EXHIBITASQFootage.pdf
PDF 23 KB Posted
- Solicitation number
- S123414-vCurrent
- Issued by
- Suffolk County, Winthrop Town City, Massachusetts
About this file
This document is an EXHIBIT A - SQUARE FOOTAGE SUMMARY BY LOCATION, DITP for a state and local contract opportunity. It provides detailed square footage information for various buildings and floors that require daily cleaning services as part of the contract. The total space to be cleaned across all buildings is 229,414 square feet, with an overall building gross of 546,053 square feet. The document includes floor plans and exhibits for each building, specifying the square footage breakdowns for corridors, stairs, bathrooms, offices, warehouses, and other areas. It also identifies spaces that require periodic policing rather than daily cleaning, totaling 68,347 square feet. The document outlines the flooring types for the different spaces, noting that most office spaces have carpeted floors while corridors and other areas have terrazzo-style or linoleum tile floors.
The pricing for the cleaning services is not explicitly stated in this exhibit. However, the comprehensive square footage details provided are likely intended to inform the bidding process and contract pricing. This information is crucial for potential bidders to accurately estimate the scope and scale of the required cleaning services across the multiple buildings and floors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXHIBITBDirections.pdf | ||
| PART6GENERALCONDITIONS.pdf | ||
| PrevailingWageNotice.pdf | ||
| WRA-3233QandA.pdf | ||
| PrevailingWageRates.pdf | ||
| EXHIBITCSafety.pdf | ||
| RFBPart1.pdf | ||
| PrevailingWageCompliance.pdf | ||
| PrevailingWagePayrollForm.pdf | ||
| S123414-vCurrent_OD.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A - SQUARE FOOTAGE SUMMARY BY LOCATION, DITP
AREAS TO BE CLEANED DAILY (PAGES 1 THROUGH 8)
(Note: The Exhibits referenced below (Exhibit C-1, C-2, etc.) are from facility drawings which shall be provided to Qualified Bidders with "RFQ/B Part 2, Submittal of Bid Prices") Maintenance/Warehouse Square Footage
Plan 1 - Floor No. 1 (EXHIBIT C-1) Corridors 4,550 Stairs 433 Bathrooms 644 Showers/Lockers/Mud Room 6,147 Elevators 43 Lunch/Kitchen/Lounge 257 Shops 3,022 Offices 9,244 Total Space to be Cleaned: 24,340
Plan 2 - Floor No. 1 (EXHIBIT C-2) Corridors 3,107 Stairs 201 Bathrooms 352 Elevators 168 Warehouse/Shipping & Receiving (aisles) 7,364 Lunch/Kitchen/Lounge 490 Shops 1,826 Offices 848 Total Space: 14,356 Total Space to be Cleaned: 10,606
Plan 3 - Floor No. 1 (EXHIBIT C-3) Stairs 103 Lunch/Kitchen/Lounge 577 Shops 7,316 Shop Corridor 2,566 Offices 94 Total Space: 10,656 Total Space to be Cleaned: 3,340
Plan 4 - Floor No. 1 (EXHIBIT C-4) Lunch/Kitchen/Lounge 353 Shops 11,466 Shop Corridor 3,179 Total Space: 14,998 Total Space to be Cleaned: 3,532
Total First Floor Space to be Cleaned: 41,818 First Floor Gross: 62,695
Exhibit A, Page 1 of 12
Plan 1 - Floor No. 2 (EXHIBIT C-5) Square Footage
Corridors 3,274 Stairs 370 Bathrooms 786 Showers/Lockers 1,373 Lunch/Kitchen/Lounge 4,670 Mezzanine 750 Warehouse 560 Offices 8,952 Total Space to be Cleaned: 20,735
Plan 2 - Floor No. 2 (EXHIBIT C-6) Warehouse 13,706 Mezzanine 300 Total Space to be Cleaned: 14,006
