Exhibit J - Eng_Form_6203_Crane Standard Lift Plan.pdf

ENG Form PDF 42 KB Posted

Attached to
Barren River Lake Stilling Basin De-Water Rental Equipment with Operator
Solicitation number
W912QR25QA021
Issued by

About this file

The uploaded file appears to be a standard Adobe PDF loading page with a generic message about PDF viewer compatibility and instructions for downloading Adobe Reader. The document does not contain substantive contract-related information. It is a placeholder or loading screen that typically appears when a PDF file is not rendering correctly or is still processing. No specific contract details, requirements, or technical specifications are present in this document.

View the file

Other versions and copies of ENG Form 6203

File Revision Posted Attached to
A22 - Enclosure B - ENG_Form_6203_Standard Lift Plan (AUG-2024).pdf Same revision and size as this file Aug 2024 W. Kerr Scott Crane Rental

Who attaches ENG Form 6203

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

ENG FORM 6203, AUG 2024

Page of

PREVIOUS EDITIONS ARE OBSOLETE.

ENG FORM 6203, AUG 2024

Page of U.S. Army Corps of Engineers (USACE)

CRANE STANDARD LIFT PLAN

For use of this form, see EM 385-1-1; the proponent agency is CESO.

PURPOSE: This Standard Lift Plan will identify, evaluate, and address each item below. The load handling activity should only start after all setup and preparation requirements of the plan are in place, all required inspections and test of the LHE and rigging equipment have been completed, and all requirements of the plan continue to be met and no conditions exists that would preclude implementation of the plan.

LOAD HANDLING EQUIPMENT CRANE CONSIDERATIONS

Items

1. Are lifts within the crane's rated capacity? (e.g., based on boom height, radius) Yes No N/A

2. Has the team considered boom deflection?

3. Has team identified all potential crane boom obstructions?

4. Have environmental considerations been addresses? (wind, weather, lightening)

5. Has the team addressed electrical hazards? (overhead/underground)

a. Are clearance distances established?

b. Is a spotter required?

c. Is a public utility contact required?

6. Has the team barricaded the swing radius and have personnel been advised of hazards?

LOAD CONSIDERATIONS

Items

1. Have weights and Center of Gravity (COG) been determined?

Yes No N/A

2. Can anything inside / outside the loads shift during the lift?

3. Does rigging need protection from the loads?

4. Has the team removed all applicable anchor bolts, hold downs, or fasteners?

5. Is there a potential for binding? (Are load cells required to verify the loads are free?)

6. Are attachment points rated to take load weight?

7. Are the loads structurally capable of being lifted? (bending & twisting issues)

8. Is a critical lift plan required per Chapter 16-7, minimum plan requirements?

RIGGING CONSIDERATIONS

Items

1. Has the rigger inspected all the rigging?

Yes No N/A

2. Has the rigger calculated all sling angles?

3. Are shackles correctly sized for the sling eyes?

4. Are softeners needed?

PERSONNEL CONSIDERATIONS

Items

1. Are all personnel qualified for assigned tasks according to OSHA and EM 385-1-1?

(Operator, Lift Director, Rigger, Signal Person) Yes No N/A

2. Has the employer defined the roles and responsibilities for all involved?

(Operator, Lift Director, Rigger, Signal Person)

3. Will the team conduct a pre-lift meeting prior to conducting LHE operations?

AREA PREPARATION

Items

1. Has the team determined and prepared the locations for the load landing?

Yes No N/A

2. Are blocking and/or cribbing available to set loads on?

3. Have travel paths been determined and cordoned off?

4. Has the team notified other personnel in the area of the lift?

5. Has the team addressed ground bearing support?

TEAM SIGNATURES

Crane Operator Rigger Signal Person Other

LOAD CALCULATIONS

BEARING PRESSURES & GROUND CONDITIONS

LOAD CHART

OPERATOR RIGGER SIGNAL PERSON QUALIFICATIONS

SITE PLAN

1.0 darwin.chen@usace.army.mil 2023-05-17 Forms Design Team Darwin Chen 2024-08-31 Eng Form 6203

CRANE STANDARD LIFT PLAN

PrintButton1:
saveas:
currentPage:
pageCount:
TextField1:
DateField1:
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
Yes: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
No: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
N/A: 0
craneSignature:
riggerSignature:
signalSignature:
other1Signature:
other2Signature:
other3Signature:
other4Signature:
other5Signature:
TextField2:

File details come from the government source that posted it. Updated .