The document is a comprehensive project manual for the Upper Pine River Fire Protection District (UPRFPD), detailing the construction of a new fire station and health clinic located at 297 Bayfield Center Drive in Bayfield, Colorado. The project involves constructing a single-story, 16,197 square foot facility with a mezzanine, including a four-bay apparatus bay, residential living quarters with 8 bedrooms, support spaces, and a health clinic featuring ambulance bay, x-ray, lab, critical care, and exam rooms. The project is set to be completed by August 15, 2027, with an anticipated 18-month construction schedule. Proposals from general contractor firms will be received via BidNet Direct until 5:00 PM local time on Friday, December 5, 2025.

The project manual includes detailed specifications for construction materials, installation requirements, and technical standards across multiple divisions, including concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, specialties, equipment, and various building systems such as fire suppression, plumbing, HVAC, electrical, communications, and electronic safety and security. The facility is designed as an essential services building with a 50-75 year expected lifespan, and the project encompasses site development, new utilities, asphalt, concrete curb and gutter, retaining walls, landscaping, and irrigation. The comprehensive documentation suggests a complex, multi-disciplinary construction project requiring high-level technical expertise and adherence to specific engineering and safety standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPRFPD -

Fire Station and Health Clinic 297 Bayfield Center Drive Bayfield, CO

Project Manual | Volume 01 | Divisions 00-33

PERMIT

2025.08.20 Project #122123.00

UPPER PINE RIVER

FIRE PROTECTION DSITRICT

FIRE STATION & HEALTH CLINIC

Project No: 122123.00

TABLE OF CONTENTS -1

Specifications Division 00-48

TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

000200 Signature Pages 002600 Procurement Substitutions Procedures 003000 Available Information Geotechnical Report 007200 General Conditions

DIVISION 01 - GENERAL REQUIREMENTS

011000 Summary 012100 Allowances 012200 Unit Prices 012300 Alternates 012500 Substitution Procedures Substitution Form 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013200 Construction Progress Documentation 013300 Submittal Procedures Digital Media Release Form 014000 Quality Requirements 014200 References 014339 Mockup 015000 Temporary Facilities and Controls 015639 Temporary Tree and Plant Protection 016000 Product Requirements 017300 Execution 017329 Cutting and Patching 017700 Closeout Procedures 017823 Operation and Maintenance Data 017836 Warranties 017839 Project Record Documents 017900 Demonstration and Training 018317 Air Barrier Performance Requirements

DIVISION 02 – EXISTING CONDITIONS

Not Used

DIVISION 03 – CONCRETE

033000 Cast-in Place Concrete 033001 Cast in Place Concrete for Site Work 033520 Concrete Sealer 033543 Polished Concrete Finishing 034500 Precast Architectural Concrete

DIVISION 04 - MASONRY

042010 Reinforced Unit Masonry 042200 Unit Masonry

044313.13 Anchored Stone Masonry Veneer

DIVISION 05 - METALS

TABLE OF CONTENTS -2

051200 Structural Steel Framing 053100 Steel Decking 054000 Cold Form Metal Framing 055000 Metal Fabrications 055100 Metal Stairs 055213 Pipe and Tube Railings 055216 Pipe and Tube Railings for Sitework

DIVISION 06 - WOOD AND PLASTICS

061000 Rough Carpentry 061800 Glued Laminated Construction 064023 Interior Architectural Woodwork

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

071113 Bituminous Damproofing 072100 Thermal Insulation 072600 Underslab Vapor Barrier

074113.16 Standing Seam Metal Roof Panels

074243.23 Composite Wall Panels (ACM)

075423 Thermoplastic Polyolefin Membrane (TPO) Roofing 076200 Sheet Metal Flashing and Trim 077200 Roof Accessories 077623 Deck Pavers 078100 Applied Fireproofing 078413 Penetration Firestopping 078443 Joint Firestopping 079200 Joint Sealants

DIVISION 08 - DOORS AND WINDOWS

081113 Hollow Metal Doors and Frames 081416 Flush Wood Doors 083113 Access Doors and Frames 083113 Access Doors and Frames (Mechanical) 083513 Folding Doors 083613 Sectional Doors 084113 Aluminum Framed Storefront and Entrances 087100 Door Hardware 088000 Glazing 089119 Fixed Louvers

DIVISION 09 – FINISHES

092116 Gypsum Board Shaft Wall Assembly 092216 Non-Structural Metal Framing 092900 Gypsum Board 093000 Tiling 095113 Acoustical Panel Ceiling 095426 Linear Wood Ceiling 096513 Resilient Wall Base and Accessories 096566 Resilient Athletic Flooring 098613 Tile Carpeting 099113 Exterior Painting 099123 Interior Painting

DIVISION 10 - SPECIALTIES

101100 Visual Display Board 101400 Signage

TABLE OF CONTENTS -3

102600 Wall and Door Protection 102800 Toilet and Bath Accessories 102819 Tub and Shower Doors 104413 Fire Extinguisher Cabinets 104416 Fire Extinguishers 105113 Metal Lockers

105143 Wire Mesh Storage Lockers 105163 Turnout Gear Lockers Mobile Units 107500 Flagpoles

DIVISION 11 - EQUIPMENT

113100 Residential Appliances

DIVISION 12 - FURNISHINGS

122413 Roller Window Shades 123216 Plastic Laminate Clad Casework

123623.13 Plastic Laminate Clad Countertops

123661 Simulated Stone Countertops 123663 Stainless Steel Countertops 129313 Bike Racks

DIVISION 13 - SPECIAL CONSTRUCTION

134900 Radiation Protection

DIVISION 14 - CONVEYING SYSTEMS

Not Used

DIVISION 21 – FIRE SUPPRESSION

210500 Common Work Results for Fire Suppression Equipment 211119 Fire Department Connections 211313 Wet-Pipe Sprinkler Systems

