This document is an Invitation to Bid (ITB) issued by Clayton County, Georgia for the Demolition and Construction of Concession and Restroom Buildings. The project involves the demolition and installation of these facilities. Qualified General Contractors are invited to submit bids for this project. The bid submissions should include a detailed Scope of Services. Bidders must comply with all requirements outlined in the ITB. The contract term is not specified, and renewal options are not mentioned.

The pricing terms, set asides, incumbents, funding requirements and sources are not provided in the document. The only salient information given is that the project is for Clayton County, Georgia and that qualified General Contractors are eligible to submit bids for the demolition and construction work.

View the file

Other files

File Type Posted
Exhibit I ITB _24_56.pdf PDF
Exhibit A ITB _24_56.pdf PDF
Exhibit H ITB _24_56.pdf PDF
Exhibit G ITB _24_56.pdf PDF
ITB _24_56.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

625 Holcomb Bridge Road, Norcross, GA 30071 • 770-209-0029 • unitedconsulting.com

REPORT

For Clayton County

Asbestos Assessment Morrow/ Lake City Park Concession Building 5555 N. Lake Drive Lake City, Clayton County, Georgi

Asbestos Assessment 5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

August 4, 2023

Clayton County 1376 Government Circle Jonesboro, Clayton County, Georgia 30236

Attn: Ms. Karyl Clayton

Via E-mail: karyl.clayton@claytoncountyga.gov

RE: Report of Asbestos Assessment Morrow/Lake City Park Concession Building 5555 N. Lake Drive Lake City, Clayton County, Georgia Project No. CLAMB-23-GA-07614-01

Dear Ms. Clayton:

United Consulting has completed the Limited Asbestos Sampling at the above referenced site located at 5555 N. Lake Drive, Lake City, Georgia, hereinafter referred to as the Project Site. The testing activities were performed in substantial conformance with industry standards. We appreciate the opportunity to assist you with this project and look forward to assisting you with future projects. Please contact us if you have any questions or if we can be of further assistance.

Sincerely, UNITED CONSULTING

Michael G. Abernathy Timothy J. Beck, P.G.

Project Environmental Specialist Executive Vice President

KTE/MGA/TJB/rg

SP: CLAMB-23-GA-07614-01

mailto:karyl.clayton@claytoncountyga.gov

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

TABLE OF CONTENTS

1.0 EXECUTIVE SUMMARY

Asbestos Conclusions and Regulatory Implications

2.0 CERTIFICATIONS

3.0 INTRODUCTION

3.1 Scope of Work

3.1.1 Modifications to Scope

3.1.2 Previous Investigations

4.0 DESCRIPTION OF FACILITIES

5.0 INACCESSIBLE AREAS/LIMITING CONDITIONS

6.0 ASBESTOS SURVEY

6.1 Overview

6.2 Survey Intent

6.3 Sample Location Selection

6.4 Procedure

6.5 Bulk Sample Analysis

6.6 Bulk Sample Findings

6.6.1 Survey Overview

6.6.2 Asbestos Data Evaluation

Regulatory Concerns

6.6.3 Estimated Quantities

7.0 CONCLUSIONS

8.0 REFERENCES and additional resources

9.0 LIMITATIONS

TABLES

Table 1 Summary of Asbestos Test Results

FIGURES

Figure 1 Sample Location Plan | 5555 N. Lake Drive

APPENDICES

Appendix A Certifications Appendix B Laboratory Analytical Testing Results Appendix C Georgia Asbestos Project Notification Requirements

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

1.0 EXECUTIVE SUMMARY1

United Consulting has completed a Limited Asbestos Assessment on the structures located at 5555 N.

Lake Drive, Lake City, Clayton County, Georgia (herein referred to in this report as the Project Site). The results are briefly summarized below. The text of the report should be reviewed for a discussion of the following items:

Asbestos

• United Consulting conducted an asbestos survey on the structures located on the Project Site. A total of six bulk samples of suspect Asbestos Containing Materials (ACM) were collected from the Project Site.

• None of the analyzed samples were found to contain regulated concentrations of asbestos fibers.

Conclusions and Regulatory Implications

• This assessment has identified no asbestos containing materials which will need to be abated prior to demolition and/or renovation.

