Exhibit H Tenant Improvements Cost Summary Table (Oct 2024).pdf

PDF 146 KB Posted

Attached to
Madisonville, KY VA clinic New/replacing Lease_Amendment 2
Solicitation number
36C25525R0036
Issued by

About this file

This document is a Tenant Improvements Cost Summary (TICS) template from the GSA, version October 2024. The form provides a comprehensive breakdown of potential construction and improvement costs across 33 Masterformat CSI System Elements, divided into two primary cost categories: Tenant Improvements (TI) and Shell costs. The template allows for detailed cost tracking across divisions including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood, Thermal Protection, Electrical, HVAC, Plumbing, Communications, and Utilities. While the current document contains placeholder values (all set to "-"), it is designed to capture total project costs, including subcontractor expenses, general contractor fees, architectural and engineering fees, and other lessor-related costs. The document notes that shell and core work items will include provisions for a "warm lit shell" and recommends contacting the Lease Contracting Officer (LCO) at karen.maggart@va.gov for a complete Exhibit H TICS Excel document.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version Oct. 2024

For: - ABOA SF= -

Agency: - TIA PER ABOA SF= -$

Location: - TOTAL TIA= -$

Common Area Factor: - RSF= - Masterformat

CSI System Elements TI* SHELL**

Div 1 General Requirements -$ -$ Div 2 Existing Conditions -$ -$ Div 3 Concrete -$ -$ Div 4 Masonry -$ -$ Div 5 Metals -$ -$ Div 6 Wood, Plastics, Composites -$ -$ Div 7 Thermal and Moisture Protection -$ -$ Div 8 Openings -$ -$ Div 9 Finishes -$ -$ Div 10 Specialties -$ -$ Div 11 Equipment -$ -$ Div 12 Furnishings -$ -$ Div 13 Special Construction -$ -$ Div 14 Conveying Equipment -$ -$ Div 21 Fire Suppression -$ -$ Div 22 Plumbing -$ -$ Div 23 Heating, Ventilating, and Air Conditioning (HVAC) -$ -$ Div 26.1 Electrical -$ -$ Div 26.2 Lighting -$ -$ Div 27 Communications -$ -$ Div 28.1 Electronic Safety -$ -$ Div 28.2 Electronic Security (TI - Non-BSAC) -$ -$ Div 31 Earthwork -$ -$ Div 32 Exterior Improvements -$ -$ Div 33 Utilities -$ -$

Subtotal -$ -$ General Contractor Fee Percent -$ -$

Subtotal Construction Costs -$ -$ Architectural & Engineering Fees (NIC DID costs) ** Percent -$ -$ Other Lessor Costs Established Under the Lease -$ -$

Subtotal Lessor's Costs: -$ -$ Lessor's Project Management Fee Percent -$

Total Price to Government: GRAND TOTAL -$ Cost per ABOA SF -$ -$

Cost per RSF -$ -$ Notes:

* Include all subcontractors' costs.

Trade Costs

Not subject to Lessor's project management fee.

Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information.

TENANT IMPROVEMENTS COST SUMMARY (TICS)

Reach out to LCO at karen.maggart@va.gov for a complete Exhibit H TICS Excel document.

TICS

File details come from the government source that posted it. Updated .