Exhibit K TICs Table.pdf

PDF 201 KB Posted

Attached to
San Antonio North CBOC
Solicitation number
36C24W25R0072
Issued by

About this file

The document is a Tenant Improvements Cost Summary (TICS) template for a VA clinical space lease in San Antonio, Texas. The spreadsheet provides a detailed breakdown of potential construction and improvement costs across multiple CSI Masterformat divisions, including General Requirements, Site Work, Concrete, Foundations, Metals, Woods & Plastics, Thermal & Moisture, Doors & Windows, Finishes, and various specialized systems like Fire Suppression, Plumbing, HVAC, Electrical, Communications, and Security. The template is designed to itemize trade costs for both Tenant Improvements (TI) and Shell construction, with sections for General Contractor Fees, Architectural & Engineering Fees, and Lessor's Project Management Fees. However, in this instance, all cost fields are currently blank, suggesting it is an empty template awaiting specific project cost inputs.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

for 0 ABOA SF= -

Agency: 0 TIA PER ABOA SF= -$

January 0, 1900 Location: January 0, 1900 TOTAL TIA -$

RU Factor #DIV/0! RSF= -

Masterformat

CSI

System Elements TI* SHELL**

Div 1 General Requirements -$ -$ Div 2 Site work & Demolition -$ -$ Div 3 Concrete -$ -$ Div 4 Foundations / Masonry -$ -$ Div 5 Metals -$ -$ Div 6 Woods & Plastics -$ -$ Div 7 Thermal & Moisture -$ -$ Div 8 Doors & Windows -$ -$ Div 9 Finishes -$ -$ Div 10 Specialties -$ -$ Div 11 Equipment -$ -$ Div 12 Furnishings -$ -$ Div 13 Special Construction -$ -$ Div 15 General Construction -$ -$ Div 21 Fire Suppression -$ -$ Div 22 Plumbing -$ -$ Div 23 HVAC -$ -$ Div 26.1 Electrical -$ -$ Div 26.2 Lighting -$ -$ Div 27 Communications, Security & Other Elec. Systems -$ -$ Div 28.1 Electrical safety & Security -$ -$ Div 28.2 Security -$ -$ Div 32 Exterior -$ -$

Subtotal -$ -$ General Contractor Fee Percent -$ -$

Subtotal Construction Costs -$ -$ Architectural & Engineering Fees (NIC DID costs) lump sum -$ -$ Other Lessor Costs Established Under the Lease -$ -$

Subtotal Lessor's Costs: -$ -$ Lessor's Project Management Fee Percent -$

Total Price to Government: GRAND TOTAL -$ Cost per ABOA SF #DIV/0! #DIV/0!

Notes:

Cost per RSF #DIV/0! #DIV/0!

* Include all subcontractors' costs.

** Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information.

TENANT IMPROVEMENTS COST SUMMARY (TICS)

Trade Costs

File details come from the government source that posted it. Updated .