Exit 238 Paving Plans_Signed~1.pdf

PDF 1 MB Posted

Attached to
R2 Paving RFB - I5 Exit 233 Ramp Paving
Solicitation number
S-73000-00013248
Issued by
Lake County, Oregon

About this file

This is a paving plan document prepared by the Oregon Department of Transportation (ODOT) for the I5 Exit 238 Ramp Paving project located on Pacific Highway in Linn County. The project encompasses paving work on four ramps—northbound on/off ramps and southbound on/off ramps—with specific work limits defined by existing pavement joints, gore points, bridge locations, and sidewalk edges. The scope includes replacement of 3-inch Continuously Placed Portland Roller (CPPR) surfacing totaling 22,731 square yards, installation of 12-inch dense asphalt concrete pavement (3,836 tons combined), and complete replacement of pavement markings in like colors and widths per ODOT standards TM500, TM501, TM502, and TM503. Work west of I5 comprises 12,590 square yards of CPPR and 2,125 tons of dense ACP, while work east of I5 comprises 10,141 square yards of CPPR and 1,711 tons of dense ACP. Additional work includes in-kind replacement of rumbles on the northbound ramps and replacement of directional arrows with elongated versions (8 arrows on the northbound side and 4 arrows on the southbound side). The plans were prepared by Cody G. Stone, a registered professional engineer with ODOT, and finalized in February 2025.

The plan document provides detailed technical specifications and site-specific instructions organized across three sheets (A01, A02, and A03), with a vicinity map showing the project location at Exit 238 and detailed intersection paving limits for both northbound and southbound ramp approaches. All paving limits are defined as extending from outside paint to outside paint, establishing clear boundaries for contractor work. The document indicates that final electronic versions of the complete plan set are available upon request from ODOT Region 2 Maintenance division.

View the file

Other files

File Type Posted
Exit 233 Paving Plans_Signed~1.pdf PDF
00013248_bid tab.xlsx XLSX spreadsheet
00013248_RFB.xlsx XLSX spreadsheet
00013248_RFB_3.26.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EP

EP

EP

EP

EP

EP

EP

EP

EP

EPEPEP EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EPEP

EP

EP

EP

EP

EP

EP

EP

EP

EPEP

EP

EP

EP

EP

EP

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 238 RAMP PAVING\CAD\EXIT 238 PLAN.DWG 19-Feb-2025 09:20 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

I5 EXIT 238

RAMP PAVING

PACIFIC HIGHWAY

LINN COUNTY

HWY:

M.P.:

DATE

County Name

FEB/25 A01

na na

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T

RAN S P OR T A T I ON

OREGON

EXPIRES: 06-30-2026

99533PEREG

ISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

VICINITY MAP

NB ON RAMP

NB OFF RAMP

SB OFF RAMP

SB ON RAMP

NORTHERN LIMIT AT

EXISTING PAVEMENT JOINT

NORTHERN LIMIT AT GORE POINT

SOUTHERN LIMIT AT BRIDGE

SEE SHEET A02 FOR

MORE DETAILS

SEE SHEET A03 FOR

MORE DETAILS

ALL PAINT TO BE REPLACED WITH LIKE COLORS

AND WIDTHS, AND INSTALLED PER TM500,

TM501, TM502, AND TM503, TYP

ALL PAVING LIMITS ARE OUTSIDE OF

PAINT TO OUTSIDE OF PAINT, TYP

WEST OF I5:

3" CPPR, 12,590 SQYDS

3" LEVEL 3, 12" DENSE ACP, 2,125 TON

EAST OF I5:

3" CPPR, 10,141 SQYDS

3" LEVEL 3, 12" DENSE ACP, 1,711 TONS

Dat

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

County Name

FEB/25 A02

na na

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T

RAN S P OR T A T I ON

OREGON

EXPIRES: 06-30-2026

99533PEREG

ISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 238 RAMP PAVING\CAD\EXIT 238 PLAN.DWG 19-Feb-2025 09:20 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

I5 EXIT 238

RAMP PAVING

PACIFIC HIGHWAY

LINN COUNTY

HWY:

M.P.:

DATE NB ON/OFF RAMP

INTERSECTION

PAVING LIMIT IS FLUSH WITH

EASTERN EDGE OF EXISTING

RUMBLES. REPLACE RUMBLES IN

KIND (INCIDENTAL TO PAVING).

PAVING LIMIT IS FLUSH WITH

EASTERN EDGE OF EXISTING

RUMBLES. NO RUMBLES WOULD BE

REMOVED ON THIS END.

ALL PAVING LIMITS ARE OUTSIDE OF

PAINT TO OUTSIDE OF PAINT, TYP

REPLACE ARROWS WITH

ELONGATED VERSION, TYP

8 ARROWS THIS SIDE OF I5

ALL PAINT TO BE REPLACED WITH

LIKE COLORS AND WIDTHS, TYP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EPEP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

County Name

FEB/25 A03

na na

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T

RAN S P OR T A T I ON

OREGON

EXPIRES: 06-30-2026

99533PEREG

ISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 238 RAMP PAVING\CAD\EXIT 238 PLAN.DWG 19-Feb-2025 09:20 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

I5 EXIT 238

RAMP PAVING

PACIFIC HIGHWAY

LINN COUNTY

HWY:

M.P.:

DATE SB ON/OFF RAMP

INTERSECTION

ALL PAVING LIMITS ARE OUTSIDE OF

PAINT TO OUTSIDE OF PAINT, TYP

EASTERN PAVING LIMIT IS FLUSH

WITH THIS TREE. LIMITS TO BE

PAINTED BY AGENCY.

WESTERN LIMIT IS FLUSH WITH THE

END OF THE SIDEWALK

REPLACE ARROWS WITH

ELONGATED VERSION, TYP

3 ARROWS THIS SIDE OF I5

REPLACE WRONG WAY ARROW

1 ARROW THIS SIDE OF I5

ALL PAINT TO BE REPLACED WITH

LIKE COLORS AND WIDTHS, TYP

Sheets and Views
Exit 238 Plan-1 VIEW (22x34)
Exit 238 Plan-1 VIEW (22x34) (2) (2)
Exit 238 Plan-1 VIEW (22x34) (2) (2) (2)

File details come from the government source that posted it. Updated .