This document is a set of exhibits for a federal contract opportunity involving underground utility installation work.

Exhibit A provides an aerial map showing the project location in a rural area with identifiable landmarks including Reelsville, Hamilton, Eagles Mill Lake, Cloroado, and other geographic features. Exhibit B contains two detailed site maps indicating preferred installation routes for line boring and trenching work. The Line Bore Preferred Map shows three designated points with specific distances: Point 1 to Point 2 measures 310 lineal feet, Point 2 to Tie In 1 measures 132 lineal feet, and Point 2 to Point 3 measures 368 lineal feet. Red lines indicate the preferred bore path, while yellow lines represent existing buried electrical power lines and blue lines represent buried fiber optic lines. The Trenching Preferred Map displays the same points and infrastructure conflicts using identical color coding. Both maps emphasize that all buried utilities must be located by the contractor prior to work commencement. Exhibit C provides three sample forms required for contract administration: an Activity Hazards Analysis form (CEBJL Form 1259, November 2013) for identifying job hazards and required safety measures; an ENG Form 4900-R Property Control Receipt used for transferring equipment and property between handlers; and a DA Form 5479-R Contract Discrepancy Report for documenting contract performance issues and resolutions.

View the file

Other files

File Type Posted
Solicitation Amendment W912QR26QA0550001 SF 30.pdf PDF
Solicitation - W912QR26QA055 Professional Appearance.pdf PDF
SPECIAL INSTRUCTIONS.pdf PDF
Price Breakout Schedule.pdf PDF
SOW.pdf PDF
PIEE Directions1.pdf PDF
Wage Rates_IN20260006.pdf PDF
Reps and Certs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Index of Exhibits:

Exhibit A Project Location Exhibit B Site Preferred Line Routes Exhibit C Miscellaneous Sample Forms

Exhibit A

Exhibit B Line Bore Preferred Map

Approximate distance from point 1 to point 2 is 310 lineal feet. Point 2 to Tie in 1 is 132 lineal feet. Point 2 to Point 3 is 368 lineal feet. Red Lines indicate preferred bore path. Yellow Line represents buried electrical power lines. Blue Line represents buried fiber line. All lines must be located by contractor prior to work beginning.

Exhibit B (continued) Trenching Preferred Map

Red Lines indicate preferred excavation path. Yellow Line represents buried electrical power lines. Blue Line represents buried fiber line. All lines must be located by contractor prior to work beginning.

Exhibit C

Exhibit C (continued)