Exhibits A-E.xlsx
XLSX spreadsheet 81 KB Posted
- Attached to
- Insulation and Lagging, Installation and Removal Federal contract opportunity
- Solicitation number
- N5005420R0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002_SF30_N5005420R0003.pdf | ||
| Amendment_0001_SF30_N5005420R0003.pdf | ||
| Bidders_Questions_and_Answers_1-3.pdf | ||
| J-2_LWT 042-006.pdf | ||
| J-4_LWT 042-009.pdf | ||
| J-11_Past Performance Information (PPi) Questionnaire.docx | DOCX document | |
| J-12_Request for Specification Clarification.docx | DOCX document | |
| J-10_Past Performance Reference List.docx | DOCX document | |
| J-3_LWT 042-007.pdf | ||
| J-1_LWT 042-005.pdf | ||
| J-8_SWT 077-001.pdf | ||
| N5005420R0003.pdf | ||
| J-6_LWT 042-037.pdf | ||
| J-7_LWT 042-038.pdf | ||
| J-5_LWT 042-010.pdf | ||
| J-9_Capacity_Evaluation_Form.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
A 101 Labor and material necessary to accomplish preliminary inspection of lagging and insulation. Take samples of all lagging/insulation for testing for asbestos containing material. 4,800 HR $0.00
A 102 Labor and material necessary to remove asbestos lagging and insulation and Install new piping system lagging and insulation including new and reusable covers.
A 102AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,000 FT $0.00
A 102AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 2400 FT $0.00
A 102AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2400 FT $0.00
A 102AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness 1-1/2 to 6 inches) 1400 FT $0.00
A 103 Labor and material necessary to remove and install galley equipment steam and hot water pipe insulation and lagging
A 103AA 1/2 Inch Steam Pipe 800 FT $0.00
A 103AB 1/2 Inch Hot Water Pipe 700 FT $0.00
A 103AC 3/4 Inch Steam Pipe 700 FT $0.00
A 103AD 3/4 Inch Hot Water Pipe 600 FT $0.00
A 103AE One Inch Steam Pipe 600 FT $0.00
A 103AF One Inch Hot Water Pipe 600 FT $0.00
A 103AG 1/2 Inch Steam Pipe new and reusable covers 600 EA $0.00
A 103AH 1/2 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
A 103AJ 3/4 Inch Steam Pipe new and reusable covers 600 EA $0.00
A 103AK 3/4 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
A 103AL One Inch Steam Pipe new and reusable covers 600 EA $0.00
A 103AM One Inch Hot Water Pipe new and reusable covers 600 EA $0.00
A 104 Labor and material necessary to remove and install weather deck hot piping
A 104AA 1/4 through 3 NPS 650 FT $0.00
A 104AB 3-1/2 through 6 NPS 650 FT $0.00
A 104AC Over 6 NPS 650 FT $0.00
A 105 Labor and material necessary to remove and install hot piping or tubing systems lagging and insulation including new and reusable covers
A 105AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,400 FT $0.00
A 105AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 3,000 FT $0.00
A 105AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2600 FT $0.00
A 105AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 6 inches) 2,600 FT $0.00
A 105AE New and reusable covers 1/2 through 2 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 inches) 500 EA $0.00
A 105AF New and reusable covers 3 through 4 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 1/2 inches) 400 EA $0.00
A 105AG New and reusable covers 5 through 7 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 5 1/2 inches) 400 EA $0.00
A 105AH New and reusable covers 8 Inch and larger NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 6 inches) 400 EA $0.00
A 106 Labor and material necessary to remove and install refrigerant insulation (-20 to +40 Degrees Fahrenheit)
A 106AA 3/8 through 3/4 inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 Inch) 500 FT $0.00
A 106AB One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 500 FT $0.00
A 106AC 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
A 106AD One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
A 106AE 3/8 through 3/4 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
A 106AF One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
A 106AG 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
A 106AH One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
A 106AJ 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 400 FT $0.00
