A02 Amendment to Solicitation SF30.pdf

PDF 300 KB Posted

Attached to
Exit Control Booth - Pacific Highway Border Station, Blaine, WA
Solicitation number
ExitControlBooth_10PZ1_08_0222
Issued by

View the file

Other files

File Type Posted
A03 Amendment to Solicitation SF30.pdf PDF
sf25_f.pdf PDF
Sf25a.pdf PDF
A01 Amendment to Solicitation SF30.pdf PDF
Exit Control Booth Solicitation GS-10P-09-XA-C-0003.pdf PDF
PBS 3490_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED

(SEE

ITEM

11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Bidder Inquiries and Responses

CBP Exit Control Booth, Blaine, WA

10PZ1-08-0222

RFI #1: I need additional information on the Illuminated Sign w/ Red/Green/Stop/Go Lights (shown on Booth Lighting E2). I need a better description and a Manufacturer/catalog number. I could not find anything in the drawings or specs.

Provide one horizontal red/green lenses on the side of booth facing oncoming traffic. Product shall be Howard Industries TCILH or equal with minimum red and green light lens diameter of 5” and light housing with standard manufacturer color and finish.

RFI #2: On drawing A2, First Floor Plan View, there is a note pointing to two windows; Horiz.

Sliders. Please clarify the sliding window and door design intention.

Design intent is to have a sliding door option that includes a side sliding window on the upper portion of the door (this would be used at the lower/car level location). Design intent for sliding windows in the booth are a sliding window at the upper truck counter area on south side of booth, and two sliding/operable windows on the north side of the booth. These would all be provided by the booth manufacturer as part of the booth/booth package. Sizes and exact configuration of windows are flexible and can be to suit the manufacturer’s standard available size and frame type to provide visibility of traffic for the occupants.

RFI #3: On drawing A2, First Floor Plan View, there is a plan note indicating a Red/Green Stop/Go lights and on E2, Booth Lighting Plan there is a plan not indicating Red/Green/Stop/Go lights on the front of the building. Do you want (2) traffic lights? I will need manufacturer info on both theses lights.

See RFI #1 response above

RFI 4: What is the floor finish to be in the booth?

The finish floor shall be the standard floor finish material from the booth manufacturer.

IDCode:
EffDate: JAN 12, 2009
ReqNo: 10PZ1-08-0222
ProjNo:
IssuedBy: GSA, NORTHWEST ARCTIC REGION

AUBURN PMO, 10PZ1F

400 15TH STREET SW

AUBURN WA 98001-6599

AdminBy: GSA, NORTHWEST ARCTIC REGION

WESTERN SERVICE CENTER, 10PZ1

JFB, 915 SECOND AVENUE Ste. 390

SEATTLE WA 98174-1001

NoCopies:
Amended: Yes
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: EXIT CONTROL BOOTH Œ PACIFIC HIGHWAY BORDER STATION, BLAINE WA.

This solicitation is being amended to answer serveral Request for Information (RFI). The solicitation due date is NOT being extended. Bids/Proposals are due January 20, 2009 at 5:00pm (PST).

Please see attachement Request for Information (RFI'S).

SignName:
SignTitl:
ContDate:
CODate:
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off
ContractorCode:
FacCode:
ContractorPOC:
AwdChg: Off
SolChg: Yes
SolNo: GS-10P-09-XA-C-0003
SolDate: DEC 05, 2008
AwdNo:
IssuedByCode: 10PZ1F
AdminByCode: 10PZ1
ContrOfficerInfo:
DocNo: A02
AwdDate:
text1: 10B. DATED (SEE ITEM 13)
block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
pageblock: PAGE OF PAGES
block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Contractor:
ContratorInfo:
ModAmount:
block12: 12. ACCOUNTING AND APPROPIATION DATA (If required)
ApprData: See Schedule
Pages: 2
Page: 1

File details come from the government source that posted it. Updated .