• The National Emissions Standard for Hazardous Air Pollutants (NESHAP) requires friable, regulated asbestos containing material (RACM), be removed from the structure prior to activities which would disturb them. Should any be identified at a later date, United Consulting recommends ACM be removed from the Project Site structure prior to demolition or renovation by a qualified asbestos abatement contractor, using State of Georgia accredited personnel, in accordance with applicable federal, state and local regulations governing the removal of asbestos-containing material.

• A Ten-Day Notification must be forwarded to the Georgia Department of Natural Resources - Environmental Protection Division, by the building owner or demolition/renovation contractor, prior to the start of any building demolition/renovation activities.

1 This Executive Summary is not intended to be used or relied upon without reference to the entire report and cannot otherwise be properly understood and interpreted. It is provided solely for the convenience of the Client and not as a substitute for the report or review of the report.

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

2.0 CERTIFICATIONS

The following assessment referenced by this report, and the report itself, was performed in substantial conformance with industry standards, with the noted limitations referenced herein. The persons listed below are licensed/certificated inspectors in accordance with their specific disciplines. These certifications and that of the laboratory used for this investigation are reproduced in Appendix B and C, respectively.

United Consulting reserves the right to review any submittal and/or documentation referencing United Consulting’s certification(s) prior to formal transmittal to relevant state and/or federal agencies.

UNITED CONSULTING

Taylor Etelman Asbestos Hazard Emergency Response Act (AHERA) Inspector Certification No. 5612 Expiration Date: 12/06/2023 Date of Inspection: 07/20/2023

Matthew Cowart Asbestos Hazard Emergency Response Act (AHERA) Inspector Certification No. 19491 Expiration Date: 7/25/2024 Date of Inspection: 07/20/2023

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

3.0 INTRODUCTION

United Consulting was retained by Clayton County to perform a limited assessment for Asbestos Containing Materials (ACM). The purpose of this survey was to collect and test representative samples of common building materials for the presence of asbestos fibers. It is our understanding that the client intends to renovate or demolish this structure.

3.1 Scope of Work

The scope of this survey was outlined in a Revised Proposal for Environmental Services, dated July 20.

2023. In performing this assessment, United Consulting conducted the following activities:

1. Visually examined the accessible areas of the structures to identify suspect asbestos containing materials (SACM) which could be impacted by possible renovation/demolition activities;

2. Physically examined suspect materials to evaluate whether the materials were friable or non-friable (a friable material is any material that, when dry, may be crumbled, pulverized or reduced to a powder using hand pressure);

3. Described the suspect material and note the areas where the material was located;

4. Conducted sampling of identified SACM and submit samples to an independent laboratory for analysis; of which up to 20 samples have been authorized with ten reserve samples as a contingency, if needed;

5. Prepare this report of the sampling/testing activities and findings.

3.1.1 Modifications to Scope

• No modifications were made to the proposed scope of services.

3.1.2 Previous Investigations

United Consulting has not been provided with previously conducted asbestos investigations of the Project Site.

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

4.0 DESCRIPTION OF FACILITIES

The Project Site contained one building as described below:

5555 N. Lake Drive The parcel located at 5555 N. Lake Drive is improved to the limits of the property boundaries by a 900 square foot, vacant, single-story concession building. The exterior shell of the building was constructed with Concrete blocks. The roofing system was observed to be a low slope metal roofing system. The interior walls of the building were unfinished. Flooring materials included ceramic tile and concrete.

Heating and air conditioning are provided to the building by dedicated split HVAC systems.

The below Exhibit shows the Project Site, associated building, and identification key.

Exhibit 1 – Building Key (Aerial Photograph)

It is our understanding that the client intends to renovate or demolish the structure and would like to understand the extent of potentially regulated materials on the site. The location of the Project Site is shown in Figure 1.

Survey Structure

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

5.0 INACCESSIBLE AREAS/LIMITING CONDITIONS

The structure on the Project Site was vacant during this assessment. Some destructive sampling techniques were employed throughout the structure. United Consulting sampled within representative areas including within some wall cavities. Asbestos containing materials can vary between locations.

If during demolition, additional suspect asbestos containing materials are encountered that were not sampled and tested during this survey, our office should be notified immediately to sample.

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

6.0 ASBESTOS SURVEY

6.1 Overview

Asbestos is the name given to a number of naturally occurring, fibrous silicate minerals mined for their useful properties such as thermal insulation, chemical and thermal stability, and high tensile strength.

