Exhibit_III_-_Wastewater_Treatment_Plants.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Transport of Liquid Biosolids
Solicitation number
26-B-95LS
Issued by
Volusia County, Florida

About this file

This is an equipment and facility requirements exhibit prepared by Volusia County, Florida, detailing specifications for liquid biosolids transport services across eight county-owned wastewater treatment plants. The exhibit identifies the locations, equipment requirements, estimated fill times, digester volumes, and dewatering status for each facility. The service involves routine pick-up of liquid biosolids from STP-1 (SW Regional WWTP in DeBary), STP-2 (Deltona N WWTP), STP-7 (S.E. Regional WWTP in Oak Hill), STP-8 (Halifax Plantation WWTP in Ormond Beach), STP-9 (Pelican Dune WWTP in Ormond Beach), STP-10 (Pine Island WWTP in Seville), STP-20 (New Hope Villas WWTP in Seville), and a Solid Waste Transfer Station in DeLand, with transport to the Southwest Regional Wastewater Treatment Facility in DeBary for dewatering. Facility volumes range from 20,000 to 135,000 gallons, with estimated fill times between 25 minutes and one hour.

The specific equipment requirements vary by facility location and include four-inch male camlock fittings, three-inch hoses, suction hoses, portable pumps, and tanker trucks ranging from 4,000 to 6,000-gallon capacity. The contractor must provide all labor, materials, equipment, and vehicles necessary for pick-up, transport, and transfer of liquid biosolids in compliance with all applicable federal, state, and local regulations. Six of the eight facilities currently have digester dewatering performed on-site, while two facilities do not. The exhibit serves as the foundational requirements document (ITB 19-B-87EM) for evaluating contractor proposals and determining necessary operational capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NUMBERFACILITYLOCATIONREQUIRED EQUIPMENTEST. TIMEDIGESTERDEWATERING
TO FILLVOL. (GAL.)PERFORMED
STP-1SW Regional WWTP800 DeBary Plantation Blvd., DeBary4-inch male camlock on truck for receiving liquid sludge, hose required.30-minutes60,000N/A
STP-2Deltona N WWTP290 Wolf Pack Run, Deltona3-inch hose on-site, no pump required.25-minutes60,000YES
STP-7S.E. Regional WWTP325 Beacon Light Road, Oak Hill3-inch hose on-site, no pump required.1-hour135,000YES
STP-8Halifax Plantation WWTPOld Dixie Highway, Ormond Beach4-inch male camlock fitting, portable pump required, 6,000 gallon tanker required.30-minutes20,000YES
STP-9Pelican Dune WWTP149 Pelican Dunes Dr., Ormond BeachSuction hose & 4,000 gallon pumper truck required.30-minutesN/ANO
STP-10Pine Island WWTP1646 Bass Ave., SevilleSuction hose & 4,000 gallon pumper truck required.45-minutesN/ANO
Solid WasteTransfer Station3151 E New York Ave Delanf fl 32724Suction hose & 4,000 gallon pumper truck required.30-minutesN/ANO
STP-20New Hope Villas WWTP117 New Hope Ave., SevilleSuction hose & 4,000 gallon pumper truck required.30-minutesN/ANO
&"-,Bold"&14ITB 19-B-87EM&"-,Bold"&14Exhibit 1
Wastewater Treatment Plants&G

Sheet2

Sheet3 image1.png image2.png

File details come from the government source that posted it. Updated .