11mm]
AutoCAD SHX Text [11mm]
AutoCAD SHX Text [32mm]
AutoCAD SHX Text [42mm]
AutoCAD SHX Text [42mm]
AutoCAD SHX Text [625mm]
AutoCAD SHX Text
TILE FILLED WITH STRUCTURAL POLYMER CONCRETE
AutoCAD SHX Text 0.625" [16mm] HOLEEMBEDMENT FLANGES AS SHOWN IN PLAN
AutoCAD SHX Text [2mm]
AutoCAD SHX Text [6mm]
AutoCAD SHX Text [10mm]
AutoCAD SHX Text 90° POINTS0.045" [1mm] HIGH
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [51mm]
AutoCAD SHX Text [11mm]
AutoCAD SHX Text [11mm]
AutoCAD SHX Text [32mm]
AutoCAD SHX Text [42mm]
AutoCAD SHX Text [42mm]
AutoCAD SHX Text [625mm]
AutoCAD SHX Text [10mm]
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [4mm]
AutoCAD SHX Text [35mm]
AutoCAD SHX Text [18mm]
AutoCAD SHX Text [7mm]
AutoCAD SHX Text [24mm]
AutoCAD SHX Text [60mm]
AutoCAD SHX Text [10mm]
AutoCAD SHX Text [32mm]
AutoCAD SHX Text [2mm]
AutoCAD SHX Text [23mm]
AutoCAD SHX Text [10mm]
AutoCAD SHX Text [42mm]
AutoCAD SHX Text [42mm]
AutoCAD SHX Text [2mm]
AutoCAD SHX Text [2mm]
AutoCAD SHX Text [2mm]
AutoCAD SHX Text [1mm]
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text [32mm]
AutoCAD SHX Text [32mm]
AutoCAD SHX Text [42mm] SPACING C/C
AutoCAD SHX Text [625mm]
AutoCAD SHX Text [32mm]
AutoCAD SHX Text [32mm]
AutoCAD SHX Text [42mm] SPACING C/C
AutoCAD SHX Text [625mm]
AutoCAD SHX Text
SEE DETAIL RIGHT
AutoCAD SHX Text [79mm]
AutoCAD SHX Text [79mm]
AutoCAD SHX Text [76mm] SPACING C/C
AutoCAD SHX Text [625mm]
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [32mm]
AutoCAD SHX Text [203mm]
AutoCAD SHX Text [625mm]
AutoCAD SHX Text [203mm]
AutoCAD SHX Text [19mm]
AutoCAD SHX Text [16mm]
AutoCAD SHX Text [31mm]
AutoCAD SHX Text DETECTABLE WARNING NOTES: THE DETECTABLE WARNING STRIP MUST COVER THE ENTIRE WIDTH OF THE RAMP OPENING, EXCLUDING THE WINGS. ALL DOMES MUST BE ALIGNED IN THE DIRECTION OF TRAVEL. ONE CORNER OF THE LEADING EDGE OF THE DETECTABLE WARNING MAY BE MORE THAN 5 FEET FROM THE BACK OF THE CURB. WHEN LOCATED ALONG A CURB RETURN, THE LEADING EDGE OF THE DETECTABLE WARNING MAY BE DEIFNED BY THE CHORD DRAWN BETWEEN THE LEADING EDGES OF THE RAMP OPENING.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
C-003
Fi le
P at h
/9 /2
:5
3:
A M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VNDate:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
FOR REFERENCE ONLY
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
GPRevisions: Date:
WEST PALM BEACH VA MEDICAL CTR
10/28/2022
7305 North Military Trail West Palm Beach, FL 33410-6400 561-422-8262
WEST PALM BEACH VA MEDICAL CENTER
Date:Revisions: Date:
GP 10-28-22
STANDARD DETAILS IMPROVE WALKING PATHCONCEPT 548-22-152
VA FURNISHED CONTRACTOR INSTALLED (VC)
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
%%UPLAN
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
%%USECTION A
AutoCAD SHX Text
%%USECTION B
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text [2438mm]
AutoCAD SHX Text [1524mm]
AutoCAD SHX Text 20'
AutoCAD SHX Text [6096mm]
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text 4' [1219mm]
AutoCAD SHX Text [1524mm]
AutoCAD SHX Text [305mm]
AutoCAD SHX Text 3'
AutoCAD SHX Text [914mm]
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text
GUTTER
AutoCAD SHX Text [152mm]
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
WALK FLUSH WITH CURB
AutoCAD SHX Text 1/2" [13mm] EXPANSION JOINT
AutoCAD SHX Text
AutoCAD SHX Text
COMBINATION CURB-WHEEL STOP
AutoCAD SHX Text
NTS
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text [1524mm]
AutoCAD SHX Text 4" [102mm] PAINTED DIAGONAL LINES
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
CROSS SLOPE OF GUTTER SAME AS PAVEMENT
AutoCAD SHX Text
CURB & GUTTER
AutoCAD SHX Text [152mm]
AutoCAD SHX Text
AutoCAD SHX Text
BENCH DETAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
NTS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
C-004
Fi le
P at h
/9 /2
:5
3:
A M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
FOR REFERENCE ONLY
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
WEST PALM BEACH VA MEDICAL CTR7305 North Military Trail West Palm Beach, FL 33410-6400 561-422-8262
WEST PALM BEACH VA MEDICAL CENTER
Date:Revisions: Date:
VC FITNESS EQUIPMENT IMPROVE WALKING PATH
VN GP10/28/2022
GP 10-28-22
CONCEPT 548-22-152
VA FURNISHED CONTRACTOR INSTALLED (VC) VA FURNISHED CONTRACTOR INSTALLED (VC)
VA FURNISHED CONTRACTOR INSTALLED (VC) VA FURNISHED CONTRACTOR INSTALLED (VC)
VA FURNISHED CONTRACTOR INSTALLED (VC)
VA FURNISHED CONTRACTOR INSTALLED (VC)
VA FURNISHED CONTRACTOR INSTALLED (VC)
AutoCAD SHX Text
AutoCAD SHX Text
SIT UP BOARD
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
MULTI BENCH
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
BACK EXTENSION
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
HORIZONTAL BAR
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
PARALLEL BAR
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
BALANCE BEAM
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
PULL UP AND DIP STATION
NTS
D
DD
D
9.