DIVISION 22 – PLUMBING

220500 Common Work Results for Plumbing 220513 Common Motor Requirements for Plumbing Equipment 220519 Meters and Gages for Plumbing Piping 220523 General Duty Valves for Plumbing Piping 220529 Hangers and Supports for Plumbing Piping 220548 Vibration and Seismic Controls for Plumbing Piping and Equipment 220593 Testing, Adjusting, and Balancing for Plumbing 220719 Plumbing Piping Insulation 220800 Commissioning of Plumbing Systems 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties

221123.21 Inline, Domestic-Water Pumps

221316 Sanitary Waste and Vent Piping 221319 Sanitary Waste Piping Specialties

221319.13 Sanitary Drains

221323 Sanitary Waste Interceptors 221413 Facility Storm Drainage Piping 221423 Storm Drainage Piping Specialties 221513 General-Service Compressed-Air Piping 223400 Fuel-Fired, Domestic-Water Heaters 224100 Plumbing Fixtures

DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING

TABLE OF CONTENTS -4

220500 Common Work Results for HVAC 230513 Common Motor Requirements for HVAC Equipment 230519 Meters and Gages for HVAC Piping 230529 Hangers and Support for HVAC Piping and Equipment 230548 Vibration and Seismic Controls for HVAC 230553 Identification for HVAC Piping and Equipment 230593 Testing, Adjusting, and Balancing for HVAC 230713 Duct Insulation 230719 HVAC Piping Insulation 230800 Commissioning of HVAC Systems 230923 Direct Digital Control (DDC) System for HVAC

230923.12 Control Dampers

230923.14 Flow Instruments

230923.16 Gas Instruments

230923.18 Leak Detection Instruments

230923.23 Pressure Instruments

230923.27 Temperature Instruments

231123 Facility Natural-Gas Piping 233113 Metal Ducts 233300 Air Duct Accessories 233346 Flexible Ducts 233416 Centrifugal HVAC Fans

233713.13 Air Diffusers

233713.23 Registers and Grilles

235523.13 Low-Intensity, Gas-Fired, Radiant Heaters

235533.13 Oil-Fired Unit Heaters

237433 Dedicated Outdoor-Air Units 238126 Split-System Air-Conditioners 238129 Variable-Refrigerant-Flow HVAC Systems

238239.19 Wall and Ceiling Unit Heaters

DIVISION 26 – ELECTRICAL

260500 Common work Results for Electrical 260519 Low Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceway and Boxes for Electrical Systems 260548 Vibration and Seismic Controls for Electrical Systems 260553 Identification for Electrical Systems 260923 Lighting Control Devices 260943 Network Lighting Controls 262413 Switchboards 262416 Panelboards 262726 Wiring Devices 262743 Electric-Vehicle Service Equipment – AC Level 1 and Level 2 262813 Fuses 262816 Enclosed Switches and Circuit Breakers 263213 Engine Generators 263600 Transfer Switches 264113 Lightning Protection for Structures 264313 Surge Protection for Low-Voltage Electrical Power Circuits 265100 Interior Lighting 265600 Exterior Lighting

DIVISION 27 – COMMUNICATIONS

270010 Supplemental Requirements for Communications

TABLE OF CONTENTS -5

270526 Grounding and Bonding for Communications Systems 270528 Pathways for Communications Systems 270529 Hangers and Supports for Communications Systems 270536 Cable Trays for Communications Systems 270544 Sleeves and Sleeve Seals for Communications Pathways and Cabling 270553 Identification for Communications Systems 271116 Communications Racks, Frames and Enclosures 271323 Communications Optical Fiber Backbone Cabling 271513 Communications Copper Horizontal Cabling 271523 Communications Optical Fiber Horizontal Cabling

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

283111 Digital, Addressable Fire-Alarm System

DIVISION 31 – EARTHWORK

311000 Clearing and Grubbing (Landscape) 311000 Clearing (Civil) 312000 Earthwork (Landscape) 312000 Earth Moving (Civil) 312500 Erosion and Sediment Control 312316 Excavation and Backfilling of Trenches 313250 Watering

DIVISION 32 – EXTERIOR IMPROVEMENTS

320190 Tree and Plant Protection 321116 Aggregate Base Course 321216 Asphalt Pavement 321313 Concrete Walks, Curbs, and Miscellaneous Flatwork (Landscape) 321313 Concrete Pavement (Civil) 321723 Pavement Marking 321373 Concrete Paving Joint Sealants (Landscape) 321373 Concrete Paving Joint Sealants (Civil) 323119 Decorative Metal Fences and Gates 328000 Irrigation System 329113 Soil Preparation 322020 Native Seeding 329300 Trees, Plants and Groundcovers

DIVISION 33 – UTILITIES

331000 Water Utility 333000 Sanitary Sewer Utility 334100 Storm and Sanitary 334600 Subdrainage

END OF TABLE OF CONTENTS

SEALS PAGE 000200- 1

DOCUMENT 000200 - SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

08/08/202520

SEALS PAGE 000200- 2

END OF DOCUMENT 000200

PROCUREMENT SUBSTITUTION PROCEDURES 002600 - 1

DOCUMENT 002600 - PROCUREMENT SUBSTITUTION PROCEDURES

1.1 SUMMARY

A. This document specifies procedural requirements for substitution requests and approvals that are applicable beginning on the date on which the Drawings, Project Manual and other Bidding Documents are made available by the Architect to the General Contractor for pricing, and ending on the date of submission by the General Contractor of a Pricing Proposal to the Owner. These limitations and procedural requirements apply both to substitution requests by subcontract bidders and to change proposals initiated directly by the General Contractor before the submission of the Pricing Proposal.