A 106AK 2 1/2 Inch and larger IPS and NSP pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 400 FT $0.00
A 106AL 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness 1 Inch) 400 FT $0.00
A 106AM 2 1/2 Inch and larger IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 400 FT $0.00
A 107 Labor and material necessary to remove and install Air Conditioning/Refrigeration (AC&R) plant equipment insulation $0.00
A 107AA Equipment insulation in non-air conditioned spaces (thickness-2 inch) 600 SQFT $0.00
A 107AB Equipment insulation in air conditioned spaces (thickness-1 inch) 600 SQFT $0.00
A 108 Labor and material necessary to remove and install bulkhead/overhead
A 108AA One or two Inch Thick - Not Requiring Vapor Barrier 7,600 SQFT $0.00
A 108AB One or two Inch Thick - Requiring Vapor Barrier 7,000 SQFT $0.00
A 109 Labor and material necessary to remove and install thermal insulation for hot machinery and equipment
A 109AA Maximum operating temperature - 125-338 degrees F 1,200 SQFT $0.00
A 109AB Maximum operating temperature - 339-500 degrees F 1000 SQFT $0.00
A 109AC Maximum operating temperature - 501-950 degrees F 950 SQFT $0.00
A 109AD Maximum operating temperature - 951-1,200 degrees F 800 SQFT $0.00
A 110 Labor and Material necessary to remove and install thermal insulation for ducts 2800 FT $0.00
A 111 Labor and material necessary to remove and install cold water piping or tubing systems anti-sweat lagging and insulation including new and reusable covers
A 111AA 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 500 FT $0.00
A 111AB 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
A 111AC 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 FT $0.00
A 111AD 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
A 111AE 5 through 7 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch 400 FT $0.00
A 111AF 5 through 7 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thckness - 1/2 inch) 400 FT $0.00
A 111AG 8 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thckness - 3/4 inch) 400 FT $0.00
A 111AH 8 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
A 111AJ New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 dgrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
A 111AK New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
A 111AL New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
A 111AM New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
A 112 Provide, install and maintain scaffolding system to safely reach and allow access to the area being worked. Contractor's QA shall inspect scaffolding each day before work starts for that day and record any report and safety items to his supervisor. All safety items will be corrected before any work starts. On completion of work disassembly and remove scaffolding from area and ship. (for bidding purposes only) 1 US DOLLARS $0.00
A 113 Travel/Per Diem (for bidding purposes only) 1 US DOLLARS $0.00
A 114 Travel G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052. 1 X 0.00% $0.00
| A | 115 | Undisclosed Work |
| The Undisclosed Work ELIN is intended to be used to accomplish tasks that are required, but which are not covered by ELIN's A101 through A112. This includes, but is not limited to, structural work associated with removal and installation of insulation and lagging. Undisclosed Work will NOT be used to reimburse overtime used in accomplishing ELINs A101 through A112. Undisclosed Work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." |
A 115AA Undisclosed Work - Straight Time 1 HR $0.00
A 115AB Undisclosed Work - Overtime 1 HR $0.00
A 115AC Undisclosed Work - Material (Covers only material required for Undisclosed Work) 1 US DOLLARS $0.00
A 115AD Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) 1 X 0.00% $0.00
A 116 Adjustment/Percentage for ELINS A101 through A112 to accomplish tasks on submarines versus surface vessels. ELIN A116 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.) 1 X 0.00% $0.00
A 117 Contract Data Requirements (Form DD-1423) NSP
Total Estimate for Base Year $0.00
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material, equipment rental, services, overhead, profit, and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors.