These minerals and their associated refined fibers have been used throughout history to the present day in order to add strength and fire resistance to many common building materials. Asbestos fibers are acknowledged carcinogens and present a risk to human health for those that are exposed. Due to these recognized hazards, federal and state regulations govern the handling, use, and disposal of materials containing regulated concentrations of asbestos fibers.

6.2 Survey Intent

Pre-Demolition “Thorough Inspection”

This asbestos assessment has been performed with the understanding that the client wishes to demolish and/or renovate the Project Site structure. The survey consisted of both a destructive and visual survey of the Project Site structure(s) in order to identify suspect ACM. United Consulting collected bulk samples of suspect building materials for laboratory analysis of asbestos fiber content. Any limitations, if encountered, are described in Section 5.0 of this report. This survey is intended to satisfy the “Thorough Inspection” requirement of the Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP).

6.3 Sample Location Selection

Sample locations were randomly chosen in the field, based on the identification of suspect ACM. A distributed sampling plan based on a randomized sampling scheme was not used for this sampling program. Samples were collected from areas deemed safe and accessible.

Bulk samples were collected from typical suspect materials such as drywall, mastics, sink soundproofing, carpet flooring and mastics, and other suspect materials. Bulk samples were not collected of non-suspect materials such as drapes, wood, fiberglass insulation or ceramic tiles. The locations of the bulk samples collected during this survey are found in Figure 2.

6.4 Procedure

Samples were collected by preparing the material to be sampled, by extracting a representative section of the suspect material and by placing the material in a sample container. Each sample was assigned a unique sample number and delivered to an independent laboratory (Analytical Environmental Services, Inc.) for analysis. Chain-of-Custody was documented and retained on-file. The laboratory results are attached in Appendix C. The locations of the bulk samples collected during this survey are found in Figure 2.

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

6.5 Bulk Sample Analysis

The bulk samples were tested for detectable concentrations of asbestos (greater than one percent asbestos) initially utilizing Polarized Light Microscopy (PLM), followed by point counting, and/or Transmission Electron Microscopy (TEM) Chatfield techniques, as needed. Materials containing one percent or more asbestos are considered ACM and are regulated. Bulk sample testing by the above analytical methods were performed by Analytical Environmental Services, Inc., a successful participant in the National Voluntary Laboratory Accreditation Program (NVLAP), lab code 102082-0 (Expiration date September 30, 2023).

6.6 Bulk Sample Findings

6.6.1 Survey Overview

United Consulting collected a total of six bulk samples, during one sampling event, of suspect asbestos-containing materials (SACM) from the Project Site. These items included ceiling tiles, mastics, and roofing materials. Photocopies of the Laboratory Results are included in Appendix A. A summary of the bulk sample results is presented in Table 1.

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

6.6.2 Asbestos Data Evaluation

Of the six bulk samples of suspect ACM analyzed, regulated concentrations of asbestos fibers were not identified.

The locations of collected samples at the building are illustrated on Figure 1.

Regulatory Concerns

United Consulting accessed readily accessible areas during the course of this assessment. Assessment limitations are outlined in Sections 5.0 and 6.2 above. In the event that additional suspect ACM are encountered at the time of demolition, United Consulting should be contacted, and samples of the suspect materials should be collected for analysis of asbestos fibers prior to continuing demolition activities which could disturb these materials and potentially result in an asbestos fiber release.

NESHAP requires the removal of friable ACM prior to activities, which would disturb them. Georgia asbestos regulation requires the removal of all ACM prior to demolition, unless the entire waste stream is to be handled as asbestos containing waste. United Consulting recommends that the ACM be removed, should any be identified, prior to demolition by a qualified asbestos abatement contractor, using State of Georgia accredited personnel, in accordance with applicable federal, state, and local regulations governing the removal of ACM. Since no RACM were encountered, state regulations provide that the owner can remove and dispose of materials themselves, without the use of a qualified asbestos abatement contractor.

A Ten-Day Notification should be submitted to the Georgia Department of Natural Resources (DNR), Georgia Environmental Protection Division (EPD), by the building owner or demolition contractor prior to the start of any building demolition activities (https://epd.georgia.gov/forms-permits/land-protection-branch-forms-permits/asbestos-licensing-and-notifications). As the asbestos inspector on record, United Consulting requests to be contacted if certification information, provided herein, is utilized in a Ten-Day Notification.