1'
21.3'
.0
9.5'
.6
19.6'
4.
5'33.3'0.
3'
54.2'0.
3'
38.0'
.9
10.4'
6.
8'
66.6'
.7
8.5'
1.
3'
2.1'
.5
202.0'
BUS
SHELTER
D
D
S
SDDDD
S
CO RDRDRDRD
RD
COCOCO
D
S S S S
HYD
GV
G V G
VD
D
C V
R
PZ
PIV
WPB
WPB
WPB
TR
AN
S
TRANS
WPB
WPB
WPB
X X X X X X
X
X
X
X
X
GT
GT
CO
CO
TOBTOB
TOB
TOE TOE
TOE
TO
E
GV
GV
W
W
W
W
W
W
W
LS W CO
CO
FM
FDC
DUMPSTER
PAD
C O
C O
B U
S
BUS
BU
S
TOB
TOB
TO
B
TOB
TO
B
TO
B
TOB
TO
B
TO
B
TO
B
TO
B
TO
B
TO
B
TO
B
TOB
TO
B
TOB
TOB
TOB TOB
TOB TOB
TOB TOB TOB TOB TOB TOB
TOB TOB TOB TOB TOB TOB
TOE TOE TOE TOE TOE TOE TOETOE TOE TOE TOE TOE TOE TOE
YD
YD
YD
YD
D
D
D
D
D
D
D
YD
YDYD
YD YD YD
YDYD
YDYD
YD
HR
H R
HR
HR
HR
H R
H R
HR
HR
Gate
Gate
Gat e
Gate
Gate
Gate
DDCV
GV
H
YD
H
YD
GV
GV
ICV
GV
WM
ICV
GV
GV
HY
D
RP
Z
HYD
GV
ICV
ICV
WV
GV
GV
GV
GV
IC
V IC
VIC
V
HYD GV
GV
DDCV
HYD
GV
FDC
FDC
GV
GV
IC
VIC
V
FD
C
FD
C
HY
D
GV
W
W
W
WPB
WPB
WPB
WPB
ECB
WPB
WPB
WPBWPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
GATE
GATE
YD
YD
Building B-10
Building B-12
Building B-7
Building B-3
Building B-4
Pa rk ing G ar ag e
Parking Garage
Building B-1
G
AT
E
RP
Z
Building B-22
Building B-13
Building B-14
W
W
W
W W
W
WW
D
W W
W
W
D
D
D
D
D
W
W
W
W
W
W
W
W
PROPANE GAS
BE
BE
BE
BE
BE
BE
BE
BE
BEBEBE
UNK
BE
BE
BEBE
BE
IR
R
IRR
D
D
BE
IRR
BE
BE
D
D
D
D D
D
D
D
D
D
D
D
D D D D
D
D
D
D
D D D D D D D D
D
D
D
D
D
D D
D
D D
Unknown
Unknown
Unknown Unknown
Unknown
Unknown
Unknown
Unknown Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
CAN
OPY
C
OVE
R
ALUMINUM TRAILOR WITH ALUMINUM HANDI-CAP RAMP & STEPS
CALL BOX
CALL BOX
CALL BOX
CS cs cs
CONTROL BOXS
WPB
WPB
WPB
WPB WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
TRANS
WPB
WPB
WPB
XXXXXXXX
X
X
X
X
X
XXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
GATE
CONTROL BOXS
GATE
GATE
CONTROL BOXS
CONTROL BOXS
HYD
GV
HYD
GV
FDC
HYD
G
VGV
KEY PAD
KEY PAD
KEY PAD
KEY PAD
WATER PUMP
WATER PUMP
SI
G
N SIGN
SI
GN
SI
GN
METAL STEPS
YD
DIESEL TANK
DIESEL TANK
4" H.D.P.E.
TOP EL. 11.27
D
D
D
D
D
D
BE
BEBEBE
BEBE
D
BE
D D D
BE
BE
D
D
BEBE
BE
BE
W
BE BE
BE
D
CALL BOX
VAULT
KEY PAD
D
FO
FOFOFO
FO
FO
FO
FO
FO
FO FO
FO
FO
FO
D
D
S
A PORTION OF THE VETERANS ADMINISTRATION HOSPITAL IN RIVIERA BEACH, FLORIDA.
LYING IN THE SOUTHWEST 1/4 OF SECTION 25, TOWNSHIP 42 SOUTH, RANGE 42 EAST.
FOR THE FIRM
FLORIDA CERTIFICATION No. 4817
GARY P. WILLIAMS, R.L.S.
F.R.S. AND ASSOCIATES, INC.
WE HEREBY STATE THAT THE MAP OF SURVEY SHOWN HEREON IS A TRUE AND
CORRECT REPRESENTATION OF THE NEWLY CONSTRUCTED FEATURES, MADE UNDER
OUR DIRECTION, AND IS ACCURATE TO THE BEST OF OUR KNOWLEDGE AND BELIEF.
THE UNDERSIGNED HEREBY CERTIFIES THAT THIS SURVEY CONFORMS TO THE
STANDARDS OF PRACTICE AS OUTLINED IN CHAPTER 5J-17, F.A.C. AS THEY PERTAIN
TO A "TOPOGRAPHICAL SURVEY" ADOPTED BY THE FLORIDA BOARD OF
PROFESSIONAL SURVEYORS & MAPPERS, PURSUANT TO SECTION 472.027, FLORIDA
STATUTES. NOT VALID UNLESS SEALED WITH SURVEYOR'S EMBOSSED SEAL AND
SIGNATURE.
LA
N
D S
U R
VE
YO
R S
AN
D
L
AN
D P
LA
N
N
ER
S
T. C. MULLIN
SHEET:
JOB NUMBER:
APPROVED BY:
G. P. WILLIAMS
FIELD BOOK/PAGES
GPS COLLECTED
DRAWN BY:
SCALE:
1" = 80'
DATE:
07/06/2022
R E V
IS
IO
N S
B Y
D A T E
C
ER
TI
FI
C
AT
E O
F
AU
TH
O
R
IZ
AT
IO
N N
O . L
B
PH
O
N E
(5
) 4
-7
V
IS
TA
P
AR
KW
AY
, S
U
IT
E
W
ES
T
PA
LM
B
EA
C
H , F
LO
R
ID
A
W eb
S ite
: w w w .fr ss ur ve y.
co m
N O
R T
H
1. BEARINGS SHOWN HEREON REFER TO S 00° 45' 23" E ALONG THE EAST
SECTION LINE OF SECTION 31, TOWNSHIP 34 SOUTH, RANGE 36 EAST, STATE
PLANE GRID SYSTEM. ALL OTHER BEARINGS ARE RELATIVE THERETO.