NOTE 3: With the exception of the Undisclosed Work - Overtime ELIN, overtime is NOT authorized under the terms and conditions of this contract and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense unless otherwise expressly specified in a written task order or written modification to a task order. The Undisclosed Work - Overtime ELIN will only be utilized for overtime associated with the Undisclosed Work ELIN.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
Second Yr (Option 1)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
B 101 Labor and material necessary to accomplish preliminary inspection of lagging and insulation. Take samples of all lagging/insulation for testing for asbestos containing material. 4,800 HR $0.00
B 102 Labor and material necessary to remove asbestos lagging and insulation and Install new piping system lagging and insulation including new and reusable covers
B 102AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,000 FT $0.00
B 102AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 2400 FT $0.00
B 102AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2400 FT $0.00
B 102AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness 1-1/2 to 6 inches) 1400 FT $0.00
B 103 Labor and material necessary to remove and install galley equipment steam and hot water pipe insulation and lagging
B 103AA 1/2 Inch Steam Pipe 800 FT $0.00
B 103AB 1/2 Inch Hot Water Pipe 700 FT $0.00
B 103AC 3/4 Inch Steam Pipe 700 FT $0.00
B 103AD 3/4 Inch Hot Water Pipe 600 FT $0.00
B 103AE One Inch Steam Pipe 600 FT $0.00
B 103AF One Inch Hot Water Pipe 600 FT $0.00
B 103AG 1/2 Inch Steam Pipe new and reusable covers 600 EA $0.00
B 103AH 1/2 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
B 103AJ 3/4 Inch Steam Pipe new and reusable covers 600 EA $0.00
B 103AK 3/4 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
B 103AL One Inch Steam Pipe new and reusable covers 600 EA $0.00
B 103AM One Inch Hot Water Pipe new and reusable covers 600 EA $0.00
B 104 Labor and material necessary to remove and install weather deck hot piping
B 104AA 1/4 through 3 NPS 650 FT $0.00
B 104AB 3-1/2 through 6 NPS 650 FT $0.00
B 104AC Over 6 NPS 650 FT $0.00
B 105 Labor and material necessary to remove and install hot piping or tubing systems lagging and insulation including new and reusable covers
B 105AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,400 FT $0.00
B 105AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 3,000 FT $0.00
B 105AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2600 FT $0.00
B 105AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 6 inches) 2,600 FT $0.00
B 105AE New and reusable covers 1/2 through 2 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 inches) 500 EA $0.00
B 105AF New and reusable covers 3 through 4 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 1/2 inches) 400 EA $0.00
B 105AG New and reusable covers 5 through 7 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 5 1/2 inches) 400 EA $0.00
B 105AH New and reusable covers 8 Inch and larger NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 6 inches) 400 EA $0.00
B 106 Labor and material necessary to remove and install refrigerant insulation (-20 to +40 Degrees Fahrenheit)
B 106AA 3/8 through 3/4 inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 Inch) 500 FT $0.00
B 106AB One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 500 FT $0.00
B 106AC 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
B 106AD One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
B 106AE 3/8 through 3/4 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
B 106AF One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
B 106AG 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
B 106AH One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
B 106AJ 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 400 FT $0.00
B 106AK 2 1/2 Inch and larger IPS and NSP pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 400 FT $0.00
B 106AL 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness 1 Inch) 400 FT $0.00
B 106AM 2 1/2 Inch and larger IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 400 FT $0.00
B 107 Labor and material necessary to remove and install Air Conditioning/Refrigeration (AC&R) plant equipment insulation
B 107AA Equipment insulation in non-air conditioned spaces (thickness-2 inch) 600 SQFT $0.00
B 107AB Equipment insulation in air conditioned spaces (thickness-1 inch) 600 SQFT $0.00
B 108 Labor and material necessary to remove and install bulkhead/overhead
B 108AA One or two Inch Thick - Not Requiring Vapor Barrier 7,600 SQFT $0.00
B 108AB One or two Inch Thick - Requiring Vapor Barrier 7,000 SQFT $0.00
B 109 Labor and material necessary to remove and install thermal insulation for hot machinery and equipment
B 109AA Maximum operating temperature - 125-338 degrees F 1,200 SQFT $0.00
B 109AB Maximum operating temperature - 339-500 degrees F 1000 SQFT $0.00
B 109AC Maximum operating temperature - 501-950 degrees F 950 SQFT $0.00
B 109AD Maximum operating temperature - 951-1,200 degrees F 800 SQFT $0.00
B 110 Labor and Material necessary to remove and install thermal insulation for ducts 2800 FT $0.00
B 111 Labor and material necessary to remove and install cold water piping or tubing systems anti-sweat lagging and insulation including new and reusable covers
B 111AA 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 500 FT $0.00
B 111AB 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
B 111AC 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 FT $0.00
B 111AD 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
B 111AE 5 through 7 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch 400 FT $0.00
B 111AF 5 through 7 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thckness - 1/2 inch) 400 FT $0.00
B 111AG 8 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thckness - 3/4 inch) 400 FT $0.00
B 111AH 8 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
B 111AJ New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 dgrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
B 111AK New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
B 111AL New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
B 111AM New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
B 112 Provide, install and maintain scaffolding system to safely reach and allow access to the area being worked. Contractor's QA shall inspect scaffolding each day before work starts for that day and record any report and safety items to his supervisor. All safety items will be corrected before any work starts. On completion of work disassembly and remove scaffolding from area and ship. (for bidding purposes only) 1 US DOLLARS $0.00
B 113 Travel/Per Diem (for bidding purposes only) 1 US DOLLARS $0.00
B 114 Travel G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052. 1 X 0.00% $0.00
| B | 115 | Undisclosed Work |
| The Undisclosed Work ELIN is intended to be used to accomplish tasks that are required, but which are not covered by ELIN's A101 through A112. This includes, but is not limited to, structural work associated with removal and installation of insulation and lagging. Undisclosed Work will NOT be used to reimburse overtime used in accomplishing ELINs A101 through A112. Undisclosed Work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." |
B 115AA Undisclosed Work - Straight Time 1 HR $0.00
B 115AB Undisclosed Work - Overtime 1 HR $0.00
B 115AC Undisclosed Work - Material (Covers only material required for Undisclosed Work) 1 US DOLLARS $0.00
B 115AD Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) 1 X 0.00% $0.00
B 116 Adjustment/Percentage for ELINS A101 through A112 to accomplish tasks on submarines versus surface vessels. ELIN A116 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.) 1 X 0.00% $0.00
B 117 Contract Data Requirements (Form DD-1423) NSP
Total Estimate for Option 1 Year $0.00
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material, equipment rental, services, overhead, profit, and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors.