A Georgia licensed Asbestos Removal Contractor should be employed to remove ACM, and appropriately contain, transport, and dispose of asbestos-containing waste materials. Friable material, in poor condition (such as pipe insulation), should be appropriately addressed in a timely manner, regardless of whether demolition or renovation is planned. United Consulting recommends identifying all known ACM to building/property maintenance personnel and developing a site-specific work practices.

6.6.3 Estimated Quantities

United Consulting has not been requested/contracted to provide estimated quantities of ACM.

Contractors are responsible for quantity calculations as part of scoping and bidding asbestos abatement work. Please note, that additional delineation sampling may be requested by abatement contractor(s) to finalize their scope and costs estimates.

https://epd.georgia.gov/forms-permits/land-protection-branch-forms-permits/asbestos-licensing-and-notifications https://epd.georgia.gov/forms-permits/land-protection-branch-forms-permits/asbestos-licensing-and-notifications

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

7.0 CONCLUSIONS

Based on the results of this survey, asbestos containing building materials were not identified at the Project Site.

The building owner or demolition contractor must forward a proper Ten-Day Notification to the Georgia EPD prior to the start of any building renovation/demolition activities. As the asbestos inspector on record, United Consulting requests to be contacted if certification information, provided herein, is utilized in a Ten-Day Notification. Information relative to the submittal process for the State of Georgia is included in Appendix D.

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

8.0 REFERENCES2 AND ADDITIONAL RESOURCES

ASTM 2356-18 Standard Practice for Comprehensive Building Asbestos Surveys

EPA Guidance for Controlling Asbestos-Containing Materials in Buildings. (1985).

EPA Guidance for Controlling Asbestos-Containing Materials in Buildings, EPA 560/5-85-024.

https://www.wbdg.org/FFC/EPA/EPACRIT/epa_560585024.pdf

EPA Interim Method for the Determination of Asbestos in Bulk Insulation Samples. (1982).

EPA Interim Method for the Determination of Asbestos in Bulk Insulation Samples, 40 CFR, Part 763, Appendix E to Subpart E(EPA 600/M4-82-020).

https://cfpub.epa.gov/si/si_public_record_Report.cfm?Lab=ORD&dirEntryID=43798

EPA Method for the Determination of Asbestos in Bulk Building Materials. (1993).

EPA Method for the Determination of Asbestos in Bulk Building Materials, EPA 600/R-93/116.

https://www.nist.gov/system/files/documents/nvlap/EPA-600-R-93-116.pdf

EPA National Emission Standards for Hazardous Air Pollutants (NESHAP, 40 CFR Part 61, Subpart M)

Environmental Protection Division. (2019, November 16). Asbestos.

https://epd.georgia.gov/about-us/land-protection-branch/asbestos

2 References provided herein are not intended to be all inclusive relative to the report and are provided for informational purposes only.

https://www.wbdg.org/FFC/EPA/EPACRIT/epa_560585024.pdf https://cfpub.epa.gov/si/si_public_record_Report.cfm?Lab=ORD&dirEntryID=43798 https://www.nist.gov/system/files/documents/nvlap/EPA-600-R-93-116.pdf https://epd.georgia.gov/about-us/land-protection-branch/asbestos

5555 N. Lake Drive

Lake City, Clayton County, Georgia

CLAMB-23-GA-07614-01

9.0 LIMITATIONS

The conclusions presented in this Asbestos are based on the laboratory results and condition of the materials identified. Asbestos concentrations will vary between sample locations. Our assessment of the materials at the Project Site is a professional opinion arrived at through the method and procedures accepted by and standard to the industry. No other warranty or guarantee is expressed or implied.

Representative areas of the Project Site were sampled on a limited basis. Preparation of abatement design bid documents or scopes of work for abatement, may require additional sampling and definition of the extent of the material. United Consulting shall not be held responsible for errors, miscalculations, assumptions, misinterpretations or other problems or liabilities arising from, or associated with, firms or individuals bidding on asbestos abatement work that rely solely, or in part, on this document.

This report has been prepared on behalf of the client. Should any other person, partnership, or corporation desire to rely upon this report, it will be necessary for United Consulting to update the report for the new user.