B. Limitations on change proposals and substitution requests after the acceptance by the Owner of the Pricing and those made during the construction phase of the Project are specified in Section 01 25 00 Substitution Procedures.

1.2 CHANGES AND SUBSTITUTIONS

A. The General Contractor shall base its Pricing proposal and subcontract bidders shall base their bids upon products and materials specifically named in the Specifications or on the Drawings, or as accepted in Addendum issued by the Architect.

B. Items specified under manufacturers' names and catalog numbers are intended as basis of design and quality, provide listed material unless noted otherwise.

C. Items other than those specifically named in the Specifications or as shown on the Drawings will be considered provided request for acceptance of such items is received by the Architect in writing by;

1. 12:00 Noon, Seven Calendar Days Before Date Set by the Owner and Contractor for

Submission of Pricing Proposal

D. Requests for substitution by subcontractors shall be made to the General Contractor. The General Contractor shall review the substitution request for compliance with the requirements of this Document and the Contract Documents, and, at the General Contractor's sole discretion, the General Contractor may forward the substitution request to the Architect for consideration.

Requests for substitution of mechanical and electrical items may be sent by the General Contractor directly to copy to the Architect.

E. Each request for substitution must be accompanied by complete catalog sheets and other pertinent data, which will make it possible to properly evaluate the items proposed for use. If, in the Architect's opinion the item or items proposed for use are equal to the items specified in design, quality, material and function, Architect will issue an Addendum listing all such items acceptance for use. Requests for substitution received after above time and date will not be considered prior to execution of the contract.

F. Only one request for substitution for each product will be considered.

PROCUREMENT SUBSTITUTION PROCEDURES 002600 - 2

1.3 SUBSTITUTION REQUEST SUBMITTAL PROCEDURES

A. Submit two copies of each request. Submit separate request for each substitution. Utilize the Substitution Request Form (During the Bidding/Negotiating Stage) included in this Project Manual. See Document 00 43 25. Substitutions will be considered only when the proper form is completed and included with the submittal and specified data. address, trade name of products, and model or catalog number. List fabricators and suppliers as appropriate.

1. Substitutions will not be allowed after bidding/negotiating Statge

B. Document each request with complete data substantiating compliance of proposed substitution with requirements of Contract Documents: Attach Product Data. Give itemized comparison of proposed substitution with specified product, listing variation, and reference to specification section and article numbers. Give quality and performance comparison between proposed substitution and specified product. List availability of maintenance services and replacement materials. State effect of substitution on construction schedule, and changes required in other work or products. Reference UL Fire Resistance Directory design number if applicable.

1.4 CONTRACTOR REPRESENTATION

A. By making Substitution Request, Contractor represents it has investigated proposed product and has determined that it is equal to or superior in all respects to specified product. Contractor also agrees to provide same warranty for substitution as for specified product, and, if substitution is accepted, to coordinate installation of accepted substitute, making such changes as may be required for Work to be complete in all respects, and to waive claims for additional costs related to substitution which may later become apparent.

B. By making Request for Substitution, Contractor represents that, if substitution is accepted, and If substituted products do not meet or exceed above requirements, whether before, during, or after incorporation into Work, Contractor shall, at no additional cost to Owner, replace substituted products with products originally specified.

1.5 ARCHITECT'S REVIEW

A. Architect will not make exhaustive attempt to determine that products proposed for substitution are equal to, or can be modified in order to be equal to specified products. If accepted by Architect, products proposed for substitution will be accepted subject to modifications by manufacturer, if necessary, to meet detailed requirements of Drawings and Specifications.

END OF SECTION 002600

AVAILABLE INFORMATION 003000 - 1

DOCUMENT 003000 – AVAILABLE INFORMATION

1.1 INFORMATION FOR REFERENCE

A. The following data is offered solely for reference and is not to be considered a part of the Contract Documents.

B. In preparing its bid, each bidder shall consider and evaluate data contained in the following documents as well as the Drawings and Project Manual prepared by the Architect. The data contained in the listed documents is believed to be reliable; however, the Architect does not guarantee its accuracy or completeness.

1.2 GEOTECHNICAL DATA

A. Each Bidder shall be fully familiar with the following documents which have been prepared for the Owner by its separate consultant.

B. Subsurface Investigation (Geotechnical Reports): Attached at the end of this document

C. Geotechnical data is offered solely for reference and is not to be considered a part of the Contract Documents. The data contained in the document prepared for the Owner by its separate consultant is believed to be reliable; however, the Architect does not guarantee its accuracy or completeness

1.3 ASBESTOS REPORT

A. The following document is provided upon request.

B. Each Bidder shall be fully familiar with the following documents which have been prepared for the Owner by its separate consultant.

