Exhibit H ITB _24_56.pdf
PDF 2 MB Posted
- Solicitation number
- PE-63100-NONST-2024-000000035
- Issued by
- Clayton County, Georgia
About this file
This document is an Asbestos Assessment report prepared by United Consulting for Clayton County, Georgia regarding a concession building located at 1303 Government Circle in Jonesboro, Georgia. The assessment was conducted to identify the presence and extent of asbestos-containing materials (ACM) within the building prior to the client's intended renovation or demolition of the structure.
The report states that United Consulting collected a total of 20 bulk samples of suspect ACM, and one sample was found to contain regulated concentrations of asbestos fibers, specifically in the sink soundproofing material. The assessment recommends that the identified ACM be removed by a qualified asbestos abatement contractor prior to any demolition or renovation activities, in accordance with applicable federal, state, and local regulations. Additionally, the building owner or demolition contractor must submit a Ten-Day Notification to the Georgia Department of Natural Resources - Environmental Protection Division prior to the start of any building demolition activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit F ITB _24_56.pdf | ||
| Exhibit I ITB _24_56.pdf | ||
| Exhibit A ITB _24_56.pdf | ||
| Exhibit G ITB _24_56.pdf | ||
| ITB _24_56.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
625 Holcomb Bridge Road, Norcross, GA 30071 • 770-209-0029 • unitedconsulting.com
REPORT
For Clayton County
Asbestos Assessment Rum Creek Park Concession Building 1303 Government Circle Clayton County, Georgia
Asbestos Assessment 1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
August 4, 2023
Clayton County 1303 Government Circle Jonesboro, Clayton County, Georgia 30236
Attn: Ms. Karyl Clayton
Via E-mail: karyl.clayton@claytoncountyga.gov
RE: Report of Asbestos Assessment Rum Creek Park Concessions Building 1303 Government Circle Jonesboro, Clayton County, Georgia Project No. CLAMB-23-GA-07616-01
Dear Ms. Clayton:
United Consulting has completed the Asbestos Sampling at the above referenced site located at 1303 Government Circle in Jonesboro, Georgia, hereinafter referred to as the Project Site. The testing activities were performed in substantial conformance with industry standards. We appreciate the opportunity to assist you with this project and look forward to assisting you with future projects. Please contact us if you have any questions or if we can be of further assistance.
Sincerely, UNITED CONSULTING
Michael G. Abernathy Timothy J. Beck, P.G.
Project Environmental Specialist Executive Vice President
KTE/MGA/TJB/rg
SP: CLAMB-23-GA-07616-01
mailto:karyl.clayton@claytoncountyga.gov
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY
Asbestos Conclusions and Regulatory Implications
2.0 CERTIFICATIONS
3.0 INTRODUCTION
3.1 Scope of Work
3.1.1 Modifications to Scope
3.1.2 Previous Investigations
4.0 DESCRIPTION OF FACILITIES
5.0 INACCESSIBLE AREAS/LIMITING CONDITIONS
6.0 ASBESTOS SURVEY
6.1 Overview
6.2 Survey Intent
6.3 Sample Location Selection
6.4 Procedure
6.5 Bulk Sample Analysis
6.6 Bulk Sample Findings
6.6.1 Survey Overview
6.6.2 Asbestos Data Evaluation
Identified Materials – 1303 Government Circle Regulatory Concerns
6.6.3 Estimated Quantities
7.0 CONCLUSIONS
8.0 REFERENCES and additional resources
9.0 LIMITATIONS
TABLES
Table 1 Summary of Asbestos Test Results
FIGURES
Figure 1 Sample Location Plan | 1303 Government Circle
APPENDICES
Appendix A Certifications Appendix B Laboratory Analytical Testing Results Appendix C Georgia Asbestos Project Notification Requirements
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
1.0 EXECUTIVE SUMMARY1
United Consulting has completed an Asbestos Assessment on the concession structure located at 1303 Government Circle in Jonesboro, Clayton County, Georgia (herein referred to in this report as the Project Site). The results are briefly summarized below. The text of the report should be reviewed for a discussion of the following items:
Asbestos
• United Consulting conducted an asbestos survey on the concession building structure located on the Project Site. A total of 20 bulk samples of suspect Asbestos Containing Materials (ACM) were collected from the Project Site.
• One (1) of the analyzed samples were found to contain regulated concentrations of asbestos fibers. The identified ACM was sink soundproofing.
Conclusions and Regulatory Implications
• This assessment has identified asbestos containing materials which will need to be abated prior to demolition and/or renovation.
• The National Emissions Standard for Hazardous Air Pollutants (NESHAP) requires friable, regulated asbestos containing material (RACM), be removed from the structure prior to activities which would disturb them. United Consulting recommends the identified ACM be removed from the Project Site structure prior to demolition or renovation by a qualified asbestos abatement contractor, using State of Georgia accredited personnel, in accordance with applicable federal, state, and local regulations governing the removal of asbestos-containing material.
• A Ten-Day Notification must be forwarded to the Georgia Department of Natural Resources - Environmental Protection Division, by the building owner or demolition/renovation contractor, prior to the start of any building demolition/renovation activities.
1 This Executive Summary is not intended to be used or relied upon without reference to the entire report and cannot otherwise be properly understood and interpreted. It is provided solely for the convenience of the Client and not as a substitute for the report or review of the report.