NOTE 3: With the exception of the Undisclosed Work - Overtime ELIN, overtime is NOT authorized under the terms and conditions of this contract and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense unless otherwise expressly specified in a written task order or written modification to a task order. The Undisclosed Work - Overtime ELIN will only be utilized for overtime associated with the Undisclosed Work ELIN.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
Third Yr (Option 2)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
C 101 Labor and material necessary to accomplish preliminary inspection of lagging and insulation. Take samples of all lagging/insulation for testing for asbestos containing material. 4,800 HR $0.00
C 102 Labor and material necessary to remove asbestos lagging and insulation and Install new piping system lagging and insulation including new and reusable covers
C 102AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,000 FT $0.00
C 102AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 2400 FT $0.00
C 102AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2400 FT $0.00
C 102AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness 1-1/2 to 6 inches) 1400 FT $0.00
C 103 Labor and material necessary to remove and install galley equipment steam and hot water pipe insulation and lagging
C 103AA 1/2 Inch Steam Pipe 800 FT $0.00
C 103AB 1/2 Inch Hot Water Pipe 700 FT $0.00
C 103AC 3/4 Inch Steam Pipe 700 FT $0.00
C 103AD 3/4 Inch Hot Water Pipe 600 FT $0.00
C 103AE One Inch Steam Pipe 600 FT $0.00
C 103AF One Inch Hot Water Pipe 600 FT $0.00
C 103AG 1/2 Inch Steam Pipe new and reusable covers 600 EA $0.00
C 103AH 1/2 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
C 103AJ 3/4 Inch Steam Pipe new and reusable covers 600 EA $0.00
C 103AK 3/4 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
C 103AL One Inch Steam Pipe new and reusable covers 600 EA $0.00
C 103AM One Inch Hot Water Pipe new and reusable covers 600 EA $0.00
C 104 Labor and material necessary to remove and install weather deck hot piping
C 104AA 1/4 through 3 NPS 650 FT $0.00
C 104AB 3-1/2 through 6 NPS 650 FT $0.00
C 104AC Over 6 NPS 650 FT $0.00
C 105 Labor and material necessary to remove and install hot piping or tubing systems lagging and insulation including new and reusable covers
C 105AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,400 FT $0.00
C 105AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 3,000 FT $0.00
C 105AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2600 FT $0.00
C 105AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 6 inches) 2,600 FT $0.00
C 105AE New and reusable covers 1/2 through 2 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 inches) 500 EA $0.00
C 105AF New and reusable covers 3 through 4 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 1/2 inches) 400 EA $0.00
C 105AG New and reusable covers 5 through 7 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 5 1/2 inches) 400 EA $0.00
C 105AH New and reusable covers 8 Inch and larger NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 6 inches) 400 EA $0.00
C 106 Labor and material necessary to remove and install refrigerant insulation (-20 to +40 Degrees Fahrenheit)
C 106AA 3/8 through 3/4 inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 Inch) 500 FT $0.00
C 106AB One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 500 FT $0.00
C 106AC 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
C 106AD One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
C 106AE 3/8 through 3/4 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
C 106AF One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
C 106AG 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
C 106AH One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
C 106AJ 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 400 FT $0.00
C 106AK 2 1/2 Inch and larger IPS and NSP pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 400 FT $0.00
C 106AL 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness 1 Inch) 400 FT $0.00