END OF SECTION 002600

AVAILABLE INFORMATION 003000 - 2

GEOTECHNICAL ENGINEERING STUDY

PROPOSED FIRE STATION #01 AND HEALTH CLINIC

UPPER PINE FIRE PROTECTION

BAYFIELD, COLORADO

September 18, 2023

PREPARED FOR:

Bruce Evans

(970) 884-9508 bevans@upperpinefpd.org

PROJECT NO. 58023GE

mailto:bevans@upperpinefpd.org

Project No. 58023GE

Table of Contents

1.0 REPORT INTRODUCTION

1.1 Proposed Construction

2.0 FIELD STUDY

2.1 Site Description and Geomorphology

2.2 Subsurface Soil and Water Conditions

3.0 LABORATORY STUDY

4.0 FOUNDATION RECOMMENDATIONS

4.1 Shallow Foundation System Concepts

4.1.1 Spread Footings

4.1.2 General Shallow Foundation Considerations

5.0 RETAINING STRUCTURES

6.0 SUBSURFACE DRAIN SYSTEM

7.0 CONCRETE FLATWORK

7.1 Interior Concrete Slab-on-Grade Floors

7.1.1 Capillary and Vapor Moisture Rise

7.1.2 Slab Reinforcement Considerations

7.2 Exterior Concrete Flatwork Considerations

7.3 General Concrete Flatwork Comments

8.0 CONSTRUCTION CONSIDERATIONS

8.1 Fill Placement Recommendations

8.1.1 Natural Soil Fill

8.1.2 Granular Compacted Structural Fill

8.1.3 Deep Fill Considerations

8.2 Excavation Considerations

8.2.1 Excavation Cut Slopes

8.3 Utility Considerations

8.4 Exterior Grading and Drainage Comments

8.5 Landscaping Considerations

8.6 Soil Sulfate and Corrosion Issues

8.7 Radon Issues

8.8 Mold and Other Biological Contaminants

9.0 PAVEMENT SECTION THICKNESS DESIGN RECOMMENDATIONS

9.1 Traffic Estimates

9.2 Asphalt Pavement Design Recommendations

9.3 General Asphalt Pavement Recommendations

9.4 Portland Cement Concrete Pavement Recommendations

10.0 CONSTRUCTION MONITORING AND TESTING

11.0 CONCLUSIONS

12.0 LIMITATIONS

FIELD STUDY RESULTS ...................................................................................................... Appendix A Log of Test Borings LABORATORY TEST RESULTS ........................................................................................ Appendix B Sieve and Atterberg Limit Test Results Swell-Consolidation Test Results

1.0 REPORT INTRODUCTION

This report presents our geotechnical engineering recommendations for the proposed Fire Station #01 and Health Clinic to be located on Lot 1 Bayfield Center, TBD Sower Drive in Bayfield, Colorado. This report was requested by Mr. Bruce Evans, Upper Pine River Fire Protection District and was prepared in accordance with our proposal dated July 11, 2023, Proposal No.

23273P.

As outlined within our proposal for services for this project the client is responsible for appropriate distribution of this report to other design professionals and/or governmental agencies unless specific arrangements have been made with us for distribution.

Geotechnical engineering is a discipline which provides insight into natural conditions and site characteristics such as; subsurface soil and water conditions, soil strength, swell (expansion) potential, consolidation (settlement) potential, and often slope stability considerations. The information provided by the geotechnical engineer is utilized by many people including the project owner, architect or designer, structural engineer, civil engineer, the project builder and others. The information is used to help develop a design and subsequently implement construction strategies that are appropriate for the subsurface soil and water conditions, and slope stability considerations.

We are available to discuss any aspect of this report with those who are unfamiliar with the recommendations, concepts, and techniques provided below.

This geotechnical engineering report is the beginning of a process involving the geotechnical engineering consultant on any project. It is imperative that the geotechnical engineer be consulted throughout the design and construction process to verify the implementation of the geotechnical engineering recommendations provided in this report. Often the design has not been started or has only been initiated at the time of the preparation of the geotechnical engineering study. Changes in the proposed design must be communicated to the geotechnical engineer so that we have the opportunity to tailor our recommendations as needed based on the proposed site development and structure design.

The following outline provides a synopsis of the various portions of this report;

Sections 1.0 provides an introduction and an establishment of our scope of service.

Sections 2.0 and 3.0 of this report present our geotechnical engineering field and laboratory studies Sections 4.0 through 7.0 presents our geotechnical engineering design parameters and recommendations which are based on our engineering analysis of the data obtained.

Section 8.0 provides a brief discussion of construction sequencing and strategies which may influence the geotechnical engineering characteristics of the site. Ancillary information such as some background information regarding soil corrosion and radon considerations is also presented as general reference.

Section 9.0 presents our pavement section recommendations.

Section 10.0 provides our general construction monitoring and testing recommendations.

Sections 11.0 and 12.0 provides our conclusions and limitations.

The data used to generate our recommendations are presented throughout this report and in the attached figures.

All recommendations provided within this report must be followed in order to achieve the intended performance of the foundation system and other components that are supported by the site soil.

1.1 Proposed Construction

Architectural details and grading plans were not available at the time of this report. We understand the proposed construction will likely be an approximately 21,000 ft², single story fire station and health clinic supported by a steel reinforced concrete foundation system. A possible mezzanine structure would be located in the fire truck bay on the north end of the proposed construction, and the health clinic would be located on the south end. Grading for the structure is assumed to be relatively minor with cuts of approximately 3 to 5 feet below the adjacent ground surface. We assume relatively light foundation loadings, typical of the proposed type of construction.

When final building location, grading and loading information have been developed, we should be notified to re-evaluate the recommendations presented in this report.

