Exit 238 Paving Plans_Signed~1.pdf
PDF 1 MB Posted
- Attached to
- R2 Paving RFB - I5 Exit 233 Ramp Paving
- Solicitation number
- S-73000-00013248
- Issued by
- Lake County, Oregon
About this file
This is a paving plan document prepared by the Oregon Department of Transportation (ODOT) for the I5 Exit 238 Ramp Paving project located on Pacific Highway in Linn County. The project encompasses paving work on four ramps—northbound on/off ramps and southbound on/off ramps—with specific work limits defined by existing pavement joints, gore points, bridge locations, and sidewalk edges. The scope includes replacement of 3-inch Continuously Placed Portland Roller (CPPR) surfacing totaling 22,731 square yards, installation of 12-inch dense asphalt concrete pavement (3,836 tons combined), and complete replacement of pavement markings in like colors and widths per ODOT standards TM500, TM501, TM502, and TM503. Work west of I5 comprises 12,590 square yards of CPPR and 2,125 tons of dense ACP, while work east of I5 comprises 10,141 square yards of CPPR and 1,711 tons of dense ACP. Additional work includes in-kind replacement of rumbles on the northbound ramps and replacement of directional arrows with elongated versions (8 arrows on the northbound side and 4 arrows on the southbound side). The plans were prepared by Cody G. Stone, a registered professional engineer with ODOT, and finalized in February 2025.
The plan document provides detailed technical specifications and site-specific instructions organized across three sheets (A01, A02, and A03), with a vicinity map showing the project location at Exit 238 and detailed intersection paving limits for both northbound and southbound ramp approaches. All paving limits are defined as extending from outside paint to outside paint, establishing clear boundaries for contractor work. The document indicates that final electronic versions of the complete plan set are available upon request from ODOT Region 2 Maintenance division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exit 233 Paving Plans_Signed~1.pdf | ||
| 00013248_bid tab.xlsx | XLSX spreadsheet | |
| 00013248_RFB.xlsx | XLSX spreadsheet | |
| 00013248_RFB_3.26.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EP
EP
EP
EP
EP
EP
EP
EP
EP
EPEPEP EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EPEP
EP
EP
EP
EP
EP
EP
EP
EP
EPEP
EP
EP
EP
EP
EP
THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 238 RAMP PAVING\CAD\EXIT 238 PLAN.DWG 19-Feb-2025 09:20 HWYR20G
OREGON DEPARTMENT
OF TRANSPORTATION
Checker:Drafter:
Designer:
SHEET NO.
COUNTY Reviewer:
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
I5 EXIT 238
RAMP PAVING
PACIFIC HIGHWAY
LINN COUNTY
HWY:
M.P.:
DATE
County Name
FEB/25 A01
na na
Cody Stone
Cody Stone
O R
EG
ON
DE PAR TMEN
T
O F
T
RAN S P OR T A T I ON
OREGON
EXPIRES: 06-30-2026
99533PEREG
ISTERED PROFESSIONALENGINEER
MARCH 08, 2022CODY G. STONE
VICINITY MAP
NB ON RAMP
NB OFF RAMP
SB OFF RAMP
SB ON RAMP
NORTHERN LIMIT AT
EXISTING PAVEMENT JOINT
NORTHERN LIMIT AT GORE POINT
SOUTHERN LIMIT AT BRIDGE
SEE SHEET A02 FOR
MORE DETAILS
SEE SHEET A03 FOR
MORE DETAILS
ALL PAINT TO BE REPLACED WITH LIKE COLORS
AND WIDTHS, AND INSTALLED PER TM500,
TM501, TM502, AND TM503, TYP
ALL PAVING LIMITS ARE OUTSIDE OF
PAINT TO OUTSIDE OF PAINT, TYP
WEST OF I5:
3" CPPR, 12,590 SQYDS
3" LEVEL 3, 12" DENSE ACP, 2,125 TON
EAST OF I5:
3" CPPR, 10,141 SQYDS
3" LEVEL 3, 12" DENSE ACP, 1,711 TONS
Dat
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
County Name
FEB/25 A02
na na
Cody Stone
Cody Stone
O R
EG
ON
DE PAR TMEN
T
O F
T
RAN S P OR T A T I ON
OREGON
EXPIRES: 06-30-2026
99533PEREG
ISTERED PROFESSIONALENGINEER
MARCH 08, 2022CODY G. STONE
THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 238 RAMP PAVING\CAD\EXIT 238 PLAN.DWG 19-Feb-2025 09:20 HWYR20G
OREGON DEPARTMENT
OF TRANSPORTATION
Checker:Drafter:
Designer:
SHEET NO.
COUNTY Reviewer:
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
I5 EXIT 238
RAMP PAVING
PACIFIC HIGHWAY
LINN COUNTY
HWY:
M.P.:
DATE NB ON/OFF RAMP
INTERSECTION
PAVING LIMIT IS FLUSH WITH
EASTERN EDGE OF EXISTING
RUMBLES. REPLACE RUMBLES IN
KIND (INCIDENTAL TO PAVING).
PAVING LIMIT IS FLUSH WITH
EASTERN EDGE OF EXISTING
RUMBLES. NO RUMBLES WOULD BE
REMOVED ON THIS END.
ALL PAVING LIMITS ARE OUTSIDE OF
PAINT TO OUTSIDE OF PAINT, TYP
REPLACE ARROWS WITH
ELONGATED VERSION, TYP
8 ARROWS THIS SIDE OF I5
ALL PAINT TO BE REPLACED WITH
LIKE COLORS AND WIDTHS, TYP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EPEP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
County Name
FEB/25 A03
na na
Cody Stone
Cody Stone
O R
EG
ON
DE PAR TMEN
T
O F
T
RAN S P OR T A T I ON
OREGON
EXPIRES: 06-30-2026
99533PEREG
ISTERED PROFESSIONALENGINEER
MARCH 08, 2022CODY G. STONE
THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 238 RAMP PAVING\CAD\EXIT 238 PLAN.DWG 19-Feb-2025 09:20 HWYR20G
OREGON DEPARTMENT
OF TRANSPORTATION
Checker:Drafter:
Designer:
SHEET NO.
COUNTY Reviewer:
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
I5 EXIT 238
RAMP PAVING
PACIFIC HIGHWAY
LINN COUNTY
HWY:
M.P.:
DATE SB ON/OFF RAMP
INTERSECTION
ALL PAVING LIMITS ARE OUTSIDE OF
PAINT TO OUTSIDE OF PAINT, TYP
EASTERN PAVING LIMIT IS FLUSH
WITH THIS TREE. LIMITS TO BE
PAINTED BY AGENCY.
WESTERN LIMIT IS FLUSH WITH THE
END OF THE SIDEWALK
REPLACE ARROWS WITH
ELONGATED VERSION, TYP
3 ARROWS THIS SIDE OF I5
REPLACE WRONG WAY ARROW
1 ARROW THIS SIDE OF I5
ALL PAINT TO BE REPLACED WITH
LIKE COLORS AND WIDTHS, TYP
| Sheets and Views |
| Exit 238 Plan-1 VIEW (22x34) |
| Exit 238 Plan-1 VIEW (22x34) (2) (2) |
| Exit 238 Plan-1 VIEW (22x34) (2) (2) (2) |
File details come from the government source that posted it. Updated .