C 106AM 2 1/2 Inch and larger IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 400 FT $0.00
C 107 Labor and material necessary to remove and install Air Conditioning/Refrigeration (AC&R) plant equipment insulation
C 107AA Equipment insulation in non-air conditioned spaces (thickness-2 inch) 600 SQFT $0.00
C 107AB Equipment insulation in air conditioned spaces (thickness-1 inch) 600 SQFT $0.00
C 108 Labor and material necessary to remove and install bulkhead/overhead
C 108AA One or two Inch Thick - Not Requiring Vapor Barrier 7,600 SQFT $0.00
C 108AB One or two Inch Thick - Requiring Vapor Barrier 7,000 SQFT $0.00
C 109 Labor and material necessary to remove and install thermal insulation for hot machinery and equipment
C 109AA Maximum operating temperature - 125-338 degrees F 1,200 SQFT $0.00
C 109AB Maximum operating temperature - 339-500 degrees F 1000 SQFT $0.00
C 109AC Maximum operating temperature - 501-950 degrees F 950 SQFT $0.00
C 109AD Maximum operating temperature - 951-1,200 degrees F 800 SQFT $0.00
C 110 Labor and Material necessary to remove and install thermal insulation for ducts 2800 FT $0.00
C 111 Labor and material necessary to remove and install cold water piping or tubing systems anti-sweat lagging and insulation including new and reusable covers
C 111AA 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 500 FT $0.00
C 111AB 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
C 111AC 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 FT $0.00
C 111AD 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
C 111AE 5 through 7 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch 400 FT $0.00
C 111AF 5 through 7 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thckness - 1/2 inch) 400 FT $0.00
C 111AG 8 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thckness - 3/4 inch) 400 FT $0.00
C 111AH 8 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
C 111AJ New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 dgrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
C 111AK New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
C 111AL New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
C 111AM New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
C 112 Provide, install and maintain scaffolding system to safely reach and allow access to the area being worked. Contractor's QA shall inspect scaffolding each day before work starts for that day and record any report and safety items to his supervisor. All safety items will be corrected before any work starts. On completion of work disassembly and remove scaffolding from area and ship. (for bidding purposes only) 1 US DOLLARS $0.00
C 113 Travel/Per Diem (for bidding purposes only) 1 US DOLLARS $0.00
C 114 Travel G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052. 1 X 0.00% $0.00
| C | 115 | Undisclosed Work |
| The Undisclosed Work ELIN is intended to be used to accomplish tasks that are required, but which are not covered by ELIN's A101 through A112. This includes, but is not limited to, structural work associated with removal and installation of insulation and lagging. Undisclosed Work will NOT be used to reimburse overtime used in accomplishing ELINs A101 through A112. Undisclosed Work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." |
C 115AA Undisclosed Work - Straight Time 1 HR $0.00
C 115AB Undisclosed Work - Overtime 1 HR $0.00
C 115AC Undisclosed Work - Material (Covers only material required for Undisclosed Work) 1 US DOLLARS $0.00
C 115AD Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) 1 X 0.00% $0.00
C 116 Adjustment/Percentage for ELINS A101 through A112 to accomplish tasks on submarines versus surface vessels. ELIN A116 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.) 1 X 0.00% $0.00
C 117 Contract Data Requirements (Form DD-1423) NSP
Total Estimate for Option 2 Year $0.00
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material, equipment rental, services, overhead, profit, and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors.