2. ALL DISTANCES AND BEARINGS SHOWN HEREON ARE GRID DISTANCES AND
GRID BEARINGS AND ARE SHOWN IN U.S. SURVEY FEET.
3. THE LANDS SHOWN HEREON WERE NOT ABSTRACTED BY THIS FIRM FOR
RIGHTS-OF-WAY, EASEMENTS, OWNERSHIP, OR OTHER INSTRUMENTS OF
RECORD THAT MAY AFFECT THE SUBJECT SITE.
4. ALL UNDERGROUND UTILITIES WERE LOCATED BY BLOOD HOUND
UNDERGROUND UTILITY LOCATORS AND SHOWN ON SURVEY.
5. ELEVATIONS SHOWN HEREON REFER TO THE NORTH AMERICAN VERTICAL
DATUM OF 1988 (N.A.V.D. '88).
6. COORDINATES SHOWN HEREON REFER TO THE STATE PLANE COORDINATE
SYSTEM 1983 DATUM WITH THE 2011 ADJUSTMENT FOR FLORIDA EAST ZONE.
7. HORIZONTAL AND VERTICAL CONTROL USED: NATIONAL GEODETIC SURVEY
(NGS) MONUMENTS "E-535" NORTHING = 763,507.27, EASTING = 673,808.63,
ELEVATION = 6.739; "FLGPS65" NORTHING = 763,067.69, EASTING = 661,808.81,
ELEVATION = 5.967.
8. THIS SURVEY WAS PERFORMED UTILIZING TRIMBLE REAL TIME KINEMATIC
GPS (RTK GPS) SURVEY EQUIPMENT FOR THE HORIZONTAL AND VERTICAL
INFORMATION SHOWN HEREON.
SHEET 3 OF 11SHEET 2 OF 11
SHEET 4 OF 11
SHEET 5 OF 11 SHEET 6 OF 11
SHEET 8 OF 11
SHEET 7 OF 11
SHEET 9 OF 11
SHEET 10 OF 11 T.
C
.M
/0
2/
AD
D
ED
D R
AI
N
AG
E
R
IM
S
IN
VE
R T
EL
EV
AT
IO
N S
T.
C
.M
/0
8/
AD
D
ED
T R
EE
T
YP
E, S
IZ
E
C
AN
O
PY
D
IA
. S H
EE
TS
FDC
= BELLSOUTH TELEPHONE MANHOLE
= SIAMESE CONNECTION
= WATER SPRINKLER VALVE
= WATER GATE VALVE
= FIRE HYDRANT
= CABLE TELEVISION RISER
= CURB INLET
= CATCH BASIN
= POSTED SIGNS
= ELECTRIC BOX
= CONCRETE LIGHT POLE
= BELLSOUTH TELEPHONE RISER
= SANITARY MANHOLE
GV
S
CTV
HYD
SCV
= EXISTING DRAINAGE PIPE
= EXISTING SANITARY SEWER PIPE
= EXISTING WATER MAIN PIPE
D
S
W
= EXISTING GUARDRAIL
= EXISTING FIBOR OPTIC LINE
= EXISTING BURRIED ELECTRIC LINE
FO
BE
= EXISTING BURRIED ELECTRIC LINEIRR
= EXISTING UNKNOWN LINEUNK
= EXISTING GAS LINEGAS
= WIRE PULL BOX
= EMERGENCY CALL BOXECB
WPB
SHEET 11 OF 11 T.
C
.M
/1
6/
U
PD
AT
ED
S
U R
VE
Y
AD
D
ED
S
H
EE
TS
0, , 2 0, T.
C .M
/1 5/
AD
D
R
ES
SE
D
C O
M M
EN
TS
F R
O M
E R
N
ES
T D
AV
IS
E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:36 AM, AutoCAD PDF (High Quality Print).pc3, FRS & ASSOCIATES, INC, (561) 478-7178
TO
B
TOB
TOB
TOB
TOB
TOB
TO
B
TO
B
TO
B
TO
B
TO
B
TOB
TOB
TOB TOB
TOB
TOB
TOB
TOB
TOB
TOB
TOB TOB
TOB
TOB
TOB
TOB
TOB TOB
YD
YD
H R
H R
HR
HR
Gate
Gate
Gat e
Gate
Gate
H
YD
GV
GV
W
WPB
WPB
WPB
WPB
WPB
WPB
WPB
Building B-10
RP
Z
1616 16
17 16
12131415
14 15 16
12 13 14
15141312
19 20
W W
W W
W W
W
W W
W
W
WW
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
BE
BE
BE
BE
UNK
UNK
UNK
UNK
UNK
UNK
UNK
UNK
UNK
UNK
UNK
UNK
UNK
UNK
UNK
BEBEBEBEBEBE
BE
BE
BEBEBEBE
BE
BE
BE
BE
BE
BE
BE BE BE BE BE BE BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
UNK
UNK
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BEBEBEBE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
UNK
UNK
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IRR
IRR
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
D
D
D
D
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
IR
R
IR
R
IR
R
IRR
16.09
11.08
12.03 13.69
16.01
16.68
.38
17.72
16.81
15.59
12.56 11.81
.19
.3711
.5913 .4514
.9815 .29
.52
.10 11
.0611 .97
.80
.30
.18
12.38
11.65
10.91
.23
.14
.17
.21
.21
.01
.14
.00
.1411
.6612 .49
.45
.3911
.2612 .0213
.24
.23
.81
.75
.82
.61
.42