2.0 FIELD STUDY

2.1 Site Description and Geomorphology

The approximate 2.68-acre project site was vacant at the time of our field study. The site is relatively flat, with a slight slope towards the west. The Pine River has influenced the geology of the project area, with river terrace deposits of gravel and cobble, overlain by loess (wind-blown) deposits. There were several underground utility lines that run across the building site orientated north-south. This site is bordered by a commercial lot to the north, Sower Drive to the east, Bayfield Center Drive to the south, and County Road 501 to the west.

2.2 Subsurface Soil and Water Conditions

We advanced six structural test bores and three pavement test bores for a combined total of nine test borings in the vicinity of the proposed structure and parking lot. A schematic showing the approximate boring locations is provided below as Figure 1. The logs of the soils encountered in our test borings are presented in Appendix A.

Figure 1: Locations of Exploratory Borings. Adapted from SDP Plans.

The schematic presented above was prepared using notes and field measurements obtained during our field exploration and is intended to show the approximate test boring locations for reference purposes only.

The subsurface conditions encountered in our test borings consisted of a medium stiff to hard lean clay with sand (CL) from the ground surface down to 9 to 15 feet throughout the project site.

In TB-3, we encountered a gravelly lean clay with sand (CL) from 9 to 13 feet. Underlying the CL soils, we encountered a gravelly clay with sand and cobbles which was drilled to a maximum depth explored of 19 feet, where practical auger refusal occurred on cobbles. Auger drilling refusal was also encountered at 17 feet in TB-6.

Free subsurface water was encountered at a depth of approximatley 15 feet in TB-1 and 13 feet in TB-6 below the adjacent ground surface during drilling. We suspect that the subsurface water elevation and soil moisture conditions will be influenced by snow melt and/or precipitation and local irrigation.

The logs of the subsurface soil conditions encountered in our test borings are presented in Appendix A. The logs present our interpretation of the subsurface conditions encountered in the test borings at the time of our field work. Subsurface soil and water conditions are often variable across relatively short distances. It is likely that variable subsurface soil and water conditions will be encountered during construction. Laboratory soil classifications of samples obtained may differ from field classifications.

TB-1

TB-2

TB-3 TB-4

TB-5

TB-6

PB-1

PB-2

PB-3

3.0 LABORATORY STUDY

The laboratory study included tests to estimate the strength, swell and consolidation potential of the soils tested. We performed the following tests on select samples obtained from the test borings.

The laboratory test results are provided in Appendix B.

• Moisture Content and Dry Density

• Sieve Analysis (Gradation)

• Atterberg Limits, Liquid Limit, Plastic Limit and Plasticity Index

• Swell Consolidation Tests

• Moisture Content Dry Density Relationship Test

• California Bearing Ratio Test

A synopsis of some of our laboratory data for some of the samples tested is tabulated below.

Sample Designation

Percent Passing

#200 Sieve

Atterberg Limits

LL/PI

Moisture Content (percent)

Dry Density

(PCF)

Estimated Load-Back

Swell Pressure

(PSF)

Swell or Consolidation

Potential

TB-1 @ 0-4’ 72 28/11 2.9 - - -

TB-1 @ 4’ - - 6.7 106.0 1,600

1.4

(% under 500 psf load)

TB-2 @ 2’ - - 5.3 105.5 1,110

2.1

(% under 100 psf load)

TB-3 @ 9-14’ 57 39/24 6.7 - - -

TB-4 @ 2’ - - 6.2 106.3 1,880

2.9

(% under 100 psf load)

TB-6 @ 0-4’ 83 32/14 5.8 - - -

TB-6 @ 4’ - - 8.4 106.7 1,920

2.1

(% under 500 psf load)

Bulk Subgrade 76 30/13 6.5 - - -

*NOTES:

1. We determine the swell pressure as measured in our laboratory using the graphically estimated load-back swell pressure method.

4.0 FOUNDATION RECOMMENDATIONS

There are two general types of foundation system concepts, “deep” and “shallow”, with the designation being based on the depth of support of the system. We have provided a discussion of viable foundation system concepts for this project below. The choice of the appropriate foundation system for the project is best made by the project structural engineer or project architect. We should be contacted once the design choice has been made to provide consultation regarding implementation of our design parameters.

Deep foundation system design concepts which include isolation of shallow components including floor systems from shallow soils are less likely to experience post-construction movement due to volume changes in the site soil. Deep foundation system design concepts may be viable for this project; however, we anticipate that only a shallow foundation system design is being considered at this time. We are available to develop deep foundation design parameters if desired.

4.1 Shallow Foundation System Concepts

Subsurface data indicate that lean clay with sand (CL) will likely be the predominant soil type encountered beneath shallow foundations. Based on the laboratory analysis, the soils encountered in our borings were found to have a low to moderate swell/expansion potential. The anticipated soils at the foundation level are considered suitable for shallow foundation support.

There are numerous types of shallow foundation systems and variants of each type. Shallow foundation system concepts discussed below include:

• Spread Footings (continuous) and stem walls

The integrity and long-term performance of each type of system is influenced by the quality of workmanship which is implemented during construction. It is imperative that all excavation and fill placement operations be conducted by qualified personnel using appropriate equipment and techniques to provide suitable support conditions for the foundation system.

4.1.1 Spread Footings

A spread footing foundation system consists of a footing which dissipates, or spreads, the loads imposed from the stem wall (or beam) from the structure above. The soil samples tested from the anticipated support elevations in our test borings had a measured swell pressure of up to about 1,920 pounds per square foot and a swell potential magnitude of up to about 2.9 percent under a 100 pound per square foot surcharge load. The owner must understand that regardless of the expansive soil mitigation design concepts presented below, if the swell pressure generated by the expansive soil on this site exceeds the minimum dead load which is imposed by the spread footing or other structural components, and the expansive site soils become wetted, uplift of the foundation system and other structural components is highly likely. Drilled piers, or other deep foundation system design will provide the least likelihood of post construction movement associated with soil volume changes.