UNITED CONSULTING

TABLES

TABLE 1 - SUMMARY OF ASBESTOS TEST RESULTS

Sample No. Component Location Friability Asbestos (%)

Building A

A-1 Mirror Mastic Men’s RR Non-Friable ND

A-2 2 x 6 Ceiling Tile Storage Room Friable ND

A-3 2 x 6 Ceiling Tile Storage Room Friable ND

A-4 Roofing Paper Roof Non-Friable ND

A-5 Roofing Paper Roof Non-Friable ND

A-6 Roofing Paper Roof Non-Friable ND

Notes:

ND=Non-detect for asbestos fibers Bolded entries contain regulated concentrations of asbestos fibers.

FIGURES

Prepared: TE Title: Sample Location Plan

FIG 1 Checked: TB Project: Morrow/ Lake City Park Concession Building

Date: 8/3/23 Project No. CLABM-23-GA-07614-01

Scale: Not to Scale Client: Clayton County

APPENDIX A

Certifications3

3 Any notifications/permit applications to agencies that require certification information, provided herein, must be reviewed by United Consulting prior to formal submittal.

APPENDIX B

Laboratory Results and Chain of Custody

ANALYTICAL ENVIRONMENTAL SERVICES, INC.

27-Jul-23

Bulk Sample Summary Report

AES Job Number:

Project Number:Project Name:

Client Name:

LocationClient ID AES ID Asbestos Mineral Percentage Comments

2307M25

MORROW/LAKE CITY PARK CONCESSION BUILDING 07614-01

United Consulting Group Inc.

AMCH CR AN TR AC

3080 Presidential Drive

Atlanta,GA 30340

Tel :(770) 457-8177

Fax:(770) 457-8188 Report Date:

NDNDNDNDNDNDMen's RR mirror mastic2307M25

-001A A-1

Layer:

Paint included as binderNDNDNDNDNDNDStorage room 2x6 white CT2307M25

-002A A-2

Layer:

Paint included as binderNDNDNDNDNDNDStorage room 2x6 white CT2307M25

-003A A-3

Layer:

NDNDNDNDNDNDBlack roofing paper2307M25

-004A A-4

Layer:

NDNDNDNDNDNDBlack roofing paper2307M25

-005A A-5

Layer:

NDNDNDNDNDNDPavilion roofing paper2307M25

-006A A-6

Layer:

Note: CH=chrysotile, AM=amosite, CR=crocidolite, AC=actinolite, TR=tremolite, AN=anthophylite

ND = None Detected

For comments on the samples, see the individual analysis sheets.

AES,Inc. is accredited by NIST’s National Voluntary Laboratory Accreditation Program (NVLAP) for Polarized Light Microscopy (PLM) analysis, Lab

Code 102082-0. All analyses performed in accordance with EPA “Interim Method for the Determination of Asbestos in Bulk Insulation Samples” (EPA

600/M4-82-020), 1982 as found in 40 CFR, Part 763, Appendix E to Subpart E and “Method for the Determination of Asbestos in Bulk Building

Materials” (EPA/600/R-93/116), 1993.

These test results apply only to those samples actually tested, as submitted by the client. All percentages are reported by visually estimated volume.

PLM is not consistently reliable in detecting small concentrations of asbestos in floor tiles and similar nonfriable materials, quantitative TEM is currently the only method that can be used to determine conclusive asbestos content. Interpretation and use of test results are the client ’s responsibility.

Laboratory liability is limited to the cost of analysis. This report must not be used to claim, and does not imply product certification, approval, or endorsement by NVLAP or any agency of the Federal Government.

This report must not be reproduced except in full without written approval of Analytical Environmental Services , Inc

Microanalyst: QC Analyst:

Svetlana ArkhipovYelena Khanina

End of Report

APPENDIX C

Georgia Asbestos Project Notification Fact Sheet

Georgia Asbestos Project Notifications – Just the Basic Facts

Abatement, Encapsulation, Renovation, Blanket and Completion Notifications Renovation/Abatement Only*: Where the project only involves the removal and disposal of ACM. “Renovation” means the altering of, taking out, stripping, clean up, disposal of, or removal of 10 square feet or 10 linear feet or more of friable or potentially friable ACM from any facility, facility component or residential dwelling.

Renovation/Abatement Prior to Demolition*: Removal/abatement of friable ACM equal to or greater than 10 square feet or 10 linear feet in preparation for demolition activities to be performed after abatement. Notification for demolition projects must be submitted by the contractor performing those activities. If demolition activities are performed after renovation/abatement activities, please submit a separate PROJECT NOTIFICATION FOR DEMOLITION PROJECTS.

