Exit 233 Paving Plans_Signed~1.pdf
PDF 596 KB Posted
- Attached to
- R2 Paving RFB - I5 Exit 233 Ramp Paving
- Solicitation number
- S-73000-00013248
- Issued by
- Lake County, Oregon
About this file
This document is a highway paving project plan set developed by the Oregon Department of Transportation (ODOT) for the I5 Northbound Off Ramp at Exit 233 in Linn County. The project involves comprehensive ramp paving, with specific limits defined from the beginning of the off-ramp taper to approximately 75 feet from the crosswalk striping. The plan details include replacing all pavement markings with new like-colored striping per standard specifications, addressing wheel path areas, and noting that the intersection has been converted to radar control, rendering existing detector loops non-functional and unnecessary to replace.
The project plan is dated February 25, 2025, and was professionally stamped by registered Professional Engineer Cody G. Stone (PE license expires 06-30-2026). The engineering drawing provides a detailed aerial view of the project site, showing the ramp's geometric layout, surrounding infrastructure, and precise paving boundaries. Key technical specifications include replacing legends, addressing various width limits, and defining curb-to-curb paving extents. The eastern and southern project limits are carefully delineated, with the paving limit extending to the easternmost bridge joint and the southern limit marked as the northern edge of an adjacent business access area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00013248_bid tab.xlsx | XLSX spreadsheet | |
| Exit 238 Paving Plans_Signed~1.pdf | ||
| 00013248_RFB.xlsx | XLSX spreadsheet | |
| 00013248_RFB_3.26.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EPEP
THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 233 RAMP PAVING\CAD\EXIT 233 PLAN.DWG 20-Feb-2025 14:13 HWYR20G
OREGON DEPARTMENT
OF TRANSPORTATION
Checker:Drafter:
Designer:
SHEET NO.
COUNTY Reviewer:
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
I5 EXIT 233
RAMP PAVING
PACIFIC HIGHWAY
LINN COUNTY
HWY:
M.P.:
DATE
LINN
FEB/25 A01
na na
Cody Stone
Cody Stone
O R
EG
ON
DE PAR TMEN
T
O F
T
RAN S P OR T A T I ON
OREGON
EXPIRES: 06-30-2026
99533PERE
GISTERED PROFESSIONALENGINEER
MARCH 08, 2022CODY G. STONE
I5 NB OFF RAMP
EXIT 233
SOUTHERN LIMIT IS BEGINNING
OF OFF RAMP TAPER
ASSUME 16' WIDTH, LIMITS ARE
OUTSIDE OF PAINT TO OUTSIDE
OF PAINT
REPLACE ALL LEGENDS WITH
ELONGATED VERSIONS TO MISS
WHEEL PATHS (TYP)
WIDTH LIMITS ARE
CURB TO CURB
ON THIS HALF OF
THE PROJECT
SOUTHERN LIMIT IS THE
NORTHERN EDGE OF
THIS BUSINESS ACCESS.
3" CPPR 10,704 SQYDS
3" OF LEVEL 3, 12" DENSE ACP 1,806 TONS
6 ARROWS
634 LF OF STOP BAR/CROSSWALK BAR
LIMITS ARE OUTSIDE OF PAINT
TO OUTSIDE OF PAINT ON THIS
SIDE OF THE INTERSECTION
EXISTING PAVEMENT JOINT
FROM PREVIOUS PROJECT
INTERSECTION HAS BEEN CONVERTED
TO RADAR CONTROL, SO DETECTOR
LOOPS ARE NOT IN SERVICE AND DO
NOT NEED TO BE REPLACED.
PAVING LIMIT IS EASTERNMOST
BRIDGE JOINT
ALL PAINT TO BE REPLACED WITH LIKE COLORS
AND WIDTHS, AND INSTALLED PER TM500,
TM501, TM502, AND TM503, TYP
EASTERN LIMIT IS
APPROXIMATELY 75' FROM
THE CROSSWALK STRIPING
Dat