Exit 233 Paving Plans_Signed~1.pdf

PDF 596 KB Posted

Attached to
R2 Paving RFB - I5 Exit 233 Ramp Paving
Solicitation number
S-73000-00013248
Issued by
Lake County, Oregon

About this file

This document is a highway paving project plan set developed by the Oregon Department of Transportation (ODOT) for the I5 Northbound Off Ramp at Exit 233 in Linn County. The project involves comprehensive ramp paving, with specific limits defined from the beginning of the off-ramp taper to approximately 75 feet from the crosswalk striping. The plan details include replacing all pavement markings with new like-colored striping per standard specifications, addressing wheel path areas, and noting that the intersection has been converted to radar control, rendering existing detector loops non-functional and unnecessary to replace.

The project plan is dated February 25, 2025, and was professionally stamped by registered Professional Engineer Cody G. Stone (PE license expires 06-30-2026). The engineering drawing provides a detailed aerial view of the project site, showing the ramp's geometric layout, surrounding infrastructure, and precise paving boundaries. Key technical specifications include replacing legends, addressing various width limits, and defining curb-to-curb paving extents. The eastern and southern project limits are carefully delineated, with the paving limit extending to the easternmost bridge joint and the southern limit marked as the northern edge of an adjacent business access area.

View the file

Other files

File Type Posted
00013248_bid tab.xlsx XLSX spreadsheet
Exit 238 Paving Plans_Signed~1.pdf PDF
00013248_RFB.xlsx XLSX spreadsheet
00013248_RFB_3.26.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EPEP

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 233 RAMP PAVING\CAD\EXIT 233 PLAN.DWG 20-Feb-2025 14:13 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

I5 EXIT 233

RAMP PAVING

PACIFIC HIGHWAY

LINN COUNTY

HWY:

M.P.:

DATE

LINN

FEB/25 A01

na na

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T

RAN S P OR T A T I ON

OREGON

EXPIRES: 06-30-2026

99533PERE

GISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

I5 NB OFF RAMP

EXIT 233

SOUTHERN LIMIT IS BEGINNING

OF OFF RAMP TAPER

ASSUME 16' WIDTH, LIMITS ARE

OUTSIDE OF PAINT TO OUTSIDE

OF PAINT

REPLACE ALL LEGENDS WITH

ELONGATED VERSIONS TO MISS

WHEEL PATHS (TYP)

WIDTH LIMITS ARE

CURB TO CURB

ON THIS HALF OF

THE PROJECT

SOUTHERN LIMIT IS THE

NORTHERN EDGE OF

THIS BUSINESS ACCESS.

3" CPPR 10,704 SQYDS

3" OF LEVEL 3, 12" DENSE ACP 1,806 TONS

6 ARROWS

634 LF OF STOP BAR/CROSSWALK BAR

LIMITS ARE OUTSIDE OF PAINT

TO OUTSIDE OF PAINT ON THIS

SIDE OF THE INTERSECTION

EXISTING PAVEMENT JOINT

FROM PREVIOUS PROJECT

INTERSECTION HAS BEEN CONVERTED

TO RADAR CONTROL, SO DETECTOR

LOOPS ARE NOT IN SERVICE AND DO

NOT NEED TO BE REPLACED.

PAVING LIMIT IS EASTERNMOST

BRIDGE JOINT

ALL PAINT TO BE REPLACED WITH LIKE COLORS

AND WIDTHS, AND INSTALLED PER TM500,

TM501, TM502, AND TM503, TYP

EASTERN LIMIT IS

APPROXIMATELY 75' FROM

THE CROSSWALK STRIPING

Dat

Sheets and Views
1 VIEW (22x34)

File details come from the government source that posted it. Updated .