The actual magnitude of the potential uplift of the foundation system depends on the volume (or depth) of the support soils which become moistened after construction. It is difficult to predict the amount of soil which will become moistened after construction, some theories suggest that with time the entire soil mantle may become moistened. Based on our experience in the area we feel that it is possible for at least 3 to 4 feet of soil below the footings to be influenced by subsurface moisture. Based on the assumed depth of moistened soil, laboratory test data, and the soil characteristics we estimate that the magnitude of the potential uplift associated with swelling of the expansive support soil materials may be in the range of about 1 to 1¼ inches. If the entire soil mantle becomes moistened the total potential uplift may be considerably higher. The project structural engineer or architect should determine if the potential uplift is tolerable for the proposed structure on this project site.

Uplift associated with swelling soils occurs only where the foundation support soils have been exposed to water; therefore, the uplift may impose shear stresses in the foundation system. The magnitude of the imposed shear stress is related to the swell pressure of the support soil, but is difficult to estimate. Properly designed and constructed continuous spread footings with stem walls (or beams) have the ability to distribute the forces associated with swelling of the support soil. The rigidity of the system helps reduce differential movement and associated damage to the overlying structure. Swelling of the soil supporting isolated pad footings will result in direct uplift of the columns and structural components supported by the columns. Damage to the structure due to this type of movement can be severe. We recommend that isolated pad footings be avoided and that the foundation system be designed as rigid as is reasonably possible.

High foundation dead load, careful preparation of the support soils, placement of granular compacted structural fill, careful placement and compaction of stem wall backfill and positive surface drainage adjacent to the foundation system all help reduce the influence of swelling soils on the performance of the spread footing foundation system.

We recommend that the footings be designed with a high dead load and supported by a layer of moisture conditioned and compacted natural soil which is overlain by a layer of compacted structural fill material. This concept is outlined below:

• The foundation excavation should be excavated to at least 18 inches below the proposed footing support elevation.

• The natural soils exposed in the bottom of the excavation should be scarified to a depth of about 6 to 8 inches

• The scarified soil should be thoroughly moisture conditioned to about 2 percent above the laboratory determined optimum moisture content and then compacted.

• After completion of the compaction of the moisture conditioned natural soil an 18 inch thick layer of granular aggregate base course structural fill material should be placed, moisture conditioned and compacted.

• The moisture conditioned natural soil material and the granular soils should be compacted as discussed under the Compaction Recommendations portion of this report below.

• In the absence of structural engineering design and for general geotechnical engineering purposes, we recommend the stem walls be designed to act as beams and reinforced with continuous steel reinforcement, 4 reinforcement bars, 2 top and 2 bottom. Taller walls may require additional reinforcement bar.

• The structural engineer should be contacted to provide the appropriate reinforcement bar diameter and locations.

We recommend that particular attention and detail be given to the following aspects of the project construction for this lot;

• A subsurface drain system should be installed adjacent to the structure foundation system.

Concepts for a subsurface drain system are presented in Section 6.0 of this report.

• The landscaping drainage concept provided in Section 8.5 below is imperative for this site to limit the moisture available to the foundation bearing soils.

• The exterior foundation backfill must be well compacted and moisture conditioned to above optimum moisture content. Recommendations for exterior foundation backfill are provided later in this report.

We recommend below-grade construction, such as retaining walls, crawlspace and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain and wall drain system. Topographic conditions on the site may influence the ability to install a subsurface drain system which promotes water flow away from the foundation system. The subsurface drain system concept is discussed under the Subsurface Drain System section of this report below.

The footing embedment is a relatively critical, yet often overlooked, aspect of foundation construction. The embedment helps develop the soil bearing capacity, increases resistance of the footing to lateral movement and decreases the potential for rapid moisture changes in the footing support soils, particularly in crawl space areas. Interior footing embedment reduces the exposure of the crawl space support soils to dry crawl space air. Reduction in drying of the support soil helps reduce downward movement of interior footings due to soil shrinkage.

All footings should have a minimum depth of embedment of at least one 1 foot. The embedment concept is shown below.

Spread footings located away from sloped areas may be designed using the allowable gross bearing capacity information tabulated below.

Minimum Depth of Embedment (Feet)

Continuous Footing Design Capacity (psf)

Isolated Footing Design Capacity (psf)

1 1,700 Not Recommended 2 1,900 Not Recommended 3 2,100 Not Recommended

The bearing capacity values tabulated above may be increased by 20 percent for transient conditions associated with wind and seismic loads. Snow loads are not transient loads.

The bearing capacity values above were based on footing placed directly on the natural soils and on a continuous spread footing width of 1.5 feet. Larger footings and/or footings placed on a blanket of compacted structural fill will have a higher design soil bearing capacity. Development of the final footing design width is usually an iterative process based on evaluation of design pressures, footing widths and the thickness of compacted structural fill beneath the footings. We should be contacted as the design process continues to re-evaluate the design capacities above based on the actual proposed footing geometry.

The settlement of the spread footing foundation system will be influenced by the footing size and the imposed loads. We estimated the total post construction settlement of the footings based on our laboratory consolidation data, the type and size of the footing. Our analysis below assumed that the highest bearing capacity value tabulated above was used in the design of the footings. The amount of post construction settlement may be reduced by placing the footings on a blanket of compacted structural fill material.