.42
.87
14.63
14.35
.14
.4014
.40
.77
.98
.61
.16
.86
.08
.09
.64
.33
.98
.11
.68
16.32
.43
12.10
11.53
.12
.0
.4
.32
.05
.77
.18
16.28
.57
.84
.12
.2019
.88
.25
.43
.87
.99
.51
17.91
19.86 20.12
20.22
.32
.52
.26
.76
.08
.15
.23
.22
16.08
16.03
15.94
15.92
15.98
.0
.1
.2
.31
.24
.15
.06
.92
.79
.78
.78
15.73
15.08
14.99
.11
.2
.47
.49
.50
.5
415.5215.47 15.41
15.67
15.52
.6
0 15 .6
.5
.5
.4
.3
.22
.1
.11
15.85
15.76
15.67
15.75
15.82
15.88
16.07
16.61 16.29
16.9116.55
16.84 17.34
17.46 17.01
17.18 17.60
16.34
16.28
.16
16.21
16.11
15.95
15.83
15.74
15.72
15.84
15.92
15.74
15.78
15.86
15.99
15.78
15.81
15.73
15.62
.17
16.62
16.79 16.38
16.35 16.73
17.12 16.91
16.96
17.15
.7
17.07
.58
16.59
17.02
17.21 17.69
17.23
17.31
17.39
17.27
17.74
16.93 17.3716.86
17.30
16.79
16.70
.06
.20
.54
17.78
17.88
.8717 .77
17.83
.80
.7
17.70 17.75
17.72
17.78
17.85
.6
.6 8 17.77
17.98
18.11
18.02
18.28
17.81
17.91
17.61
17.82
16.69
16.74
.9
.0
.6
.69
.6
.59
.08
16.60
16.70 17.20
16.86
17.02 17.52
17.6017 .1
.68
16.65
.54
16.52
16.34
.5
16.61
16.55
16.61
16.46 16 .74
16.73
.14
.62
16.11
.74
.64
16.14
.65
16.66
16.21
.7
.7
.24 16
.31
.7
.7
.28
.21
.72
.28
16.6016.68
.21
.33
16.70
.34
.62
.22
17.66
17.95
17.98 17 .99
.36
.33
17.59
17.08 17
.01
16.40
16.3916 .8416.22
.10
16.58
.96
.4
16.23
.7416.21
.29
.83
15.7816.18
15.84
.35
.98
.5916 .08
.4
616.02 16.00
.55
.84
.81
.77
.85
.93
.87
16.85
.36
.27
.30
.89
16.03
.14
.04
.90
.30
17.80
18.14
17.85 17.85
18.13
.8
.6417.62
.28
.92
.71
16.68
16.9716 .71
.16
.09
.54
.91
.70
.6816
.6
.13
.26
16.6216.62
16.65
16.63
16.55
16.60
16.22
.36
.44
20.22
19.90
.62
.69
19.55
19.64
19.83
20.02 20.11
.1
20.16
.08
.50
16.89
.88
.3617
.34
14.86
14.96
15.11
.66
17.04
16.80
16.76
.5
15.51 15.56
15.61
16.16
16.1415.74 15.73
15.07
14.99 14.94
15.30
17.30
17.75
16.50
.58
.0
16.68
16.96 16.69
13.28
11.82 11.21
14.36
D
D
D
D
D
D
D
D
D
D
D
D DD D
Unknown
D
D
D
LA
N
D S
U R
VE
YO
R S
AN
D
L
AN
D P
LA
N
N
ER
S
T. C. MULLIN
SHEET:
JOB NUMBER:
APPROVED BY:
G. P. WILLIAMS
FIELD BOOK/PAGES
GPS COLLECTED
DRAWN BY:
SCALE:
1" = 20'
DATE:
07/06/2022
R E V
IS
IO
N S
B Y
D A T E
C
ER
TI
FI
C
AT
E O
F
AU
TH
O
R
IZ
AT
IO
N N
O . L
B
PH
O
N E
(5
) 4
-7
V
IS
TA
P
AR
KW
AY
, S
U
IT
E
W
ES
T
PA
LM
B
EA
C
H , F
LO
R
ID
A
W eb
S ite
: w w w .fr ss ur ve y.
co m
N O
R T
H
FDC
= BELLSOUTH TELEPHONE MANHOLE
= SIAMESE CONNECTION
= WATER SPRINKLER VALVE
= WATER GATE VALVE
= FIRE HYDRANT
= CABLE TELEVISION RISER
= CURB INLET
= CATCH BASIN
= POSTED SIGNS
= ELECTRIC BOX
= CONCRETE LIGHT POLE
= BELLSOUTH TELEPHONE RISER
= SANITARY MANHOLE
GV
S
CTV
HYD
SCV
= EXISTING DRAINAGE PIPE
= EXISTING SANITARY SEWER PIPE
= EXISTING WATER MAIN PIPE
D
S
W
= EXISTING GUARDRAIL
= EXISTING FIBOR OPTIC LINE
= EXISTING BURRIED ELECTRIC LINE
FO
BE
= EXISTING BURRIED ELECTRIC LINEIRR
= EXISTING UNKNOWN LINEUNK
4" PVC PIPE
TOP EL. = 14.18
INVERT EL. = 13.81
4" PVC PIPE
TOP EL. = 14.17
INVERT EL. = 13.80= EXISTING GAS LINEGAS
CATCH BASIN
RIM EL. 17.26
INV. EL. 13.74 (SW)
CATCH BASIN
RIM EL. 17.17
INV. EL. 13.17 (NE)
INV. EL. 13.17 (SW)
CATCH BASIN
RIM EL. 14.02
INV. EL. 12.62 (NE)
INV. EL. 12.62 (SW)
" R
.C .P
" R
.C .P
" R
.C .P
= WIRE PULL BOX
= EMERGENCY CALL BOXECB
WPB
CATCH BASIN
RIM EL. = 15.49
INV. EL. = 7.12 (N) 48" R.C.P.
INV. EL. = 6.52 (S) 24" R.C.P.