NOTE 3: With the exception of the Undisclosed Work - Overtime ELIN, overtime is NOT authorized under the terms and conditions of this contract and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense unless otherwise expressly specified in a written task order or written modification to a task order. The Undisclosed Work - Overtime ELIN will only be utilized for overtime associated with the Undisclosed Work ELIN.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
Fourth Yr (Option 3)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
D 101 Labor and material necessary to accomplish preliminary inspection of lagging and insulation. Take samples of all lagging/insulation for testing for asbestos containing material. 4,800 HR $0.00
D 102 Labor and material necessary to remove asbestos lagging and insulation and Install new piping system lagging and insulation including new and reusable covers
D 102AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,000 FT $0.00
D 102AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 2400 FT $0.00
D 102AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2400 FT $0.00
D 102AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness 1-1/2 to 6 inches) 1400 FT $0.00
D 103 Labor and material necessary to remove and install galley equipment steam and hot water pipe insulation and lagging
D 103AA 1/2 Inch Steam Pipe 800 FT $0.00
D 103AB 1/2 Inch Hot Water Pipe 700 FT $0.00
D 103AC 3/4 Inch Steam Pipe 700 FT $0.00
D 103AD 3/4 Inch Hot Water Pipe 600 FT $0.00
D 103AE One Inch Steam Pipe 600 FT $0.00
D 103AF One Inch Hot Water Pipe 600 FT $0.00
D 103AG 1/2 Inch Steam Pipe new and reusable covers 600 EA $0.00
D 103AH 1/2 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
D 103AJ 3/4 Inch Steam Pipe new and reusable covers 600 EA $0.00
D 103AK 3/4 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
D 103AL One Inch Steam Pipe new and reusable covers 600 EA $0.00
D 103AM One Inch Hot Water Pipe new and reusable covers 600 EA $0.00
D 104 Labor and material necessary to remove and install weather deck hot piping
D 104AA 1/4 through 3 NPS 650 FT $0.00
D 104AB 3-1/2 through 6 NPS 650 FT $0.00
D 104AC Over 6 NPS 650 FT $0.00
D 105 Labor and material necessary to remove and install hot piping or tubing systems lagging and insulation including new and reusable covers
D 105AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,400 FT $0.00
D 105AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 3,000 FT $0.00
D 105AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2600 FT $0.00
D 105AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 6 inches) 2,600 FT $0.00
D 105AE New and reusable covers 1/2 through 2 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 inches) 500 EA $0.00
D 105AF New and reusable covers 3 through 4 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 1/2 inches) 400 EA $0.00
D 105AG New and reusable covers 5 through 7 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 5 1/2 inches) 400 EA $0.00
D 105AH New and reusable covers 8 Inch and larger NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 6 inches) 400 EA $0.00
D 106 Labor and material necessary to remove and install refrigerant insulation (-20 to +40 Degrees Fahrenheit)
D 106AA 3/8 through 3/4 inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 Inch) 500 FT $0.00
D 106AB One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 500 FT $0.00
D 106AC 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
D 106AD One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
D 106AE 3/8 through 3/4 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
D 106AF One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
D 106AG 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
D 106AH One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
D 106AJ 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 400 FT $0.00
D 106AK 2 1/2 Inch and larger IPS and NSP pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 400 FT $0.00
D 106AL 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness 1 Inch) 400 FT $0.00
D 106AM 2 1/2 Inch and larger IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 400 FT $0.00
D 107 Labor and material necessary to remove and install Air Conditioning/Refrigeration (AC&R) plant equipment insulation
D 107AA Equipment insulation in non-air conditioned spaces (thickness-2 inch) 600 SQFT $0.00
D 107AB Equipment insulation in air conditioned spaces (thickness-1 inch) 600 SQFT $0.00
D 108 Labor and material necessary to remove and install bulkhead/overhead
D 108AA One or two Inch Thick - Not Requiring Vapor Barrier 7,600 SQFT $0.00
D 108AB One or two Inch Thick - Requiring Vapor Barrier 7,000 SQFT $0.00
D 109 Labor and material necessary to remove and install thermal insulation for hot machinery and equipment
D 109AA Maximum operating temperature - 125-338 degrees F 1,200 SQFT $0.00
D 109AB Maximum operating temperature - 339-500 degrees F 1000 SQFT $0.00
D 109AC Maximum operating temperature - 501-950 degrees F 950 SQFT $0.00
D 109AD Maximum operating temperature - 951-1,200 degrees F 800 SQFT $0.00
D 110 Labor and Material necessary to remove and install thermal insulation for ducts 2800 FT $0.00