The estimated settlement for continuous footing with a nominal width of about 1½ to 2½ feet are tabulated below.

Thickness of Compacted Structural Fill (feet)

Estimated Settlement (inches)

0 ¾ - 1 B/2 ½ - ¾ B ¼ - ½

B is the footing width

The compacted structural fill should be placed and compacted as discussed in the Construction Considerations, “Fill Placement Recommendations” section of this report, below. The zone of influence of the footing (at elevations close to the bottom of the footing) is often approximated as being between two lines subtended at 45 degree angles from each bottom corner of the footing.

The compacted structural fill should extend beyond the zone of influence of the footing as shown in the sketch below.

A general and simple rule to apply to the geometry of the compacted structural fill blanket is that it should extend beyond each edge of the footing a distance which is equal to the fill thickness.

We estimate that the footings designed and constructed above will have a total post construction settlement of about 1 inch or less.

All footings should be support at an elevation deeper than the maximum depth of frost penetration for the area. This recommendation includes exterior isolated footings and column supports. Please contact the local building department for specific frost depth requirements.

The post construction differential settlement may be reduced by designing footings that will apply relatively uniform loads on the support soils. Concentrated loads should be supported by footings that have been designed to impose similar loads as those imposed by adjacent footings.

Under no circumstances should any footing be supported by more than 3 feet of compacted structural fill material unless we are contacted to review the specific conditions supporting these footing locations.

The design concepts and parameters presented above are based on the soil conditions encountered in our test borings. We should be contacted during the initial phases of the foundation excavation at the site to assess the soil support conditions and to verify our recommendations.

4.1.2 General Shallow Foundation Considerations

Some movement and settlement of any shallow foundation system will occur after construction.

Movement associated with swelling soils also occurs occasionally. Utility line connections through and foundation or structural component should be appropriately sleeved to reduce the potential for damage to the utility line. Flexible utility line connections will further reduce the potential for damage associated with movement of the structure.

5.0 RETAINING STRUCTURES

We understand that laterally loaded walls will be constructed as part of this site development.

Lateral loads will be imposed on the retaining structures by the adjacent soils and, in some cases, additional surcharge loads will be imposed on the retained soils from vehicles or adjacent structures. The loads imposed by the soil are commonly referred to as lateral earth pressures. The magnitude of the lateral earth pressure forces is partially dependent on the soil strength characteristics, the geometry of the ground surface adjacent to the retaining structure, the subsurface water conditions and on surcharge loads.

The site soils have a measured swell pressure of 1,920 pounds per square foot. A 1,920 pound per square foot swell pressure will exert approximately 15,360 pounds of force per lineal foot for a wall that retains 8 feet of soil. Due to the expansive nature of the site soils we do not recommend that the natural clay soils be used for retaining wall backfill. The retaining walls may be designed using the equivalent fluid pressure values for imported granular soil that are tabulated below.

Type of Lateral Earth Pressure Level Granular Soil Backfill (pounds per cubic foot/foot)

Active 35 At-rest 55 Passive 460

Allowable Coefficient of Friction

0.45

The granular soil that is used for the retaining wall backfill may be permeable and may allow water migration to the foundation support soils. There are several options available to help reduce water migration to the foundation soils, two of which are discussed here. An impervious geotextile layer and shallow drain system may be incorporated into the backfill, as discussed in Section 9.5, Landscaping Considerations, below. A second option is to place a geotextile filter material on top of the granular soils and above that place about 1½ to 2 feet of moisture conditioned and compacted site clay soils. It should be noted that if the site clay soils are used volume changes may occur which will influence the performance of overlying concrete flatwork or structural components.

The values tabulated above are for well drained backfill soils. The values provided above do not include any forces due to adjacent surcharge loads or sloped soils. If the backfill soils become saturated the imposed lateral earth pressures will be significantly higher than those tabulated above.

The granular imported soil backfill values tabulated above are appropriate for material with an angle of internal friction of 35 degrees, or greater. The granular backfill must be placed within the retaining structure zone of influence as shown below in order for the lateral earth pressure values tabulated above for the granular material to be appropriate.

If an open graded, permeable, granular backfill is chosen it should not extend to the ground surface. Some granular soils allow ready water migration which may result in increased water access to the foundation soils. The upper few feet of the backfill should be constructed using an impervious soil such as silty-clay and clay soils from the project site, if these soils are available.

The 55 degree angle shown in the figure above is approximately correct for most clay soils. The angle is defined by 45 + (φ/2) where “φ” if the angle of internal friction of the soil.

Backfill should not be placed and compacted behind the retaining structure unless approved by the project structural engineer. Backfill placed prior to construction of all appropriate structural members such as floors, or prior to appropriate curing of the retaining wall concrete, may result in severe damage and/or failure of the retaining structure.

6.0 SUBSURFACE DRAIN SYSTEM

We recommend below-grade construction, such as retaining walls, crawlspace and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain and wall drain system. Exterior retaining structures may be constructed with weep holes to allow subsurface water migration through the retaining structures. Topographic conditions on the site may influence the ability to install a subsurface drain system which promotes water flow away from the foundation system. The subsurface drain system concept is discussed under the Subsurface Drain System section of this report below.

A drain system constructed with a free draining aggregate material and a 4 inch minimum diameter perforated drain pipe should be constructed adjacent to retaining structures and/or adjacent to foundation walls. The drain pipe perforations should be oriented facing downward.