Plan 3 - Floor No. 2 (EXHIBIT C-7) Mezzanine, Total Space to be Cleaned: 2,114
Plan 4 - Floor No. 2 (EXHIBIT C-8) Mezzanine, Total Space to be Cleaned: 2,445
Second Floor Space to be Cleaned: 39,300
Second Floor Gross: 71,673
Total First & Second Floor (to be Cleaned) 81,118
Building Gross 134,368
Building Elevations, Windows, Louvers (EXHIBIT C-9 to C-11)
Administration/Laboratory Building
Floor No. 1 (EXHIBIT D-1) Corridors 9,635 Stairs 184 Bathrooms 801 Showers/Lockers 1,088 Lunch/Kitchen/Lounge 176 Elevators 105 Laboratory 5,341 Offices 3,467 Total Space to be Cleaned: 20,797
Gross First Floor 35,676
Exhibit A, Page 2 of 12
Floor No. 2 (EXHIBIT D-2) Square Footage Corridors 3,309 Lunch/Kitchen/Lounge 2,324 Stairs 312 Bathrooms 338 Laboratory 440 Offices 16,325 Total Space to be Cleaned: 23,048 Gross Second Floor 25,849
Floor No. 3 (EXHIBIT D-3) Corridors 1,629 Lunch/Kitchen/Lounge 235 Stairs 311 Bathrooms 337 Laboratory 2,034 Offices 10,013 Total Space to be Cleaned: 14,559 Gross Third Floor 17,129
Floor No. 4 (EXHIBIT D-4) Corridors 2,129 Lunch/Kitchen/Lounge 267 Stairs 311 Bathrooms 338 Laboratory 6,377 Offices 4,622 Total Space to be Cleaned: 14,044
Total of First, Second, Third & Fourth Floors (to be Cleaned) 72,448
Gross Fourth Floor 16,500 Building Gross 95,154
Elevations/Louvers (EXHIBIT D-5 to D-7)
Reception/Training Building
Floor No. 1 (EXHIBIT E-1) Corridors 3,303 Bathrooms 599 Lunch/Kitchen/Lounge 300 Offices 9,856 Total Space to be Cleaned: 14,058
Building Gross 20,235 Exterior Elevations (EXHIBIT E-2 to E-7)
Exhibit A, Page 3 of 12
Main Guard House Square Footage
Floor No. 1 (EXHIBIT F-1) Bathrooms 45 Lockers 85 Reception/Registration 58 Kitchen 144 Electrical 53 Offices 320 Total Space to be Cleaned: 705
Building Gross 852 Elevations/Louvers (EXHIBIT F-2 to F-3)
North Main Pump Station
Floor No. 1 (EXHIBIT G-1) Corridors 1,850 Lunch/Kitchen 763 Conference Room 219 Bathrooms 378 Showers/Lockers/Mud room 1,371 Offices 1,223 Total Space to be Cleaned: 5,804
Building Gross 40,760 Exterior Elevations (EXHIBIT G-2)
Primary Operations
Floor No. 1 (EXHIBIT H-1) Corridors 1,095 Conference Room 295 Stairs 320 Bathrooms 256 Elevators 236 Offices 3,108 Total Space to be Cleaned: 5,310 Gross First Floor 6,726
Floor No. 2 (EXHIBIT H-2) Corridors 960 Stairs 274 Bathrooms 443 Showers/Lockers 1,966 Lunch/Vending 946 Total Space to be Cleaned: 4,589 Gross Second Floor 6,829
Exhibit A, Page 4 of 12
Floor No. 3 (EXHIBIT H-3) Square Footage Corridors 1,035 Laboratory/Storage 383 Stairs 274 Bathrooms 221 Showers/Lockers/Mud Room 606 Computer Room 244 Workshop 515 Total Space to be Cleaned: 3,278 Gross Third Floor 6,829
Total of First, Second, & Third Floors (to be Cleaned) 13,177 Building Gross 20,384
Building Elevations (EXHIBIT H-4)
South System Pump Station
Floor No. 1 (EXHIBIT I-1) Corridors 214 Bathrooms 111 Offices 398 Total Space to be Cleaned: 723
Building Gross 112,736
Elevation 1 (EXHIBIT I-2) Elevation 2 (EXHIBIT I-3)
Pilot Plant This Building No Longer Serviced
(EXHIBIT J-1)
Total Space to be Cleaned: 1,766
First Floor Gross 16,980
Building Gross 26,689
Exhibit A, Page 5 of 12
Cryogenics Building Square Footage
Floor No. 1 (EXHIBIT K-1) Corridors/stairs 413 Bathrooms 73 Mud Room 112 Offices 1,022 Total Space to be Cleaned: 1,620 First Floor Gross 14,970
