Exit 238 Paving Plans_Signed~1.pdf

PDF 1 MB Posted

Attached to
R2 Paving RFB - I5 Exit 238 Ramp Paving
Solicitation number
S-73000-00013249
Issued by
Lake County, Oregon

About this file

These are paving project plans prepared by the Oregon Department of Transportation (ODOT) for the I5 Exit 238 Ramp Paving project located in Linn County, Pacific Highway. The project involves comprehensive repaving of northbound and southbound on and off ramps, with specific paving specifications including 3" Cold Processed Pavement Recycling (CPPR) and 3" Level 3, 12" Dense Asphalt Concrete Pavement (ACP). The total paving area west of I5 is 12,590 square yards with 2,125 tons of material, and east of I5 is 10,141 square yards with 1,711 tons of material. The project also includes replacing all existing paint markings with identical colors and widths, and replacing rumble strips in kind.

The project documents are dated February 2025 and were prepared by registered professional engineer Cody G. Stone, whose professional engineering license expires on 06-30-2026. The plans detail precise paving limits, intersection details, and specific requirements for paint markings, including replacing arrows with elongated versions and wrong-way arrows. The project appears to be a maintenance and infrastructure improvement initiative focused on enhancing road surface quality and safety at the I5 Exit 238 interchange, with meticulous attention to existing road infrastructure preservation and upgrade.

View the file

Other files

File Type Posted
REQ-DASOBO-00104240 TrelstadSP Notice.pdf PDF
00013249_RFB.xlsx XLSX spreadsheet
00013249_RFB_3.26.xlsx XLSX spreadsheet
00013249_bid tab.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EP

EP

EP

EP

EP

EP

EP

EP

EP

EPEPEP EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EPEP

EP

EP

EP

EP

EP

EP

EP

EP

EPEP

EP

EP

EP

EP

EP

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 238 RAMP PAVING\CAD\EXIT 238 PLAN.DWG 19-Feb-2025 09:20 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

I5 EXIT 238

RAMP PAVING

PACIFIC HIGHWAY

LINN COUNTY

HWY:

M.P.:

DATE

County Name

FEB/25 A01

na na

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T

RAN S P OR T A T I ON

OREGON

EXPIRES: 06-30-2026

99533PEREG

ISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

VICINITY MAP

NB ON RAMP

NB OFF RAMP

SB OFF RAMP

SB ON RAMP

NORTHERN LIMIT AT

EXISTING PAVEMENT JOINT

NORTHERN LIMIT AT GORE POINT

SOUTHERN LIMIT AT BRIDGE

SEE SHEET A02 FOR

MORE DETAILS

SEE SHEET A03 FOR

MORE DETAILS

ALL PAINT TO BE REPLACED WITH LIKE COLORS

AND WIDTHS, AND INSTALLED PER TM500,

TM501, TM502, AND TM503, TYP

ALL PAVING LIMITS ARE OUTSIDE OF

PAINT TO OUTSIDE OF PAINT, TYP

WEST OF I5:

3" CPPR, 12,590 SQYDS

3" LEVEL 3, 12" DENSE ACP, 2,125 TON

EAST OF I5:

3" CPPR, 10,141 SQYDS

3" LEVEL 3, 12" DENSE ACP, 1,711 TONS

Dat

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

County Name

FEB/25 A02

na na

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T

RAN S P OR T A T I ON

OREGON

EXPIRES: 06-30-2026

99533PEREG

ISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 238 RAMP PAVING\CAD\EXIT 238 PLAN.DWG 19-Feb-2025 09:20 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

I5 EXIT 238

RAMP PAVING

PACIFIC HIGHWAY

LINN COUNTY

HWY:

M.P.:

DATE NB ON/OFF RAMP

INTERSECTION

PAVING LIMIT IS FLUSH WITH

EASTERN EDGE OF EXISTING

RUMBLES. REPLACE RUMBLES IN

KIND (INCIDENTAL TO PAVING).

PAVING LIMIT IS FLUSH WITH

EASTERN EDGE OF EXISTING

RUMBLES. NO RUMBLES WOULD BE

REMOVED ON THIS END.

ALL PAVING LIMITS ARE OUTSIDE OF

PAINT TO OUTSIDE OF PAINT, TYP

REPLACE ARROWS WITH

ELONGATED VERSION, TYP

8 ARROWS THIS SIDE OF I5

ALL PAINT TO BE REPLACED WITH

LIKE COLORS AND WIDTHS, TYP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EPEP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

County Name

FEB/25 A03

na na

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T

RAN S P OR T A T I ON

OREGON

EXPIRES: 06-30-2026

99533PEREG

ISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\OREGON DEPARTMENT OF TRANSPORTATION\ODOT - REGION 2 - MAINTENANCE - PROJECT PLAN SETS\PAVING\23-25\D4 I5 EXIT 238 RAMP PAVING\CAD\EXIT 238 PLAN.DWG 19-Feb-2025 09:20 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

I5 EXIT 238

RAMP PAVING

PACIFIC HIGHWAY

LINN COUNTY

HWY:

M.P.:

DATE SB ON/OFF RAMP

INTERSECTION

ALL PAVING LIMITS ARE OUTSIDE OF

PAINT TO OUTSIDE OF PAINT, TYP

EASTERN PAVING LIMIT IS FLUSH

WITH THIS TREE. LIMITS TO BE

PAINTED BY AGENCY.

WESTERN LIMIT IS FLUSH WITH THE

END OF THE SIDEWALK

REPLACE ARROWS WITH

ELONGATED VERSION, TYP

3 ARROWS THIS SIDE OF I5

REPLACE WRONG WAY ARROW

1 ARROW THIS SIDE OF I5

ALL PAINT TO BE REPLACED WITH

LIKE COLORS AND WIDTHS, TYP

Sheets and Views
Exit 238 Plan-1 VIEW (22x34)
Exit 238 Plan-1 VIEW (22x34) (2) (2)
Exit 238 Plan-1 VIEW (22x34) (2) (2) (2)

File details come from the government source that posted it. Updated .