24" R.C.P. OUTFALL
INV. EL. = 6.05
E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:46 AM, AutoCAD PDF (High Quality Print).pc3, BUS
TOB
TOB TOB TOB
TOB
TOB
TOB
TOB
TO
B
TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB
TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB
TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE
TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE TOE
D
YD
YDYD
YD YD YD
H R
H R
HR
HR
Gate
Gate
GV
WM
ICV
GV
GV
HY
D
RP
Z
WPB
WPB
WPB
WPB
WPB
WPB
WPB Building B-7
Building B-4
13 14
17 18
14 14
W W
W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
W
W
W
W
W
W
W
W
W
W
W
W
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BEBE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBEBE
BE
BEBEBEBE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BEBE
BE
BEBE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
UNK
UNK
UNK
UNK
UNKUNK
UNK
BE
BE
IR
R
IR
R
IR
R
IRR
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
U N
K U
N
K BE
BE
BE
.59
.67
.76
.66
16.21
.1411
.6612 .49
.45
.39
.57
.28
.23
.67
.90
.85
.96
.06
.32
.73 14
.81 16 .32
.93
15.88
.07
.21
16.14
16.20
.34
.15
15.98
.86
.93
.70
.53
.8
.94
.32
.2
716.37
.54
16.5916.70
16.5616.65
16.69
16.7916.90
16.80
.75
16.78
16.75
16.03
.67
.80
16.14
16.31
.97
.11
.2
16.49 16.27
15.85
16.12 15.67
.80
16.1616 .3
.91
16.13 16.5816.27
16.37
.68
14.66
.3414.32
14.64
.64
.94 14
.94
.68
14.63
14.99
.94
.86
14.60
.66
.97
.93
.47
.88
.45
14.87
.9
.00
.05
14.97
.82
.94
15.14
.37
.50
15.23
14.99
.56
15.79
.08
.8
.8
.06
.9
.9
16.03
.3615 .9
15.60 15.41
16.28
15.88
.3715.96
15.84
.22
.34
.7115.02
.72
.6
.01
.81
.53
.81
.3914
.84
.52
.44
.40
.88
.69
.76
.53
.33
.20
.45
.81
.83
.77
.65
.46
.91
.75
.12
.41
.45
.29
14.28
.34
.58
.54
.66
.65
.16
.74
.51
.83
.67
.90
.92
.9215
.3
.53
15.84
.43 13
.95
.53
.73 14
.14
.30
.46
15.98
.82 14
.87
.44
.3014
.8315 .62
.94
.69
.17
.35
.54
.60
16.36
.21
.08
.29
16.78
.74
16.71
16.86
17.19
17.38
17.70
18.02 18 .11
.77
17.44
17.14
17.02
16.74
16.73
16.66
16.72 16.72
16.60
16.59
16.68
16.77
16.73 16.77
16.86 17.01
16.77
16.99
17.31
17.41
.57
.20
.63
.62
16.78
.84
16.90
.91
.76
.67
.78
.66
.90 16
.87
.00
.06
.25
.12
.40
.52
.58
.38
.11
19.70
.5
19.49
19.47
19.71
19.74
19.34
.83
18.23
17.64
.7919
.69
.70
.85
19.83
.65
.59
19.84
19.54
19.46
19.47
.99
.95
.9
.29
.70
18.56
.54
.5218
.46
18.51 18.52
19.03
.49
.86
.7719.80
19.77
19.41
18.93
18.93
.04
19.42
.67
.68
.69
.85
.89
19.00
19.04
.32
.4
.7
19.52
.16
18.72
.34
.1
.76
.14
.27
.93 18.04
.00
.7
.99
.26
.2
.95
.5
17.45 18.07
17.67
18.27 17.94
18.38 18.01
18.1518.52
.72
.35
18.44
.84
.06
18.65
18.51
.9
.5
.91
.60
18.47
18.3018.72 18.61
18.25 18.21
18.26
.08
18.39
.38
.02
.8614
.6
11.94
11.59 11.56
.6
.91
.61
14.41 14.38
11.60
.49
11.05
.93
.15
.37
.45
.51
18.83
18.37
18.62
.71
18.9218.97
18.97
19.04
18.90 18.86
18.93 19.08
19.26
19.21
19.34
18.73
.97
18.75
18.71
18.58 18.58
18.46 18.34
18.07 18.19
19.37
20.67
.36
22.3621.12
21.83
22.11
.27
.30
.57
.4819
.80
.23
.67
.17
.05
.37
.42
.68
.8115
.14
.36
.94
.0714
.76
.72
.74
.47
.28
.0814 .96
.94
.09
.44
.47
.19
.17 15
.7815 .05
.31
.55
.36
.23
.06
.13
.06
.02
.93
.03
.55
.64
.01
.73
.74
.07
.60
.12
.69
.98
.23
.81
.75
.82
.79
.61
.42
.42
.87
.24
.0
11.33
11.2211.56
12.72
.79
.05
.65
.34
.81
18.62
.20
20.11
.95
.18
.09
.88
.25
.43
.87
.16
.42
.99
.77
.43
.28
.68
.51
17.91
19.86 20.12
20.22
.32
.52
.26
19.26
.95
.90 17
.65 17 .11
.01
.58
.11
19.06
.46
.40
.04
.07
.61
.7
.6416
.38
.22
.87
.71
.76
.92
.79
.72
.84
.91
.0
.64
.50
.22
.12
.9615
.9715 .9415
.72
.62
.39
.21
15.67
.21
15.23
.1
.25
15.52
.63
15.72
.83
15.89 15.86
.85
.9
15.90 15.98
.16
.28
.39
.62
.78
.78
15.73
15.08
.1
.11
15.13
15.23
.22
15.67
.7
.96
.94 16.53
.74
16.72
16.72
.78
.26
.24
.11
.16
.44
.50
.35
.18 16
.16
.13
.06
.00
.71
.45 15
.29
.56
.86
.20
.26
.39
.22
.89
.57
.96
.58
.30
.93
.91
.92
.83
.78
.76
.66
.78
.86
.99
.07
.2016
.2216 .36
.39
.49
.51
.48
.39
.37
.26
.51
.44
.39
.26 16.20 16
.02
.8
.79
15.73
15.78
.79
.86
.92
.96 16
.25
.23
.18
16.22
.75
.63
.20
.80
.90
.47
.97
.22
.75
.18
15.42 15.72
16.57 16.12
.78
.72
.77
16.82 16 .27
20.22
19.90
.62
.69
19.55
19.64
19.83
20.02 20.11
.1
20.21
20.19
20.16 20.24
20.30 20.30
20.23
.08
.50
16.89
.88
.8
.9
.9
.8
17.16
.64
.36
.4717
.53
.3617 .34
.1
.3
12.27
11.75
11.50 11.49
11.97
11.90
17.01
.05
.65
14.86
14.96
15.11
.66
15.08
.46
16.86
.86
16.62
.67
.53 16
.38
.30
.17
16.02
.84
.78
.87
.90
16.00
16.02
16.03
16.04
16.08
.62
.52
.45
.33
16.28
.12
18.80
18.85
18.92
15.07
14.99 14.94
15.30
17.16
19.29
17.76
17.44
17.12
16.83
.2
.24
.5
.0
17.90
.32
15.26
.92
16.24
15.78
.8914.67
14.52
14.9614.90
14.85
14.40
15.04
15.01
D D
D D
D D
D D
D D
D D
D D
D D
D
D
D
D
D
D
D
D
D
D
D DD D
Unknown
FO
FO
FO
FO
FO
FO
LA
N
D S
U R
VE
YO
R S
AN
D
L
AN
D P
LA
N
N
ER
S
T. C. MULLIN
SHEET:
JOB NUMBER:
APPROVED BY:
G. P. WILLIAMS
FIELD BOOK/PAGES
GPS COLLECTED
DRAWN BY:
SCALE:
1" = 20'
DATE:
07/06/2022
R E V
IS
IO
N S
B Y
D A T E
C
ER
TI
FI
C
AT
E O
F
AU
TH
O
R
IZ
AT
IO
N N
O . L
B
PH
O
N E
(5
) 4
-7
V
IS
TA
P
AR
KW
AY
, S
U
IT
E
W
ES
T
PA
LM
B
EA
C
H , F
LO
R
ID
A
W eb
S ite
: w w w .fr ss ur ve y.