Encapsulation*: A project in which special coatings approved for asbestos encapsulation will be used to cover the ACM and prevent release of asbestos fibers. “Encapsulation” means the process of coating, binding, or resurfacing walls, ceilings, pipes, or other structures with a sealant to prevent friable asbestos from becoming airborne.

Blanket: Solely for use on single large facilities where multiple small abatement projects (less than 160 square feet, 260 linear feet, or 35 cubic feet of friable ACM) are to be conducted, but where the total amount of abatement work will exceed these parameters. Effective for one calendar year (January through December). A separate 10-day project notification and fee must be submitted when any single project exceeds the parameters.

Completion: To be submitted once the removal/abatement or encapsulation work is complete.

* SUBMIT NOTIFICATION 10 WORKING DAYS BEFORE START OF PROJECT

Residential fee: $0.10 per LF/SF ($25 min - $50 max) Non-Residential fee: $0.10 per LF/SF ($25 min - $1000 max)

Disclaimer: If you or your firm perform renovation or repair work, including ASBESTOS ABATEMENT, on target housing (built before 1978) OR child-occupied facilities (built before 1978), then you and your firm are required to become a GA-

Certified RRP Firm & Renovator to “advertise to, agree to or perform” work or services on these types of facilities. See Georgia's Lead Renovation, Repair and Painting (RRP) Rule for more detail.

Demolition Notifications Demolition Only*: Where the project only entails demolition of any structure that has been thoroughly inspected for the presence or absence of asbestos. "Demolition" means the wrecking or taking out of any load supporting structural member of a facility together with related handling operations, or the intentional burning of any structure.

A demolition notification is required regardless of the presence or absence of ACM. For joint Renovation/ Demolition Projects or Renovation/Abatement Prior To Demolition Projects, please submit the demolition notification AND a separate project notification for the asbestos abatement, encapsulation, and/or renovation.

Ordered Demolition: A demolition project ordered by a government agency. If the property has been condemned, the Order of Condemnation must be included with the project notification.

* SUBMIT NOTIFICATION 10 WORKING DAYS BEFORE START OF PROJECT

Courtesy Notifications Courtesy: Where the project involves removal/abatement, disturbance or encapsulation of non-friable ACM, less than 10 square feet or 10 linear feet of friable ACM or any quantity of ACM work being performed by the legal owner of the property. If demolition activities are performed after abatement/removal activities, please submit a separate

PROJECT NOTIFICATION FOR DEMOLITION PROJECTS.

Inspections and Disposal Information

Do I Need an Inspection? For demolition, yes. For renovation/abatement, yes, unless the suspect material is assumed to be asbestos-containing material (ACM) and is handled as such. You cannot assume any suspect material to be non-asbestos-containing. Inspections need to occur in buildings of any construction age.

Removal: Any ACM found that is friable or will become friable must first be removed by a Licensed Asbestos Abatement Contractor. A Project Notification must be submitted to the GA EPD if 10 square feet or 10 linear feet or more of ACM is removed.

Disposal: All ACM (friable and non-friable) waste must be packaged properly in leak-tight containers, labeled, transported in an enclosed vehicle and disposed of in a landfill permitted to accept ACM waste. Disposal rules apply at any quantity.

How to Submit Notifications:

You must create a Georgia EPD Online System (GEOS) account:

https://geos.epd.georgia.gov/ga/geos/public.

Need Help Creating Your GEOS Account?

For a step-by-step guideline, visit:

https://epd.georgia.gov/asbestos.

Contact Us: Duty officer line 404-363-7026 available Mon-Fri 8:00am - 4:30pm or https://epd.georgia.gov/asbestos. Feb-19

No Fee

No Fee https://geos.epd.georgia.gov/ga/geos/public

COVER PAGE
COVER LETTER
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY
2.0 CERTIFICATIONS
3.0 INTRODUCTION
4.0 DESCRIPTION OF FACILITIES
5.0 INACCESSIBLE AREAS/LIMITING CONDITIONS
6.0 ASBESTOS SURVEY
7.0 CONCLUSIONS
8.0 REFERENCES AND ADDITIONAL RESOURCES
9.0 LIMITATIONS
TABLES
FIGURES
APPENDIX A - Certifications
APPENDIX B - Laboratory Results and Chain of Custody
APPENDIX C - Georgia Asbestos Project Notification Fact Sheet

File details come from the government source that posted it. Updated .