Floor No. 2 (EXHIBIT K-2) Corridors/Stairs to be Cleaned: 475 Second Floor Gross 3,473
Total, First and Second Floors (to be Cleaned) 2,095 Building Gross 18,443 Building Elevations (EXHIBIT K-3)
Secondary Operations
Floor No. 1 (EXHIBIT L-1) Corridors 1,859 Bathrooms 746 Showers/Lockers/Mud Room 1,338 Stairs 308 Computer Room 466 Conference Room 324 Elevator 179 Lunch/Kitchen/Lounge 780 Offices 1,229 Total Space to be Cleaned: 7,229 Building Gross 9,968
Building Elevation (EXHIBIT L-2)
Residuals/Operations Center Floor No. 1 (EXHIBIT M-1) Corridors, Stairs and Elevator 3,278 Bathrooms 407 Showers/Lockers/Mud Room 1,117 Laboratory 406 Computer Room 335 Conference Room 243 Lunch/Kitchen/Lounge 1,147 Offices 1,119 Total Space to be Cleaned: 8,052 Building Gross 32,330 Elevations (EXHIBIT M-2 to M-5)
Exhibit A, Page 6 of 12
Centrifuge Building Square Footage
Floor No. 1 (EXHIBIT N-I) Corridors 417 Mud Room 74 Sample Room 73 Stairs 866 Elevator 158 Total Space to be Cleaned: 1,588 First Floor Gross 30,140
Floor No. 2 (EXHIBIT N-2) Corridors 507 Bathrooms 168 Conference Room 368 Offices 1,368 Total Space to be Cleaned: 2,411 Second Floor Gross 8,274
Total of First and Second Floor (to be Cleaned) 3,999 Building Gross 38,414
Building Elevations (Exhibit N-3 to N-4)
Thermal Power Plant
Floor No. 1 (Platforms/Mezzanines) (Exhibit O-1 to O-4) Corridors 680 Bathrooms 156 Stairs 218 Laboratory 557 Shops 1,017 Elevator 45 Total Space to be Cleaned: 2,673 First Floor Gross 41,061
Mezzanine El. 151.92' (EXHIBIT O-5) Total Space to be Cleaned: 0
Mezzanine El. 152.58' (EXHIBIT O-6) Corridors 973 Bathrooms 279 Showers/Lockers 610 Stairs 336 Lunch 366 Offices 2,115 Total Space to be Cleaned: 4,679
Exhibit A, Page 7 of 12
Mezzanine El. 160.17' Square Footage Stairs (EXHIBIT O-7 to O-9) 184 Corridors 208 Total Space to be Cleaned: 392
Total of Mezzanine's (to be Cleaned) 7,744 Building Gross 52,921
Building Elevations (EXHIBIT O-10 to O-13 )
Garage
Floor No. 1 (EXHIBIT P-1) Warehouse 4,187 Shop 5,417 Bathrooms 302 Storage/Janitorial 1,374 Offices 182 Total Space to be Cleaned: 11,462 Building Gross 12,301
Building Elevations (EXHIBIT P-2)
Partition Types, Window Type, Schedule (EXHIBIT Q-1) Translucent Panel, Schedules & Details (EXHIBIT Q-2)
Winthrop Terminal Facility
Floor No. 1 (Elev. 125.53) (EXHIBIT R-1)
Corridors/Stairs 350 Bathroom/Kitchen Area (not indicated on the drawing) 450 Total Space to be Cleaned: 800 Building Gross: 9,770
Old Administration Building this building is no longer serviced
Total of Basement and First Floor (to be Cleaned) 4,320
Total Space Requiring Daily Cleaning, All Listed Buildings: 229,414 Total Gross Space, All Listed Buildings: 546,053
Most of the office spaces in the Admin/Lab building, Reception/Training Bldg, and the Maintenance Bldg have carpeted floors. The corridors have terrazzo-style floors.
The office space and corridors in the other buildings have terrazzo-style or linoleum tile floors.
Exhibit A, Page 8 of 12
AREAS PERIODICALLY POLICED (PAGES 9 THROUGH 12)
These areas need periodic cleaning, done by the day shift upon request of the Facility Manager.
Therefore, these square footages are not used in the calculated square footage for daily cleaning.
