Exit Control Booth - Pacific Highway Border Station, Blaine, WA
Solicitation number
ExitControlBooth_10PZ1_08_0222
Issued by

About this file

Amendment 03

View the file

Other files

File Type Posted
sf25_f.pdf PDF
Sf25a.pdf PDF
A02 Amendment to Solicitation SF30.pdf PDF
A01 Amendment to Solicitation SF30.pdf PDF
Exit Control Booth Solicitation GS-10P-09-XA-C-0003.pdf PDF
PBS 3490_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED

(SEE

ITEM

11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SECTION 00700

00700. 1 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

Table of Contents

SECTION 00700

00700. 1 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of ($0.00) for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of Clause)

Bidder Inquiries, Clarifications and Responses

CBP Exit Control Booth, Blaine, WA

10PZ1-08-0222

This solicitation is being amended to extend the bid proposal due date by two days to allow for responses to additional inquiries, and due to the January 19, 2009, Federal Holiday. All federal agencies will be closed and therefore no deliveries will be able to be accepted.

Bids/Proposals are now due January 22, 2009 at 5:00pm (PST).

RFI #5: We have a question in regards to the liquidated damages on the Exit Control Booth project. The specs say that the amount will be determined. It is generally found that this number is determined prior to bid date. Do you know what the amount of the liquidated damages will be?

There will be no liquidated damages accessed on this acquisition. Clause 52.211-12., Liquidated Damages—Construction (Sep 2000) will be updated. (See attached)

RFI #6: I got the documents and the disk of drawings for this job Exit Control Booth Pacific Hwy Border that bids on 01/20/09. I can not see what the engineers estimated costs are for this job.

The Magnitude of Construction for this project is between $100,000 and $250,000.

RFI #7: I need it to fill out paperwork and order my Bid Bond, what forms am I to use?

In accordance with 52.228.15, Performance and Payment Bonds—Construction (Nov 2006), Standard Form 25 for Performance Bonds Standard Form 25A for Payment Bonds

RFI #8: Attachment A2, Past Performance/Relevant Experience. Do I have to use the exact form, or just provide all the information?

You may use either the exact form or your own document; as long as all the information is included. Please keep it in the same order #1 through #9.

RFI #9: I have a question regarding submission of the Proposal for the Exit Control Booth Project in Blaine WA. It states in Attachment A1, Section 5.1: Hard Copy, electronic or facsimile submission of the proposal is acceptable. Then it states The Offeror shall provide 4 copies to include one original of both Volume I and Volume II. If we choose to submit our proposal electronically by 5:00 pm January 20, 2009 and name the document files by copy or original (which contains electronic signature) will we also be required to provide hard copies?

GSA apologizes for the conflict in which we asked for proposals to be submitted. Hard Copies are needed in order to give them to the evaluation team.

Section 5.1 is amended to read as follows:

“Hard copy, electronic or facsimile submission of the proposal is acceptable; however the electronic or facsimile submission must also be accompanied by the 4 hard copies. Proposals must be received no later than January 22, 2009 5:00pm (PST). Due to electronic processing, the number of pages identified on the solicitation may not be accurate.”

The following outlines how to assemble your offer. Please note that we require two separate volumes, one shall contain pricing information and contract documents, the second shall contain all other than price information. Please do not include any pricing information in Volume II.

“However to save on the cost, you will also be permitted to submit all the information as requested below in one binder, separated into 2-Tabs (Volume I, and Volume II) This will allow for you to submit only 4 hard copy binders (1- Original and 3 Copies), instead of 8 that was anticipated by four copies of each volume below. All the same information must be included in each Tab.”

VOLUME I (May be tabbed): CONTRACT FORMS AND PRICING – FACTOR 3

THE OFFEROR SHALL PROVIDE 4 COPIES TO INCLUDE ONE ORIGINAL OF THE

FOLLOWING

Contract Forms: Include the following data in this volume in the format indicated. Designate on the volume cover, which proposal package contains the original, executed copy of the RFP.

Section 1 – Proposal forwarding letter, to include designation of who has authority to submit information and signature authority to contractually commit your company.

Section 2 – A complete copy of this RFP (less attachment) with the original signature of an official authorized to contractually bind the offeror in block 20 of the SF 1442.

The offeror must complete the following sections within the RFP:

o Part I, Section A (SF 1442, Blocks 14-20c).

o Part I, Section B (SCHEDULE)

Section 3 – Any exceptions to or deviations from any of the clauses or special contract requirements along with justification therefore.

Section 4 – Any information which does not properly belong within the other proposal volumes.

VOLUME II (May be tabbed): – FACTORS 1 and 2

THE OFFEROR SHALL PROVIDE 4 COPIES TO INCLUDE ONE ORIGINAL OF THE

FOLLOWING:

Section 1 – Factor 1: Technical/ Quality Capability

Section 2 – Factor 2: Past Performance

IDCode:
EffDate: JAN 16, 2009
ReqNo: 10PZ1-08-0222
ProjNo:
IssuedBy: GSA, NORTHWEST ARCTIC REGION

AUBURN PMO, 10PZ1F

400 15TH STREET SW

AUBURN WA 98001-6599

AdminBy: GSA, NORTHWEST ARCTIC REGION

WESTERN SERVICE CENTER, 10PZ1

JFB, 915 SECOND AVENUE Ste. 390

SEATTLE WA 98174-1001

NoCopies:
Amended: Yes
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: EXIT CONTROL BOOTH PACIFIC HIGHWAY BORDER STATION, BLAINE, WA

This solicitation is being amended to extend the bid proposal due date by two days to allow for responses to additional inquiries, and due to the January 19, 2009, Federal Holiday. All federal agencies will be closed and therefore no deliveries will be able to be accepted.

Bids/Proposals are now due January 22, 2009 at 5:00pm(PST).

Please see attachment, Request for Information.

SignName:
SignTitl:
ContDate:
CODate:
OffrExt: Yes
OffrNoEx: Off
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off
ContractorCode:
FacCode:
ContractorPOC:
AwdChg: Off
SolChg: Yes
SolNo: GS-10P-09-XA-C-0003
SolDate: DEC 05, 2008
AwdNo:
IssuedByCode: 10PZ1F
AdminByCode: 10PZ1
ContrOfficerInfo:
DocNo: A03
AwdDate:
text1: 10B. DATED (SEE ITEM 13)
block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
pageblock: PAGE OF PAGES
block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Contractor:
ContratorInfo:
ModAmount:
block12: 12. ACCOUNTING AND APPROPIATION DATA (If required)
ApprData: See Schedule