The system should be protected from fine soil migration by a fabric-wrapped aggregate which surrounds a rigid perforated pipe. We do not recommend use of flexible corrugated perforated pipe since it is not possible to establish a uniform gradient of the flexible pipe throughout the drain system alignment. Corrugated drain tile is perforated throughout the entire circumference of the pipe and therefore water can escape from the perforations at undesirable locations after being collected. The nature of the perforations of the corrugated material further decreases its effectiveness as a subsurface drain conduit.

The drain should be placed at each level of excavation and at least 12 inches below lowest adjacent finish floor or crawlspace grade. The drain system pipe should be graded to surface outlets or a sump vault. The drain system should be sloped at a minimum gradient of about 2 percent, but site geometry and topography may influence the actual installed pipe gradient. Water must not be allowed to pool along any portion of the subsurface drain system. An improperly constructed subsurface drain system may promote water infiltration to undesirable locations. The drain system pipe should be surrounded by about 2 to 4 cubic feet per lineal foot of free draining aggregate. If a sump vault and pump are incorporated into the subsurface drain system, care should be taken so that the water pumped from the vault does not recirculate through pervious soils and obtain access to the basement or crawl space areas. An impervious membrane should be included in the drain construction for grade beam and pier systems or other foundation systems such as interrupted footings where a free pathway for water beneath the structure exists. A generalized subsurface drain system concept is shown below.

There are often aspects of each site and structure which require some tailoring of the subsurface drain system to meet the needs of individual projects. Drain systems that are placed adjacent to void forms must include provisions to protect and support the impervious liner adjacent to the void form. We are available to provide consultation for the subsurface drain system for this project, if desired.

Water often will migrate along utility trench excavations. If the utility trench extends from areas above the site, this trench may be a source for subsurface water within the proposed basement or crawl space. We suggest that the utility trench backfill be thoroughly compacted to help reduce the amount of water migration. The subsurface drain system should be designed to collect subsurface water from the utility trench and direct it to surface discharge points.

7.0 CONCRETE FLATWORK

We anticipate that both interior and exterior concrete flatwork will be considered in the project design. Concrete flatwork is typically lightly loaded and has a limited capability to resist shear forces associated with uplift from swelling soils and/or frost heave. It is prudent for the design and construction of concrete flatwork on this project to be able to accommodate some movement associated with swelling soil conditions.

The soil samples tested have a measured swell pressure of about 1,920 pounds per square foot and a magnitude swell potential of about 2.9 percent under a 100 pound per square foot surcharge load. Due to the measured swell potential and swell pressure, interior floors supported over a crawl space are less likely to experience movement than are concrete slabs support on grade. The following recommendations are appropriate for garage floor slabs and for interior floor slabs if the owner is willing to accept the risk of potential movement beyond normal tolerances.

7.1 Interior Concrete Slab-on-Grade Floors

A primary goal in the design and construction of concrete slab-on-grade floors is to reduce the amount of post construction uplift associated with swelling soils, or downward movement due to consolidation of soft soils. A parallel goal is to reduce the potential for damage to the structure associated with any movement of the slab-on-grade which may occur. There are limited options available to help mitigate the influence of volume changes in the support soil for concrete slab-on-grade floors, these include:

• Preconstruction scarification, moisture conditioning and re-compaction of the natural soils in areas proposed for support of concrete flatwork, and/or,

• Placement and compaction of granular compacted structural fill material

Damage associated with movement of interior concrete slab-on-grade floor can be reduced by designing the floors as “floating” slabs. The concrete slabs should not be structurally tied to the foundations or the overlying structure. Interior walls or columns should not be supported on the interior floor slabs. Movement of interior walls or columns due to uplift of the floor slab can cause severe damage throughout the structure. Interior walls may be structurally supported from framing above the floor, or interior walls and support columns may be supported on interior portions of the foundation system. Partition walls should be designed and constructed with voids above, and/or below, to allow independent movement of the floor slab. This concept is shown below.

The sketch above provides a concept. If the plans include isolation of the partition walls from the floor slab, the project architect or structural engineer should be contacted to provide specific details and design of the desired system.

Due to the expansive nature of the soils tested we do not recommend that interior floor slabs in finished areas be considered unless the owner thoroughly understands the implications of movement of these structural components. The recommendation provided below provides a soil conditioning strategy if the owner wishes to pursue construction of concrete floor slabs.

If the owner chooses to construct the structure with concrete slab-on-grade floors, the floors should be supported by a layer of granular structural fill overlying the processed natural soils.

Interior concrete flatwork, or concrete slab-on-grade floors, should be underlain by scarification, moisture conditioning and compaction of about 6 inches of the natural soils followed by placement of at least 18 inches of compacted granular structural fill material that is placed and compacted as discussed in the Construction Considerations, “Fill Placement Recommendations” section of this report, below.

The above recommendations will not prevent slab heave if the expansive soils underlying slabs-on-grade become wet. However, the recommendations will reduce the effects if slab heave occurs.

All plumbing lines should be pressure tested before backfilling to help reduce the potential for wetting. The only means to completely mitigate the influence of volume changes on the performance of interior floors is to structurally support the floors over a void space. Floors that are suspended by the foundation system will not be influenced by volume changes in the site soils.

The suggestions and recommendations presented in this section are intended to help reduce the influence of swelling soils on the performance of the concrete slab-on-grade floors.

7.1.1 Capillary and Vapor Moisture Rise

Capillary and vapor moisture rise through the slab support soil may provide a source for moisture in the concrete slab-on-grade floor.