co m
N O
R T
H
4" PVC PIPE
TOP EL. = 13.90
INVERT EL. = 13.53
4" PVC PIPE
TOP EL. = 13.81
INVERT EL. = 13.44
12" R .C
.P.
CATCH BASIN
RIM EL. 13.05
INV. EL. 7.90 (S)
CATCH BASIN
RIM EL. 14.32
INV. EL. 7.99 (N)
INV. EL. 7.99 (S)
24" R .C
.P.
" R
.C .P
CATCH BASIN
RIM EL. 16.36
INV. EL. 9.76 (NE)
INV. EL. 9.76 (SW)
18" R.C.P.
" R
.C .P
CATCH BASIN
RIM EL. 13.92
INV. EL. 9.33 (NE)
INV. EL. 9.33 (SW)
CATCH BASIN
RIM EL. 15.28
INV. EL. 8.55 (SW)
CATCH BASIN
RIM EL. 18.20
INV. EL. 10.85 (NE)
INV. EL. 13.30 (SE)
INV. EL. 10.85 (SW)
FDC
= BELLSOUTH TELEPHONE MANHOLE
= SIAMESE CONNECTION
= WATER SPRINKLER VALVE
= WATER GATE VALVE
= FIRE HYDRANT
= CABLE TELEVISION RISER
= CURB INLET
= CATCH BASIN
= POSTED SIGNS
= ELECTRIC BOX
= CONCRETE LIGHT POLE
= BELLSOUTH TELEPHONE RISER
= SANITARY MANHOLE
GV
S
CTV
HYD
SCV
= EXISTING DRAINAGE PIPE
= EXISTING SANITARY SEWER PIPE
= EXISTING WATER MAIN PIPE
D
S
W
= EXISTING GUARDRAIL
= EXISTING FIBOR OPTIC LINE
= EXISTING BURRIED ELECTRIC LINE
FO
BE
= EXISTING BURRIED ELECTRIC LINEIRR
= EXISTING UNKNOWN LINEUNK
= EXISTING GAS LINEGAS
= WIRE PULL BOX
= EMERGENCY CALL BOXECB
WPB
E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:49 AM, AutoCAD PDF (High Quality Print).pc3, TO
B
TOB
TOB
TOB
TOB
TOB
D
D
Gate
Gate
DDCV
GV
H
YD
H
YD
ICV
W
WPB
WPB
WPB
WPB
WPB
WPB
14 15 16
12 13 14
15141312
14 15
201918
13 14
15 16
19 20
W
W
W
W
W
W
W
W
W
W
W
W
W
D
D
D
D
D
D
D
W
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
UNK
UNK
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
BE
BE
BE
IR
R
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IRR
IRR
IRR
IRR
IRR
IRR
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
U N
K U
N K
U N
K
U N
K U
N K
U N
K U
N K
U N
K
UNK
UNK
D
D
D
D
D
D
D
D
D
D
D
D
D
D
BE
BE
BE
BE
BE
BE
BE
BE
BEBE
BE BE
BE
BE
BE
BE BE
BE
BE
BE
BE
BE
16.09
11.08
12.03 13.69
16.01
16.68
.38
17.72
16.32
.43
12.10
11.53
.12
.0
.4
.32
.05
.77
.18
16.28
.57
.84
.12
.06
.61
.4
.18
.93
.24
16.06
.87
.3
.54
11.02
.81
.55
.16
.47
11.06
16.61
16.9116.55
16.84 17.34
17.46 17.01
17.18 17.60
16.34
16.2816.62
16.79 16.38
16.35 16.73
17.12 16.91
16.96
17.15
.7
17.07
.58
16.59
17.02
17.21 17.69
17.23
17.31
17.39
17.27
17.74
16.93 17.3716.86
17.30
16.79
16.70
.06
.20
.54
17.78
17.88
.8717 .77
17.83
.80
.7
17.70 17.75
17.72
17.78
.6
.6 8 17.77
18.11
18.02
18.28
17.81
17.91
17.61
17.82
16.69
16.74
.9
.0
.6
.69
.6
.59
.08
16.60
16.70 17.20
16.86
17.02 17.52
17.6017 .1
.68
16.65
.54
16.52
16.34
.5
16.61
16.55
16.61
16.46 16 .74
16.73
.14
.62
16.11
.74
.64
16.14
.65
16.66
16.21
.7
.7
.24 16 .31
.7
.7
.28
.21
.72
.28
16.60
16.62
16.54
16.42
16.30
16.12
16.02
15.91
.79
16.02
16.19
16.38
16.59
16.61
16.68
.21
.33
16.70
16.39
.10
.80
.46
.46
.54
.61
.97
.06
.56
.02
.34
.62
.22
18.71
.66
.06
19.24
19.49
20.11
20.06
.4
.03
.43
17.50
17.66
17.95
17.98 17 .99
.36
.33
17.59
19.72
19.78 19.90
17.08 17 .01
17.96
.50
18.60
.08
.87
19.40
20.04
.53
.99
20.42
20.55
.57
20.72
.74
.68
.76
20.74
20.76
.7
20.45
20.33 20.4320.51
18.25
.5817 .7217.79
19.17
18.72
.36
.79
.30
.85
.47
.88
.2
.6
19.59
20.00
.19
19.63
.4
.6
.9
20.06
.0
.0
16.40
16.3916 .8416.22
.10
16.58
.96
.4
16.23
.7416.21
.29
.83
15.7816.18
15.84
.35
.98
.5916 .08
.4
616.02 16.00
.55
.84
.81
.77
.85
.93
.87
16.85
.36
.27
.30
.89
16.03
.14
.04
.90
20.09
19.82
19.87
19.90
20.26
20.27 20.28
20.65
.49
20.43 20.44
20.28 20.31
