About this file
This document is an electrical site power one-line diagram for a demolition and new construction project, specifically drawing E-601, prepared by the U.S. Army Corps of Engineers. The diagram depicts two primary electrical configurations: a demolition scenario (top diagram, B5) and a new power installation scenario (bottom diagram, B1), with a red-outlined area indicating the specific project scope.
The diagram shows multiple electrical infrastructure components including overhead power lines, transformers, HBD panels, and power distribution points. Key technical details include various voltage levels (such as 208V/120V), transformer specifications, and electrical service connections. The drawings illustrate the existing electrical infrastructure and proposed modifications, with detailed routing of electrical lines, placement of new power poles, and connections to existing grid systems. The technical schematic provides a comprehensive view of the electrical redesign, showing how power will be reconfigured during the demolition and reconstruction phases of the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FTQW261101 Jacks House Evaluation Factors.pdf | ||
| Jacks House SOW.pdf | ||
| SF 330 - Revised 7-21.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Site Photos.pdf | ||
| Basis of Estimate.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kristian Journet Polygonal Line
Kristian Journet Line
File details come from the government source that posted it. Updated .