Maintenance/Warehouse Square Footage
Plan 1 - Floor No. 1 (EXHIBIT C-1) Storage/Janitorial 59 Mechanical/Electrical/Communication 598
Plan 1 - Floor No. 2 (EXHIBIT C-5) Storage/Janitorial/Closets 434 Mechanical/Electrical/Communication 536
Plan 2 - Floor No. 2 (EXHIBIT C-6) Mechanical 112 Building Total: 1,739
Administration/Laboratory Building
Floor No. 1 (EXHIBIT D-1) Storage/Janitorial/Closets 1,250 Mechanical/Electrical/Communication/Cable 10,831
Floor No. 2 (EXHIBIT D-2) Storage/Janitorial/Closets 174 Mechanical/Electrical/Communication 354
Floor No. 3 (EXHIBIT D-3) Storage/Janitorial/Closets 201 Mechanical/Electrical/Communication 354
Floor No. 4 (EXHIBIT D-4) Storage/Janitorial/Closets 292 Mechanical/Electrical/Communication 354 Building Total: 13,810
Reception/Training Building
Floor No. 1 (EXHIBIT E-1) Storage/Janitorial/Closets 548 Mechanical/Electrical/Communication/Cable 2,425 Building Total: 2,973
North Main Pump Station
Floor No. 1 (EXHIBIT G-1) Storage/Janitorial 1,344 Electrical 549 Building Total: 1,893
Exhibit A, Page 9 of 12
Primary Operations Square Footage Floor No. 1 (EXHIBIT H-1) Storage/Janitorial/Closets 242 Mechanical/Electrical/Communication 126
Floor No. 2 (EXHIBIT H-2) Storage/Janitorial/Closets 392 Electrical 123
Floor No. 3 (EXHIBIT H-3) Storage/Janitorial/Closets 401 Electrical 1,485 Building Total: 2,769
South System Pump Station Floor No. 1 (EXHIBIT I-1) Storage 108 Building Total: 108
Pilot Plant (Building now only on periodic servicing)
Floor No. 1 (EXHIBIT J-1) Storage/Janitorial 77 Electrical 783
Basement (EXHIBIT J-1) Chemical Room 103 Stairs 336 Storage/Janitorial/Closets 392 Mechanical/Electrical/Communication/HVAC 1,132 Building Total: 2,823
Cryogenics Building Floor No. 1 (EXHIBIT K-1) Mechanical/Electrical 12,414
Floor No. 2 (EXHIBIT K-2) Mechanical/Electrical 1,474 MCC Room 1,192 Building Total: 15,080
Secondary Operations Floor No. 1 (EXHIBIT L-1) Storage/Janitorial/Closets 494 Mechanical/Electrical 942 Building Total: 1,436
Exhibit A, Page 10 of 12
Residuals/Operations Center Square Footage Floor No. 1 (EXHIBIT M-1) Storage/Janitorial/Closets 332 Lunch/Kitchen/Lounge 1,147 Mechanical/Electrical/Maintenance 1,807 Building Total: 3,286
Centrifuge Building Floor No. 1 (EXHIBIT N-I) DPU Room 618 Storage 2,124 Electrical 2,764
Floor No. 2 (EXHIBIT N-2) Storage/Janitorial 394 HVAC/Electrical/Communications 3,302 Building Total: 9,202
Thermal Power Plant Floor No. 1 (Platforms/Mezzanines) (Exhibit O-1 to O-4) Storage/Janitorial/Closets 1,339 Mechanical/Electrical/Cable 378
Mezzanine El. 151.92' (EXHIBIT O-5) Mechanical/Electrical/Cable 2,987
Mezzanine El. 152.58' (EXHIBIT O-6) Storage 143 Mechanical/Electrical/Cable 672
Mezzanine El. 160.17' (EXHIBIT O-7 to O-9) Stairs 184 Corridors 208 Mechanical/Electrical/Cable 2,987 Building Total: 8,898
Garage Floor No. 1 (EXHIBIT P-1) Mechanical/Electrical/Communication 340 Building Total: 340
Exhibit A, Page 11 of 12
Winthrop Terminal Facility Square Footage Floor No. 1 (Elev. 125.53) (EXHIBIT R-1) Storage 40 Equipment Room 3,950 Building Total: 3,990
Old Administration Building Building no longer serviced Basement (EXHIBIT S-1) Storage 40 Mechanical Room 410 Building Total: 450
Total Square Footage Requiring Periodic Policing: 68,347
Exhibit A, Page 12 of 12
File details come from the government source that posted it. Updated .