20.13
.89
19.77
.75
20.0920.08
20.15
.8419
.80
19.78
19.76
19.78
19.69
19.50
.0
19.56 19.99
19.75
19.80
19.81
.72
19.94
.77 20
.13
.46
.65
.48
.92
.31
.47
.20
.30
17.80
18.14
17.85 17.85
18.13
.8
.6417.62
17.04
16.80
16.76
.5
16.16
16.1415.74 15.73
.38
20.12 20.19
17.30
17.75
19.8720.1320.41
.0
19.86
19.66
16.50
.58
.0
13.28
11.82 11.21
D
D
D
D
D
D
D
D
D
D
D D
D D
D
D
D
D
D
D
D
LA
N
D S
U R
VE
YO
R S
AN
D
L
AN
D P
LA
N
N
ER
S
T. C. MULLIN
SHEET:
JOB NUMBER:
APPROVED BY:
G. P. WILLIAMS
FIELD BOOK/PAGES
GPS COLLECTED
DRAWN BY:
SCALE:
1" = 20'
DATE:
07/06/2022
R E V
IS
IO
N S
B Y
D A T E
C
ER
TI
FI
C
AT
E O
F
AU
TH
O
R
IZ
AT
IO
N N
O . L
B
PH
O
N E
(5
) 4
-7
V
IS
TA
P
AR
KW
AY
, S
U
IT
E
W
ES
T
PA
LM
B
EA
C
H , F
LO
R
ID
A
W eb
S ite
: w w w .fr ss ur ve y.
co m
N O
R T
H
DRAINAGE MANHOLE
RIM EL. 16.12
INV. EL. 7.42 (NE)
INV. EL. 12.26 (NW)
INV. EL. 6.92 (W)
" R
.C .P
15" H.D.P.E.
DRAINAGE MANHOLE
RIM EL. 19.13
INV. EL. 11.33 (NE)
INV. EL. 11.03 (SW)
" R
.C .P
12" R.C.P.
" R
.C .P
CATCH BASIN
RIM EL. 17.26
INV. EL. 13.74 (SW)
CATCH BASIN
RIM EL. 17.17
INV. EL. 13.17 (NE)
INV. EL. 13.17 (SW)
CATCH BASIN
RIM EL. 14.02
INV. EL. 12.62 (NE)
INV. EL. 12.62 (SW)
" R
.C .P
" R
.C .P
CATCH BASIN
RIM EL. 16.71
INV. EL. 12.31 (NE)
INV. EL. 12.31 (SE)
INV. EL. 12.31 (SW)
12" R.C.P.
CATCH BASIN
RIM EL. 17.88
INV. EL. 12.61 (NW)
INV. EL. 12.52 (SE)
" R
.C .P
18" P.V.C.
" P
.V .C
CATCH BASIN
RIM EL. 19.18
INV. EL. 13.48 (NE)
INV. EL. 13.48 (SE)
INV. EL. 13.48 (SW)
CATCH BASIN
RIM EL. 19.18
INV. EL. 12.76 (NE)
INV. EL. 12.76 (NW)
FDC
= BELLSOUTH TELEPHONE MANHOLE
= SIAMESE CONNECTION
= WATER SPRINKLER VALVE
= WATER GATE VALVE
= FIRE HYDRANT
= CABLE TELEVISION RISER
= CURB INLET
= CATCH BASIN
= POSTED SIGNS
= ELECTRIC BOX
= CONCRETE LIGHT POLE
= BELLSOUTH TELEPHONE RISER
= SANITARY MANHOLE
GV
S
CTV
HYD
SCV
= EXISTING DRAINAGE PIPE
= EXISTING SANITARY SEWER PIPE
= EXISTING WATER MAIN PIPE
D
S
W
= EXISTING GUARDRAIL
= EXISTING FIBOR OPTIC LINE
= EXISTING BURRIED ELECTRIC LINE
FO
BE
= EXISTING BURRIED ELECTRIC LINEIRR
= EXISTING UNKNOWN LINEUNK
= EXISTING GAS LINEGAS
= WIRE PULL BOX
= EMERGENCY CALL BOXECB
WPB
E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:53 AM, AutoCAD PDF (High Quality Print).pc3, BU
S
YD
YD
YD
YD
D
D
D
GV
DDCV
HYD
GV
FDC
FDC
GV
GV
IC
VIC
V
FD
C
FD
C
HY
D
GV
WPB
WPB
WPB
WPB
X
X
X
X
GATE
Building B-12
B-7
Building B-3 Pa rk ing G ar ag e
G
AT
E
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
D
D
D
D
D
D
D
D
D
D
D
D
D
D
W
W
W
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
UNK
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
BE
BE
BE
BE
IR
R
IR
R
IRR
IR
R
IR
R
IR
R
IR
R
UNK
BE
BE
BE
BE
.77
20.77
20.76 20.72
.58
20.50
20.6620 .59
.38
.3
19.69
19.72
18.34
.11
18.26 18.37
18.62
18.9218.97
18.97
19.04
18.90 18.86
18.93 19.08
19.26
19.21
19.34
19.40
18.73
.97
18.75
19.18
19.7019.88 19.98
20.35 20.42
20.20
20.26
19.37
19.46
20.28 20.42
20.33
20.16
20.09
19.83
19.87 19.60
19.63
19.2819.18
19.14 19.34
19.38
19.40
19.2519.14
19.12
.23 19 .38
.96
18.90
18.7118.72
18.58 18.58
18.92
18.46 18.34
18.07 18.19
.4819
.80
.95
20.62
.58
20.40
.50
.57
.44
.49
.25
.16
.20
.22
.25
.30
.51
.1
20.27
20.43
20.18 20.3020
.48
.56
.47
.44
.38 20
.12
.27
.24
.37
.49
20.47
20.46
.46
20.55
.58
20.60
.5
20.61 20.54
20.51
20.48
20.58
20.64
.81
20.11
.95
.18
.09
.52
.26
.04
.09
.24
.60
.50