D 111 Labor and material necessary to remove and install cold water piping or tubing systems anti-sweat lagging and insulation including new and reusable covers
D 111AA 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 500 FT $0.00
D 111AB 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
D 111AC 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 FT $0.00
D 111AD 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
D 111AE 5 through 7 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch 400 FT $0.00
D 111AF 5 through 7 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thckness - 1/2 inch) 400 FT $0.00
D 111AG 8 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thckness - 3/4 inch) 400 FT $0.00
D 111AH 8 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
D 111AJ New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 dgrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
D 111AK New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
D 111AL New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
D 111AM New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
D 112 Provide, install and maintain scaffolding system to safely reach and allow access to the area being worked. Contractor's QA shall inspect scaffolding each day before work starts for that day and record any report and safety items to his supervisor. All safety items will be corrected before any work starts. On completion of work disassembly and remove scaffolding from area and ship. (for bidding purposes only) 1 US DOLLARS $0.00
D 113 Travel/Per Diem (for bidding purposes only) 1 US DOLLARS $0.00
D 114 Travel G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052. 1 X 0.00% $0.00
| D | 115 | Undisclosed Work |
| The Undisclosed Work ELIN is intended to be used to accomplish tasks that are required, but which are not covered by ELIN's A101 through A112. This includes, but is not limited to, structural work associated with removal and installation of insulation and lagging. Undisclosed Work will NOT be used to reimburse overtime used in accomplishing ELINs A101 through A112. Undisclosed Work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." |
D 115AA Undisclosed Work - Straight Time 1 HR $0.00
D 115AB Undisclosed Work - Overtime 1 HR $0.00
D 115AC Undisclosed Work - Material (Covers only material required for Undisclosed Work) 1 US DOLLARS $0.00
D 115AD Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) 1 X 0.00% $0.00
D 116 Adjustment/Percentage for ELINS A101 through A112 to accomplish tasks on submarines versus surface vessels. ELIN A116 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.) 1 X 0.00% $0.00
D 117 Contract Data Requirements (Form DD-1423) NSP
Total Estimate for Option 3 Year $0.00
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material, equipment rental, services, overhead, profit, and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors.
NOTE 3: With the exception of the Undisclosed Work - Overtime ELIN, overtime is NOT authorized under the terms and conditions of this contract and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense unless otherwise expressly specified in a written task order or written modification to a task order. The Undisclosed Work - Overtime ELIN will only be utilized for overtime associated with the Undisclosed Work ELIN.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
Fifth Yr (Option 4)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
E 101 Labor and material necessary to accomplish preliminary inspection of lagging and insulation. Take samples of all lagging/insulation for testing for asbestos containing material. 4,800 HR $0.00
E 102 Labor and material necessary to remove asbestos lagging and insulation and Install new piping system lagging and insulation including new and reusable covers
E 102AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,000 FT $0.00
E 102AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 2400 FT $0.00
E 102AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2400 FT $0.00
E 102AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness 1-1/2 to 6 inches) 1400 FT $0.00
E 103 Labor and material necessary to remove and install galley equipment steam and hot water pipe insulation and lagging
E 103AA 1/2 Inch Steam Pipe 800 FT $0.00
E 103AB 1/2 Inch Hot Water Pipe 700 FT $0.00
E 103AC 3/4 Inch Steam Pipe 700 FT $0.00
E 103AD 3/4 Inch Hot Water Pipe 600 FT $0.00
E 103AE One Inch Steam Pipe 600 FT $0.00
E 103AF One Inch Hot Water Pipe 600 FT $0.00
E 103AG 1/2 Inch Steam Pipe new and reusable covers 600 EA $0.00
E 103AH 1/2 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
E 103AJ 3/4 Inch Steam Pipe new and reusable covers 600 EA $0.00
E 103AK 3/4 Inch Hot Water Pipe new and reusable covers 600 EA $0.00
E 103AL One Inch Steam Pipe new and reusable covers 600 EA $0.00
E 103AM One Inch Hot Water Pipe new and reusable covers 600 EA $0.00
E 104 Labor and material necessary to remove and install weather deck hot piping
E 104AA 1/4 through 3 NPS 650 FT $0.00
E 104AB 3-1/2 through 6 NPS 650 FT $0.00
E 104AC Over 6 NPS 650 FT $0.00
E 105 Labor and material necessary to remove and install hot piping or tubing systems lagging and insulation including new and reusable covers