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
2.0 CERTIFICATIONS
The following assessment referenced by this report, and the report itself, was performed in substantial conformance with industry standards, with the noted limitations referenced herein. The persons listed below are licensed/certificated inspectors in accordance with their specific disciplines. These certifications and that of the laboratory used for this investigation are reproduced in Appendix B and C, respectively.
United Consulting reserves the right to review any submittal and/or documentation referencing United Consulting’s certification(s) prior to formal transmittal to relevant state and/or federal agencies.
UNITED CONSULTING
Taylor Etelman Asbestos Hazard Emergency Response Act (AHERA) Inspector Certification No. 5612 Expiration Date: 12/06/2023 Date of Inspection: 07/20/2023
Matthew Cowart Asbestos Hazard Emergency Response Act (AHERA) Inspector Certification No. 19491 Expiration Date: 7/25/2024 Date of Inspection: 07/20/2023
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
3.0 INTRODUCTION
United Consulting was retained by Clayton County to perform a limited assessment for Asbestos Containing Materials (ACM). The purpose of this survey was to collect and test representative samples of common building materials for the presence of asbestos fibers. It is our understanding that the client intends to renovate or demolish this structure.
3.1 Scope of Work
The scope of this survey was outlined in a Revised Proposal for Environmental Services, dated July 20.
2023. In performing this assessment, United Consulting conducted the following activities:
1. Visually examine the accessible areas of the structures to identify suspect asbestos containing materials (SACM) which could be impacted by possible renovation/demolition activities;
2. Physically examine suspect materials to evaluate whether the materials were friable or non-friable (a friable material is any material that, when dry, may be crumbled, pulverized, or reduced to a powder using hand pressure);
3. Describe the suspect material and note the areas where the material was located;
4. Conduct sampling of identified SACM and submit samples to an independent laboratory for analysis; of which up to 20 samples have been authorized with ten reserve samples as a contingency, if needed;
5. Conduct testing of representative paint films from within the Project Site structures utilizing an x-ray fluorescence (XRF) device, which eliminates the need for destructive paint chip sampling;
and,
6. Prepare this report of the sampling/testing activities and findings.
3.1.1 Modifications to Scope
• No modifications were made to the proposed scope of services.
3.1.2 Previous Investigations
United Consulting has not been provided with previously conducted asbestos investigations of the Project Site.
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
4.0 DESCRIPTION OF FACILITIES
The Project Site contained one building as described below:
1303 Government Circle The parcel located at 1303 Government Circle is improved to the limits of the property boundaries by a 900 square foot, vacant, two-story concession building. The exterior shell of the building was constructed with cementitious blocks. The roofing system was observed to be a low slope metal roofing system. The interior walls of the building were finished with a mixture of drywall system materials, cementitious blocks, and wood paneling. Portions of the subfloor had been covered with various finishes including ceramic tile and carpet flooring. Heating and air conditioning are provided to the building by dedicated split HVAC systems.
The below Exhibit shows the Project Site, associated building, and identification key.
Exhibit 1 – Building Key (Aerial Photograph)
It is our understanding that the client intends to renovate or demolish the structure and would like to understand the extent of potentially regulated materials on the site. The location of the Project Site is shown in Figure 1.
Survey Structure
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
5.0 INACCESSIBLE AREAS/LIMITING CONDITIONS
The structure on the Project Site was vacant during this assessment. Some destructive sampling techniques were employed throughout the structure.
If during renovation or demolition, additional suspect asbestos containing materials are encountered that were not sampled and tested during this survey, our office should be notified immediately to sample.
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
6.0 ASBESTOS SURVEY
6.1 Overview
Asbestos is the name given to a number of naturally occurring, fibrous silicate minerals mined for their useful properties such as thermal insulation, chemical and thermal stability, and high tensile strength.
These minerals and their associated refined fibers have been used throughout history to the present day in order to add strength and fire resistance to many common building materials. Asbestos fibers are acknowledged carcinogens and present a risk to human health for those that are exposed. Due to these recognized hazards, federal and state regulations govern the handling, use, and disposal of materials containing regulated concentrations of asbestos fibers.
6.2 Survey Intent
Pre-Demolition “Thorough Inspection”
This asbestos assessment has been performed with the understanding that the client wishes to demolish and/or renovate the Project Site structure. The survey consisted of both a destructive and visual survey of the Project Site structure(s) in order to identify suspect ACM. United Consulting collected bulk samples of suspect building materials for laboratory analysis of asbestos fiber content. Any limitations, if encountered, are described in Section 5.0 of this report. This survey is intended to satisfy the “Thorough Inspection” requirement of the Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP).
6.3 Sample Location Selection
Sample locations were randomly chosen in the field, based on the identification of suspect ACM. A distributed sampling plan based on a randomized sampling scheme was not used for this sampling program. Samples were collected from areas deemed safe and accessible.
Bulk samples were collected from typical suspect materials such as drywall, mastics, sink soundproofing, carpet flooring and mastics, and other suspect materials. Bulk samples were not collected of non-suspect materials such as drapes, wood, fiberglass insulation or ceramic tiles. The locations of the bulk samples collected during this survey are found in Figure 2.
6.4 Procedure
Samples were collected by preparing the material to be sampled, by extracting a representative section of the suspect material and by placing the material in a sample container. Each sample was assigned a unique sample number and delivered to an independent laboratory (Analytical Environmental Services, Inc.) for analysis. Chain-of-Custody was documented and retained on-file. The laboratory results are attached in Appendix C. The locations of the bulk samples collected during this survey are found in Figure 2.
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
6.5 Bulk Sample Analysis
The bulk samples were tested for detectable concentrations of asbestos (greater than one percent asbestos) initially utilizing Polarized Light Microscopy (PLM), followed by point counting, and/or Transmission Electron Microscopy (TEM) Chatfield techniques, as needed. Materials containing one percent or more asbestos are considered ACM and are regulated. Bulk sample testing by the above analytical methods were performed by Analytical Environmental Services, Inc., a successful participant in the National Voluntary Laboratory Accreditation Program (NVLAP), lab code 102082-0 (Expiration date September 30, 2023).
6.6 Bulk Sample Findings
6.6.1 Survey Overview
United Consulting collected a total of 20 bulk samples, during one sampling event, of suspect asbestos-containing materials (SACM) from the Project Site. These items included sink soundproofing, drywall system materials, mastics, carpet flooring, and wall paneling with mastic. The survey results discussed below have been compiled by material location. Photocopies of the Laboratory Results are included in Appendix A. Below in Exhibit 2 is a summary of asbestos containing materials (ACM) identified at the Project Site. A summary of the bulk sample results is presented in Table 1.
Exhibit 2 – Summary of Positive Asbestos Bulk Sample Results
Structure/ Area Identified RACM Location Sampling
Scope
1303 Government Circle Sink Soundproofing Kitchen on ground Floor
Preliminary/ Limited
Sampling Note:
RACM – Regulated Asbestos Containing Materials
6.6.2 Asbestos Data Evaluation
Of the 20 bulks samples of suspect ACM analyzed, one sample reported regulated concentrations of asbestos fibers.
Identified Materials – 1303 Government Circle
Sink Soundproofing The black sink soundproofing on the sink in the ground floor kitchen was found to contain regulated concentrations of asbestos.
The locations of collected samples at the building, including those with ACM, are illustrated on Figures 1 and 2.
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
Regulatory Concerns
United Consulting accessed readily accessible areas during the course of this assessment. Assessment limitations are outlined in Sections 5.0 and 6.2 above. In the event that additional suspect ACM are encountered at the time of renovation or demolition, United Consulting should be contacted, and samples of the suspect materials should be collected for analysis of asbestos fibers prior to continuing demolition activities which could disturb these materials and potentially result in an asbestos fiber release.
NESHAP requires the removal of friable ACM prior to activities, which would disturb them. Georgia asbestos regulation requires the removal of all ACM prior to demolition, unless the entire waste stream is to be managed as asbestos containing waste. United Consulting recommends that the ACM be removed, prior to renovation or demolition by a qualified asbestos abatement contractor, using State of Georgia accredited personnel, in accordance with applicable federal, state, and local regulations governing the removal of ACM. Since the only RACM encountered was the kitchen sink soundproofing and it is non-friable material and it is less than 10 square feet in size, state regulations provide that the owner can remove and dispose of it themselves, but a qualified asbestos abatement contractor can be used.
A Ten-Day Notification should be submitted to the Georgia Department of Natural Resources (DNR), Georgia Environmental Protection Division (EPD), by the building owner or demolition contractor prior to the start of any building demolition activities (https://epd.georgia.gov/forms-permits/land-protection-branch-forms-permits/asbestos-licensing-and-notifications). As the asbestos inspector on record, United Consulting requests to be contacted if certification information, provided herein, is utilized in a Ten-Day Notification.
A Georgia licensed Asbestos Removal Contractor should be employed to remove ACM, and appropriately contain, transport, and dispose of asbestos-containing waste materials. Friable material, in poor condition (such as pipe insulation), should be appropriately addressed in a timely manner, regardless of whether demolition or renovation is planned. United Consulting recommends identifying all known ACM to building/property maintenance personnel and developing a site-specific work practices.
6.6.3 Estimated Quantities
United Consulting has not been requested/contracted to provide estimated quantities of ACM.
Contractors are responsible for quantity calculations as part of scoping and bidding asbestos abatement work. Please note, that additional delineation sampling may be requested by abatement contractor(s) to finalize their scope and costs estimates.
https://epd.georgia.gov/forms-permits/land-protection-branch-forms-permits/asbestos-licensing-and-notifications https://epd.georgia.gov/forms-permits/land-protection-branch-forms-permits/asbestos-licensing-and-notifications
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
7.0 CONCLUSIONS
Based on the results of this survey, asbestos containing building material was identified at the Project Site. A qualified asbestos abatement contractor will be required to remove the identified asbestos containing materials prior to renovation/demolition work. Since the only RACM encountered was the kitchen sink soundproofing and it is non-friable material and it is less than 10 square feet in size, state regulations provide that the owner can remove and dispose of it themselves, but a qualified asbestos abatement contractor can be used.
The building owner or demolition contractor must forward a proper Ten-Day Notification to the Georgia EPD prior to the start of any building renovation/demolition activities. As the asbestos inspector on record, United Consulting requests to be contacted if certification information, provided herein, is utilized in a Ten-Day Notification. Information relative to the submittal process for the State of Georgia is included in Appendix D.
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
8.0 REFERENCES2 AND ADDITIONAL RESOURCES
ASTM 2356-18 Standard Practice for Comprehensive Building Asbestos Surveys
EPA Guidance for Controlling Asbestos-Containing Materials in Buildings. (1985).
EPA Guidance for Controlling Asbestos-Containing Materials in Buildings, EPA 560/5-85-024.
https://www.wbdg.org/FFC/EPA/EPACRIT/epa_560585024.pdf
EPA Interim Method for the Determination of Asbestos in Bulk Insulation Samples. (1982).
EPA Interim Method for the Determination of Asbestos in Bulk Insulation Samples, 40 CFR, Part 763, Appendix E to Subpart E(EPA 600/M4-82-020).
https://cfpub.epa.gov/si/si_public_record_Report.cfm?Lab=ORD&dirEntryID=43798
EPA Method for the Determination of Asbestos in Bulk Building Materials. (1993).
EPA Method for the Determination of Asbestos in Bulk Building Materials, EPA 600/R-93/116.
https://www.nist.gov/system/files/documents/nvlap/EPA-600-R-93-116.pdf
EPA National Emission Standards for Hazardous Air Pollutants (NESHAP, 40 CFR Part 61, Subpart M)
Environmental Protection Division. (2019, November 16). Asbestos.
https://epd.georgia.gov/about-us/land-protection-branch/asbestos
2 References provided herein are not intended to be all inclusive relative to the report and are provided for informational purposes only.
https://www.wbdg.org/FFC/EPA/EPACRIT/epa_560585024.pdf https://cfpub.epa.gov/si/si_public_record_Report.cfm?Lab=ORD&dirEntryID=43798 https://www.nist.gov/system/files/documents/nvlap/EPA-600-R-93-116.pdf https://epd.georgia.gov/about-us/land-protection-branch/asbestos
1303 Government Circle
Jonesboro, Clayton County, Georgia
CLAMB-23-GA-07616-01
9.0 LIMITATIONS
The conclusions presented in this Asbestos Survey are based on the laboratory results and condition of the materials identified. Asbestos concentrations will vary between sample locations. Our assessment of the materials at the Project Site is a professional opinion arrived at through the method and procedures accepted by and standard to the industry. No other warranty or guarantee is expressed or implied.
Representative areas of the Project Site were sampled on a limited basis. Preparation of abatement design bid documents or scopes of work for abatement, may require additional sampling and definition of the extent of the material. United Consulting shall not be held responsible for errors, miscalculations, assumptions, misinterpretations or other problems or liabilities arising from, or associated with, firms or individuals bidding on asbestos abatement work that rely solely, or in part, on this document.
This report has been prepared on behalf of the client. Should any other person, partnership, or corporation desire to rely upon this report, it will be necessary for United Consulting to update the report for the new user.
UNITED CONSULTING
TABLES
TABLE 1 - SUMMARY OF ASBESTOS TEST RESULTS
Sample No. Component Location Friability Asbestos (%)
Building A
A-1 Sink Soundproofing Kitchen Non-Friable 3% CH
A-2 Drywall Systems Component
Kitchen Friable ND
A-3 Drywall Systems Component
Kitchen Friable ND
A-4 Drywall Systems Component
Kitchen Friable ND
A-5 Drywall Systems Component
Kitchen Friable ND
A-6 Wall Paneling Women’s RR Friable ND
A-7 Wall Paneling Mastic Women’s RR Non- Friable ND
A-8 Drywall Systems Component Women’s RR Friable ND
A-9 Drywall Systems Component Women’s RR Friable ND
A-10 Wall Paneling Men’s RR Non-Friable ND
A-11 Wall Paneling Mastic Men’s RR Non-Friable ND
A-12 Drywall Systems Component Men’s RR Friable ND
A-13 Drywall Systems Component Men’s RR Friable ND
A-14 Drywall Systems Component 2nd Floor Friable ND
A-15 Drywall Systems Component 2nd Floor Friable ND
A-16 Drywall Systems Component 2nf Floor Friable ND
Sample No. Component Location Friability Asbestos (%)
A-17 Carpet and Carpet Mastic 2nd Floor Non-Friable ND
A-18 Drywall Systems Component
2nd Floor Friable ND
A-19 Drywall Systems Component
2nd Floor Friable ND
A-20 Drywall Systems Component 2nd Floor Friable ND
Notes:
ND=Non-detect for asbestos fibers CH=Chrysotile Asbestos Fibers Bolded entries contain regulated concentrations of asbestos fibers.
FIGURES
Prepared: TE Title: Sample Location Plan- Ground Floor
FIG 1 Checked: TB Project: Rum Creek Park
Date: 8/2/23 Project No. CLABM-23-GA-07616-01
Scale: Not to Scale Client: Clayton County
Prepared: TE Title: Sample Location Plan- 2nd Floor
FIG 2 Checked: TB Project: Rum Creek Park
Date: 8/2/23 Project No. CLABM-23-GA-07616-01
Scale: Not to Scale Client: Clayton County
APPENDIX A
Certifications3
3 Any notifications/permit applications to agencies that require certification information, provided herein, must be reviewed by United Consulting prior to formal submittal.
APPENDIX B
Laboratory Results and Chain of Custody
ANALYTICAL ENVIRONMENTAL SERVICES, INC.
27-Jul-23
Bulk Sample Summary Report
AES Job Number:
Project Number:Project Name:
Client Name:
LocationClient ID AES ID Asbestos Mineral Percentage Comments
2307M16
RUM CREEK PARK 07616-01
United Consulting Group Inc.
AMCH CR AN TR AC
3080 Presidential Drive
Atlanta,GA 30340
Tel :(770) 457-8177
Fax:(770) 457-8188 Report Date:
NDNDNDNDND3Kitchen- sink SP2307M16
-001A A-1
Layer:
NDNDNDNDNDNDKitchen- DW ceiling2307M16
-002A A-2
Layer:
NDNDNDNDNDNDKitchen- DW ceiling2307M16
-002A A-2
Layer:
NDNDNDNDNDNDKitchen- DW2307M16
-003A A-3
Layer:
NDNDNDNDNDNDKitchen- DW2307M16
-003A A-3
Layer:
Paint included as binderNDNDNDNDNDNDKitchen- DW tape2307M16
-004A A-4
Layer:
Note: CH=chrysotile, AM=amosite, CR=crocidolite, AC=actinolite, TR=tremolite, AN=anthophylite
ND = None Detected
For comments on the samples, see the individual analysis sheets.
AES,Inc. is accredited by NIST’s National Voluntary Laboratory Accreditation Program (NVLAP) for Polarized Light Microscopy (PLM) analysis, Lab
Code 102082-0. All analyses performed in accordance with EPA “Interim Method for the Determination of Asbestos in Bulk Insulation Samples” (EPA
600/M4-82-020), 1982 as found in 40 CFR, Part 763, Appendix E to Subpart E and “Method for the Determination of Asbestos in Bulk Building
Materials” (EPA/600/R-93/116), 1993.
These test results apply only to those samples actually tested, as submitted by the client. All percentages are reported by visually estimated volume.
PLM is not consistently reliable in detecting small concentrations of asbestos in floor tiles and similar nonfriable materials, quantitative TEM is currently the only method that can be used to determine conclusive asbestos content. Interpretation and use of test results are the client ’s responsibility.
Laboratory liability is limited to the cost of analysis. This report must not be used to claim, and does not imply product certification, approval, or endorsement by NVLAP or any agency of the Federal Government.
This report must not be reproduced except in full without written approval of Analytical Environmental Services , Inc
Microanalyst: QC Analyst:
Yelena KhaninaElena Ivanova
Bulk Sample Summary Report
AES Job Number:
Project Number:Project Name:
Client Name:
LocationClient ID AES ID Asbestos Mineral Percentage Comments
2307M16
RUM CREEK PARK 07616-01
United Consulting Group Inc.
AMCH CR AN TR AC
3080 Presidential Drive
Atlanta,GA 30340
Tel :(770) 457-8177
Fax:(770) 457-8188 Report Date:
NDNDNDNDNDNDKitchen- DW tape2307M16
-004A A-4
Layer:
Paint included as binderNDNDNDNDNDNDKitchen- DW seam2307M16
-005A A-5
Layer:
NDNDNDNDNDNDKitchen- DW seam2307M16
-005A A-5
Layer:
NDNDNDNDNDNDKitchen- DW seam2307M16
-005A A-5
Layer:
NDNDNDNDNDNDWomen's RR- wall paneling2307M16
-006A A-6
Layer:
NDNDNDNDNDNDWomen's RR- wall paneling2307M16
-006A A-6
Layer:
Note: CH=chrysotile, AM=amosite, CR=crocidolite, AC=actinolite, TR=tremolite, AN=anthophylite
ND = None Detected
For comments on the samples, see the individual analysis sheets.
AES,Inc. is accredited by NIST’s National Voluntary Laboratory Accreditation Program (NVLAP) for Polarized Light Microscopy (PLM) analysis, Lab
Code 102082-0. All analyses performed in accordance with EPA “Interim Method for the Determination of Asbestos in Bulk Insulation Samples” (EPA
600/M4-82-020), 1982 as found in 40 CFR, Part 763, Appendix E to Subpart E and “Method for the Determination of Asbestos in Bulk Building
Materials” (EPA/600/R-93/116), 1993.
These test results apply only to those samples actually tested, as submitted by the client. All percentages are reported by visually estimated volume.
PLM is not consistently reliable in detecting small concentrations of asbestos in floor tiles and similar nonfriable materials, quantitative TEM is currently the only method that can be used to determine conclusive asbestos content. Interpretation and use of test results are the client ’s responsibility.
Laboratory liability is limited to the cost of analysis. This report must not be used to claim, and does not imply product certification, approval, or endorsement by NVLAP or any agency of the Federal Government.
This report must not be reproduced except in full without written approval of Analytical Environmental Services , Inc
Microanalyst: QC Analyst:
Bulk Sample Summary Report
AES Job Number:
Project Number:Project Name:
Client Name:
LocationClient ID AES ID Asbestos Mineral Percentage Comments
2307M16
RUM CREEK PARK 07616-01
United Consulting Group Inc.
AMCH CR AN TR AC
3080 Presidential Drive
Atlanta,GA 30340
Tel :(770) 457-8177
Fax:(770) 457-8188 Report Date:
NDNDNDNDNDNDWomen's RR- paneling mastic
2307M16
-007A A-7
Layer:
NDNDNDNDNDNDWomen's RR- paneling mastic
2307M16
-007A A-7
Layer:
Drywall tape. Paint included as binder
NDNDNDNDNDNDWomen's RR- DWSC2307M16
-008A A-8
Layer:
WallboardNDNDNDNDNDNDWomen's RR- DWSC2307M16
-008A A-8
Layer:
Paint included as binderNDNDNDNDNDNDWomen's RR- DW seam2307M16
-009A A-9
Layer:
NDNDNDNDNDNDWomen's RR- DW seam2307M16
-009A A-9
Layer:
Note: CH=chrysotile, AM=amosite, CR=crocidolite, AC=actinolite, TR=tremolite, AN=anthophylite
ND = None Detected
For comments on the samples, see the individual analysis sheets.
AES,Inc. is accredited by NIST’s National Voluntary Laboratory Accreditation Program (NVLAP) for Polarized Light Microscopy (PLM) analysis, Lab
Code 102082-0. All analyses performed in accordance with EPA “Interim Method for the Determination of Asbestos in Bulk Insulation Samples” (EPA
600/M4-82-020), 1982 as found in 40 CFR, Part 763, Appendix E to Subpart E and “Method for the Determination of Asbestos in Bulk Building
Materials” (EPA/600/R-93/116), 1993.
These test results apply only to those samples actually tested, as submitted by the client. All percentages are reported by visually estimated volume.
PLM is not consistently reliable in detecting small concentrations of asbestos in floor tiles and similar nonfriable materials, quantitative TEM is currently the only method that can be used to determine conclusive asbestos content. Interpretation and use of test results are the client ’s responsibility.
Laboratory liability is limited to the cost of analysis. This report must not be used to claim, and does not imply product certification, approval, or endorsement by NVLAP or any agency of the Federal Government.
This report must not be reproduced except in full without written approval of Analytical Environmental Services , Inc
Microanalyst: QC Analyst:
Bulk Sample Summary Report
AES Job Number:
Project Number:Project Name:
Client Name:
LocationClient ID AES ID Asbestos Mineral Percentage Comments
2307M16
RUM CREEK PARK 07616-01
United Consulting Group Inc.
AMCH CR AN TR AC
3080 Presidential Drive
Atlanta,GA 30340
Tel :(770) 457-8177
Fax:(770) 457-8188 Report Date:
NDNDNDNDNDNDWomen's RR- DW seam2307M16
-009A A-9
Layer:
NDNDNDNDNDNDMen's RR- wall paneling2307M16
-010A A-10
Layer:
NDNDNDNDNDNDMen's RR- wall paneling2307M16
-010A A-10
Layer:
NDNDNDNDNDNDMen's RR- paneling mastic2307M16
-011A A-11
Layer:
Paint included as binderNDNDNDNDNDNDMen's RR- DW2307M16
-012A A-12
Layer:
NDNDNDNDNDNDMen's RR- DW2307M16
-012A A-12
Layer:
Note: CH=chrysotile, AM=amosite, CR=crocidolite, AC=actinolite, TR=tremolite, AN=anthophylite
ND = None Detected
For comments on the samples, see the individual analysis sheets.
AES,Inc. is accredited by NIST’s National Voluntary Laboratory Accreditation Program (NVLAP) for Polarized Light Microscopy (PLM) analysis, Lab
Code 102082-0. All analyses performed in accordance with EPA “Interim Method for the Determination of Asbestos in Bulk Insulation Samples” (EPA
600/M4-82-020), 1982 as found in 40 CFR, Part 763, Appendix E to Subpart E and “Method for the Determination of Asbestos in Bulk Building
Materials” (EPA/600/R-93/116), 1993.
These test results apply only to those samples actually tested, as submitted by the client. All percentages are reported by visually estimated volume.
PLM is not consistently reliable in detecting small concentrations of asbestos in floor tiles and similar nonfriable materials, quantitative TEM is currently the only method that can be used to determine conclusive asbestos content. Interpretation and use of test results are the client ’s responsibility.
Laboratory liability is limited to the cost of analysis. This report must not be used to claim, and does not imply product certification, approval, or endorsement by NVLAP or any agency of the Federal Government.
This report must not be reproduced except in full without written approval of Analytical Environmental Services , Inc
Microanalyst: QC Analyst:
Bulk Sample Summary Report
AES Job Number:
Project Number:Project Name:
Client Name:
LocationClient ID AES ID Asbestos Mineral Percentage Comments
2307M16
RUM CREEK PARK 07616-01
United Consulting Group Inc.
AMCH CR AN TR AC
3080 Presidential Drive
Atlanta,GA 30340
Tel :(770) 457-8177
Fax:(770) 457-8188 Report Date:
NDNDNDNDNDNDMen's RR- DW2307M16
-012A A-12
Layer:
Paint included as binderNDNDNDNDNDNDMen's RR- DW ceiling2307M16
-013A A-13
Layer:
NDNDNDNDNDND2nd floor- DW2307M16
-014A A-14
Layer:
NDNDNDNDNDND2nd floor- DW2307M16
-014A A-14
Layer:
Joint compound. Paint included as binder
NDNDNDNDNDND2nd floor- tape & JC ceiling2307M16
-015A A-15
Layer:
NDNDNDNDNDND2nd floor- tape & JC ceiling2307M16
-015A A-15
Layer:
Note: CH=chrysotile, AM=amosite, CR=crocidolite, AC=actinolite, TR=tremolite, AN=anthophylite
ND = None Detected
For comments on the samples, see the individual analysis sheets.
AES,Inc. is accredited by NIST’s National Voluntary Laboratory Accreditation Program (NVLAP) for Polarized Light Microscopy (PLM) analysis, Lab
Code 102082-0. All analyses performed in accordance with EPA “Interim Method for the Determination of Asbestos in Bulk Insulation Samples” (EPA
600/M4-82-020), 1982 as found in 40 CFR, Part 763, Appendix E to Subpart E and “Method for the Determination of Asbestos in Bulk Building
Materials” (EPA/600/R-93/116), 1993.
These test results apply only to those samples actually tested, as submitted by the client. All percentages are reported by visually estimated volume.
PLM is not consistently reliable in detecting small concentrations of asbestos in floor tiles and similar nonfriable materials, quantitative TEM is currently the only method that can be used to determine conclusive asbestos content. Interpretation and use of test results are the client ’s responsibility.
Laboratory liability is limited to the cost of analysis. This report must not be used to claim, and does not imply product certification, approval, or endorsement by NVLAP or any agency of the Federal Government.
This report must not be reproduced except in full without written approval of Analytical Environmental Services , Inc
Microanalyst: QC Analyst:
Bulk Sample Summary Report
AES Job Number:
Project Number:Project Name:
Client Name:
LocationClient ID AES ID Asbestos Mineral Percentage Comments
2307M16
RUM CREEK PARK 07616-01
United Consulting Group Inc.
AMCH CR AN TR AC
3080 Presidential Drive
Atlanta,GA 30340
Tel :(770) 457-8177
Fax:(770) 457-8188 Report Date:
Paint included as binderNDNDNDNDNDND2nd floor- DW & wallpaper2307M16
-016A A-16
Layer:
Paint included as binderNDNDNDNDNDND2nd floor- DW & wallpaper2307M16
-016A A-16
Layer:
NDNDNDNDNDND2nd floor- DW & wallpaper2307M16
-016A A-16
Layer:
NDNDNDNDNDND2nd floor- carpet mastic2307M16
-017A A-17
Layer:
Drywall tape. Paint included as binder
NDNDNDNDNDND2nd floor- DWSC2307M16
-018A A-18
Layer:
WallboardNDNDNDNDNDND2nd floor- DWSC2307M16
-018A A-18
Layer:
Note: CH=chrysotile, AM=amosite, CR=crocidolite, AC=actinolite, TR=tremolite, AN=anthophylite
ND = None Detected
For comments on the samples, see the individual analysis sheets.
AES,Inc. is accredited by NIST’s National Voluntary Laboratory Accreditation Program (NVLAP) for Polarized Light Microscopy (PLM) analysis, Lab
Code 102082-0. All analyses performed in accordance with EPA “Interim Method for the Determination of Asbestos in Bulk Insulation Samples” (EPA
600/M4-82-020), 1982 as found in 40 CFR, Part 763, Appendix E to Subpart E and “Method for the Determination of Asbestos in Bulk Building
Materials” (EPA/600/R-93/116), 1993.
These test results apply only to those samples actually tested, as submitted by the client. All percentages are reported by visually estimated volume.
PLM is not consistently reliable in detecting small concentrations of asbestos in floor tiles and similar nonfriable materials, quantitative TEM is currently the only method that can be used to determine conclusive asbestos content. Interpretation and use of test results are the client ’s responsibility.
Laboratory liability is limited to the cost of analysis. This report must not be used to claim, and does not imply product certification, approval, or endorsement by NVLAP or any agency of the Federal Government.
This report must not be reproduced except in full without written approval of Analytical Environmental Services , Inc
Microanalyst: QC Analyst:
Bulk Sample Summary Report
AES Job Number:
Project Number:Project Name:
Client Name:
LocationClient ID AES ID Asbestos Mineral Percentage Comments
2307M16
RUM CREEK PARK 07616-01
United Consulting Group Inc.
AMCH CR AN TR AC
3080 Presidential Drive
Atlanta,GA 30340
Tel :(770) 457-8177
Fax:(770) 457-8188 Report Date:
Joint compound. Paint included as binder
NDNDNDNDNDND2nd floor- DW tape & JC ceiling
2307M16
-019A A-19
Layer:
NDNDNDNDNDND2nd floor- DW tape & JC ceiling
2307M16
-019A A-19
Layer:
NDNDNDNDNDND2nd floor- DW tape & JC ceiling
2307M16
-019A A-19
Layer:
Paint included as binderNDNDNDNDNDND2nd floor- DW2307M16
-020A A-20
Layer:
NDNDNDNDNDND2nd floor- DW2307M16
-020A A-20
Layer:
Note: CH=chrysotile, AM=amosite, CR=crocidolite, AC=actinolite, TR=tremolite, AN=anthophylite
ND = None Detected
For comments on the samples, see the individual analysis sheets.
AES,Inc. is accredited by NIST’s National Voluntary Laboratory Accreditation Program (NVLAP) for Polarized Light Microscopy (PLM) analysis, Lab
Code 102082-0. All analyses performed in accordance with EPA “Interim Method for the Determination of Asbestos in Bulk Insulation Samples” (EPA
600/M4-82-020), 1982 as found in 40 CFR, Part 763, Appendix E to Subpart E and “Method for the Determination of Asbestos in Bulk Building
Materials” (EPA/600/R-93/116), 1993.
These test results apply only to those samples actually tested, as submitted by the client. All percentages are reported by visually estimated volume.
PLM is not consistently reliable in detecting small concentrations of asbestos in floor tiles and similar nonfriable materials, quantitative TEM is currently the only method that can be used to determine conclusive asbestos content. Interpretation and use of test results are the client ’s responsibility.
Laboratory liability is limited to the cost of analysis. This report must not be used to claim, and does not imply product certification, approval, or endorsement by NVLAP or any agency of the Federal Government.
This report must not be reproduced except in full without written approval of Analytical Environmental Services , Inc
Microanalyst: QC Analyst:
End of Report
APPENDIX C
Georgia Asbestos Project Notification Fact Sheet
Georgia Asbestos Project Notifications – Just the Basic Facts
Abatement, Encapsulation, Renovation, Blanket and Completion Notifications Renovation/Abatement Only*: Where the project only involves the removal and disposal of ACM. “Renovation” means the altering of, taking out, stripping, clean up, disposal of, or removal of 10 square feet or 10 linear feet or more of friable or potentially friable ACM from any facility, facility component or residential dwelling.
Renovation/Abatement Prior to Demolition*: Removal/abatement of friable ACM equal to or greater than 10 square feet or 10 linear feet in preparation for demolition activities to be performed after abatement. Notification for demolition projects must be submitted by the contractor performing those activities. If demolition activities are performed after renovation/abatement activities, please submit a separate PROJECT NOTIFICATION FOR DEMOLITION PROJECTS.
Encapsulation*: A project in which special coatings approved for asbestos encapsulation will be used to cover the ACM and prevent release of asbestos fibers. “Encapsulation” means the process of coating, binding, or resurfacing walls, ceilings, pipes, or other structures with a sealant to prevent friable asbestos from becoming airborne.
Blanket: Solely for use on single large facilities where multiple small abatement projects (less than 160 square feet, 260 linear feet, or 35 cubic feet of friable ACM) are to be conducted, but where the total amount of abatement work will exceed these parameters. Effective for one calendar year (January through December). A separate 10-day project notification and fee must be submitted when any single project exceeds the parameters.
Completion: To be submitted once the removal/abatement or encapsulation work is complete.
* SUBMIT NOTIFICATION 10 WORKING DAYS BEFORE START OF PROJECT
Residential fee: $0.10 per LF/SF ($25 min - $50 max) Non-Residential fee: $0.10 per LF/SF ($25 min - $1000 max)
Disclaimer: If you or your firm perform renovation or repair work, including ASBESTOS ABATEMENT, on target housing (built before 1978) OR child-occupied facilities (built before 1978), then you and your firm are required to become a GA-
Certified RRP Firm & Renovator to “advertise to, agree to or perform” work or services on these types of facilities. See Georgia's Lead Renovation, Repair and Painting (RRP) Rule for more detail.
Demolition Notifications Demolition Only*: Where the project only entails demolition of any structure that has been thoroughly inspected for the presence or absence of asbestos. "Demolition" means the wrecking or taking out of any load supporting structural member of a facility together with related handling operations, or the intentional burning of any structure.
A demolition notification is required regardless of the presence or absence of ACM. For joint Renovation/ Demolition Projects or Renovation/Abatement Prior To Demolition Projects, please submit the demolition notification AND a separate project notification for the asbestos abatement, encapsulation, and/or renovation.
Ordered Demolition: A demolition project ordered by a government agency. If the property has been condemned, the Order of Condemnation must be included with the project notification.
* SUBMIT NOTIFICATION 10 WORKING DAYS BEFORE START OF PROJECT
Courtesy Notifications Courtesy: Where the project involves removal/abatement, disturbance or encapsulation of non-friable ACM, less than 10 square feet or 10 linear feet of friable ACM or any quantity of ACM work being performed by the legal owner of the property. If demolition activities are performed after abatement/removal activities, please submit a separate
PROJECT NOTIFICATION FOR DEMOLITION PROJECTS.
Inspections and Disposal Information
Do I Need an Inspection? For demolition, yes. For renovation/abatement, yes, unless the suspect material is assumed to be asbestos-containing material (ACM) and is handled as such. You cannot assume any suspect material to be non-asbestos-containing. Inspections need to occur in buildings of any construction age.
Removal: Any ACM found that is friable or will become friable must first be removed by a Licensed Asbestos Abatement Contractor. A Project Notification must be submitted to the GA EPD if 10 square feet or 10 linear feet or more of ACM is removed.
Disposal: All ACM (friable and non-friable) waste must be packaged properly in leak-tight containers, labeled, transported in an enclosed vehicle and disposed of in a landfill permitted to accept ACM waste. Disposal rules apply at any quantity.
How to Submit Notifications:
You must create a Georgia EPD Online System (GEOS) account:
https://geos.epd.georgia.gov/ga/geos/public.
Need Help Creating Your GEOS Account?
For a step-by-step guideline, visit:
https://epd.georgia.gov/asbestos.
Contact Us: Duty officer line 404-363-7026 available Mon-Fri 8:00am - 4:30pm or https://epd.georgia.gov/asbestos. Feb-19
No Fee
No Fee https://geos.epd.georgia.gov/ga/geos/public
| COVER PAGE |
| COVER LETTER |
| TABLE OF CONTENTS |
| 1.0 EXECUTIVE SUMMARY |
| 2.0 CERTIFICATIONS |
| 3.0 INTRODUCTION |
| 4.0 DESCRIPTION OF FACILITIES |
| 5.0 INACESSIBLE AREAS/LIMITING CONDITIONS |
| 6.0 ASBESTOS SURVEY |
| 7.0 CONCLUSIONS |
| 8.0 REFERENCES AND ADDITIONL RESOURCES |
| 9.0 LIMITATIONS |
| TABLES |
| FIGURES |
| APPENDIX A - Certifications |
| APPENDIX B - Laboratory Results and Chain of Custody |
| APPENDIX C - Georgia Asbestos Project Notification Fact Sheet |
File details come from the government source that posted it. Updated .