.27
17.08 15.48
15.79
18.31
15.89
19.08
16.00
20.09
20.80 16.11
16.28
20.80
16.42
16.40
16.52
16.3820.84
20.7916.46
.39
20.76
16.66 20.85
.50
.50
.55
16.35 18.50
16.32 17.73
17.0516.24
16.16 16.93
16.7716.24
16.23 16.22 16.61
16.52
.1
.0
16.4515 .9
15.86
15.96
15.87
15.75
16.43
16.43
16.42 16.45
.24
.33
17.40
18.34
18.36
19.77 19.81
19.88
.1
.39
.73
.6
20.31
20.34
20.27
20.23
.21
20.22
20.18
20.30 20.22
19.90
.62
19.64
19.83
20.02 20.11
.1
20.21
20.19
20.16 20.24
20.30 20.30
20.23
20.33 20.35
20.35
20.34
.2
20.28
.33
20.20
.21
.25
.23
.24
.25
.24
.43
.45
.50
.30
.83
.08
.50
.69
.29
.00
.79
.69
.75
.13
.43
.36
.30
.74
.4
.32
.14
.91
19.78 19.82
19.96
20.31
.31
.07 20
.10
.86
18.80
18.85
18.92
16.89 16.77
.58
.08
.04
17.95
17.42
16.84
16.59
.4
.4
.4
.5515.85
15.76
.2
.8
.8 416.78
16.35
16.38
16.91
.01
16.4015.96
.8
.92
DD
D D
D
D
D
D
D
D
D
LA
N
D S
U R
VE
YO
R S
AN
D
L
AN
D P
LA
N
N
ER
S
T. C. MULLIN
SHEET:
JOB NUMBER:
APPROVED BY:
G. P. WILLIAMS
FIELD BOOK/PAGES
GPS COLLECTED
DRAWN BY:
SCALE:
1" = 20'
DATE:
07/06/2022
R E V
IS
IO
N S
B Y
D A T E
C
ER
TI
FI
C
AT
E O
F
AU
TH
O
R
IZ
AT
IO
N N
O . L
B
PH
O
N E
(5
) 4
-7
V
IS
TA
P
AR
KW
AY
, S
U
IT
E
W
ES
T
PA
LM
B
EA
C
H , F
LO
R
ID
A
W eb
S ite
: w w w .fr ss ur ve y.
co m
N O
R T
H
CATCH BASIN
RIM EL. 18.20
INV. EL. 10.85 (NE)
INV. EL. 13.30 (SE)
INV. EL. 10.85 (SW)
" R
.C .P
CATCH BASIN
RIM EL. 19.00
INV. EL. 11.60 (NE)
INV. EL. 11.60 (SW)
" R
.C .P
DRAINAGE MANHOLE
RIM EL. 20.24
INV. EL. 11.54 (NE)
INV. EL. 13.04 (SE)
INV. EL. 16.09 (S)
INV. EL. 13.34 (SW)
INV. EL. 13.04 (W)
18" H.D.P.E.
DRAINAGE MANHOLE
RIM EL. 20.64
18" H .D
.P.E.18 " H
.D.P.E.
8" P.V.C.
FDC
= BELLSOUTH TELEPHONE MANHOLE
= SIAMESE CONNECTION
= WATER SPRINKLER VALVE
= WATER GATE VALVE
= FIRE HYDRANT
= CABLE TELEVISION RISER
= CURB INLET
= CATCH BASIN
= POSTED SIGNS
= ELECTRIC BOX
= CONCRETE LIGHT POLE
= BELLSOUTH TELEPHONE RISER
= SANITARY MANHOLE
GV
S
CTV
HYD
SCV
= EXISTING DRAINAGE PIPE
= EXISTING SANITARY SEWER PIPE
= EXISTING WATER MAIN PIPE
D
S
W
= EXISTING GUARDRAIL
= EXISTING FIBOR OPTIC LINE
= EXISTING BURRIED ELECTRIC LINE
FO
BE
= EXISTING BURRIED ELECTRIC LINEIRR
= EXISTING UNKNOWN LINEUNK
= EXISTING GAS LINEGAS
= WIRE PULL BOX
= EMERGENCY CALL BOXECB
WPB
E:\Survey Jobs\VA Hosp\Civil 3D Drawings\17-006.B VA HospitalTopo Survey.dwg, 12/15/2022 10:12:56 AM, AutoCAD PDF (High Quality Print).pc3, HYD
GV
ICV
ICV
W
WPB
WPB
WPBWPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
WPB
14 14
14 14 14
15 15
WWWWWWWW
WWW
WWWWWWWWWW
W
W W
W W
W
D
W
W
W
W
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BEBE
BE
BE
BE
BE
BE
BE
BE
BE
BEBE
BEBEBE
BE BE BE BE BE BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
UNK
UNK
UNK
UNK
UNK
D D
D
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
.3
.5
16.40
16.38
.5
.3
.77
19.98 18 .34
.2
.84
15.63
15.63
.80
.92
15.80
15.88
.07
15.93
.63
.38
15.79
16.03
.67
14.03
13.85
13.76
.00 14.61
14.59
.68
14.66
.3414.32
.75
.35
.44
.09
.47 15
.41
.93
.22
.74
.54
13.72
.12
.82
.32
13.5514 .49
.8313
.66
13.23
13.90
14.96
.30
.89
.50
.23
13.7413 .66
.88
.51
.65
.16
.74
.94
.03
.15
.64
.9614
.8514 .32
.60
.92
.28
.58
.87
.81
.76
.2
.87
16.73
.50
.28
.10
.22
.35
.66
.49
.28
.10
.14
.34
.60
.75
16.61
15.64
15.68
.02
.88
.27
.3315
.51
15.82
16.33 16.34
16.26
.97
.79…
This is the start of the file's text. The full file is on GovTribe.