E 105AA 1/2 through 2-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4 inches) 4,400 FT $0.00
E 105AB 3 through 4-1/2 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 4-1/2 inches) 3,000 FT $0.00
E 105AC 5, 6 or 7 NPS pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 5-1/2 inches) 2600 FT $0.00
E 105AD 8 NPS and larger pipe, 125-1,050 degrees F (nominal thickness - 1-1/2 to 6 inches) 2,600 FT $0.00
E 105AE New and reusable covers 1/2 through 2 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 inches) 500 EA $0.00
E 105AF New and reusable covers 3 through 4 1/2 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 4 1/2 inches) 400 EA $0.00
E 105AG New and reusable covers 5 through 7 Inch NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 5 1/2 inches) 400 EA $0.00
E 105AH New and reusable covers 8 Inch and larger NPS pipe, 125-1050 degrees F (nominal thickness - 1 1/2 to 6 inches) 400 EA $0.00
E 106 Labor and material necessary to remove and install refrigerant insulation (-20 to +40 Degrees Fahrenheit)
E 106AA 3/8 through 3/4 inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 Inch) 500 FT $0.00
E 106AB One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 500 FT $0.00
E 106AC 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
E 106AD One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 500 FT $0.00
E 106AE 3/8 through 3/4 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
E 106AF One through 2 Inch IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness - 1 inch) 500 FT $0.00
E 106AG 3/8 through 3/4 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
E 106AH One through 2 Inch IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 500 FT $0.00
E 106AJ 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) non-air conditioned spaces (thickness - 1 1/2 inch) 400 FT $0.00
E 106AK 2 1/2 Inch and larger IPS and NSP pipe/tubing (0 to 40 degrees F) non-air conditioned spaces (thickness - 1 inch) 400 FT $0.00
E 106AL 2 1/2 Inch and larger IPS and NPS pipe/tubing (-20 to minus 1 degree F) air conditioned spaces (thickness 1 Inch) 400 FT $0.00
E 106AM 2 1/2 Inch and larger IPS and NPS pipe/tubing (0 to 40 degrees F) air conditioned spaces (thickness - 3/4 inch) 400 FT $0.00
E 107 Labor and material necessary to remove and install Air Conditioning/Refrigeration (AC&R) plant equipment insulation $0.00
E 107AA Equipment insulation in non-air conditioned spaces (thickness-2 inch) 600 SQFT $0.00
E 107AB Equipment insulation in air conditioned spaces (thickness-1 inch) 600 SQFT $0.00
E 108 Labor and material necessary to remove and install bulkhead/overhead
E 108AA One or two Inch Thick - Not Requiring Vapor Barrier 7,600 SQFT $0.00
E 108AB One or two Inch Thick - Requiring Vapor Barrier 7,000 SQFT $0.00
E 109 Labor and material necessary to remove and install thermal insulation for hot machinery and equipment
E 109AA Maximum operating temperature - 125-338 degrees F 1,200 SQFT $0.00
E 109AB Maximum operating temperature - 339-500 degrees F 1000 SQFT $0.00
E 109AC Maximum operating temperature - 501-950 degrees F 950 SQFT $0.00
E 109AD Maximum operating temperature - 951-1,200 degrees F 800 SQFT $0.00
E 110 Labor and Material necessary to remove and install thermal insulation for ducts 2800 FT $0.00
E 111 Labor and material necessary to remove and install cold water piping or tubing systems anti-sweat lagging and insulation including new and reusable covers
E 111AA 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 500 FT $0.00
E 111AB 1/2 through 2 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
E 111AC 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 FT $0.00
E 111AD 3 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
E 111AE 5 through 7 Inch NPS pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch 400 FT $0.00
E 111AF 5 through 7 Inch NPS pipe (28 to 99 degrees F) air conditioned spaces (nominal thckness - 1/2 inch) 400 FT $0.00
E 111AG 8 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thckness - 3/4 inch) 400 FT $0.00
E 111AH 8 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 FT $0.00
E 111AJ New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 dgrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
E 111AK New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) non-air conditioned spaces (nominal thickness - 3/4 inch) 400 EA $0.00
E 111AL New and reusable covers 1/2 through 4 1/2 Inch NPS pipe (28 to 99 degrees F) air-conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
E 111AM New and reusable covers 5 Inch NPS and larger pipe (28 to 99 degrees F) air conditioned spaces (nominal thickness - 1/2 inch) 400 EA $0.00
E 112 Provide, install and maintain scaffolding system to safely reach and allow access to the area being worked. Contractor's QA shall inspect scaffolding each day before work starts for that day and record any report and safety items to his supervisor. All safety items will be corrected before any work starts. On completion of work disassembly and remove scaffolding from area and ship. (for bidding purposes only) 1 US DOLLARS $0.00
E 113 Travel/Per Diem (for bidding purposes only) 1 US DOLLARS $0.00
E 114 Travel G&A (Contractor to submit a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .