This document is a groundwater testing report from CTL|Thompson, Inc. for the Power Trail Underpass project in Fort Collins, Colorado, prepared for OTAK, an engineering firm. The report details groundwater testing performed on a sample recovered from piezometer TH-1, with testing methods focused on gasoline (GRO – TVPH) and diesel (DRO – TEPH) range petroleum constituents. The testing was conducted for planning purposes related to potential dewatering needs for construction, with the sample collected on July 7, 2023, and analyzed by Technology Laboratory, Inc. on July 11-12, 2023.

The laboratory analysis results show that both DRO (TEPH) and GRO (TVPH) levels were below the minimum detection limit of 0.5 mg/L, using EPA methods 8015B and 8260B respectively. CTL|Thompson noted that the piezometer was originally installed for geotechnical purposes, and strict environmental installation techniques were not employed, which may potentially impact the testing results. Despite this caveat, proper sampling and transport protocols for environmental sampling were followed during the testing program.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441

July 13, 2023

Per your request, CTL|Thompson, Inc. groundwater tests were performed on a sample recovered from piezometer TH-1 at the above referenced project. We understand the testing is for planning purposes related to potential dewatering needs for construction. Testing methods included gasoline (GRO – TVPH) and diesel (DRO – TEPH) range petroleum constituents. The results of testing are included with this letter.

Per our discussion, you understand that the piezometer was installed for geotechnical purposes and strict environmental installation techniques were not performed, which may or may not have an impact on the testing results. Proper sampling and transport protocols for environmental sampling were followed for this testing program.

We appreciate the opportunity to work with you on this project. If you have any additional questions or concerns, please contact the undersigned.

Sincerely, CTL|THOMPSON, INC.

R.B. “Chip” Leadbetter, III, PE Senior Engineer

OTAK

371 Centennial Parkway, Suite 210 Louisville, Colorado 80027

Attention: Dan Beltzer, P.E.

Subject: Groundwater Testing Power Trail Underpass

Fort Collins, Colorado CTL|T Project Number: FC10823-112

FIGURE 1: BORING LOCATION

OTAK

POWER TRAIL UNDERPASS

CTL | T PROJECT NO. FC10823-112

TECHNOLOGY LABORATORY, INC.

CENTRE PROFESSIONAL PARK

1012 Centre Avenue Fort Collins, Colorado 80526

(970) 490-1414

CERTIFICATE OF ANALYSIS

CTL Thompson 351 Linden Street Fort Collins, CO 80524

Sampled: 07/07/23

Received: 07/07/23

Laboratory ID: C5376-01

Sample ID: TH-1 Project No.: FC 10823-125

Matrix: Water

ParameterNumber Result Units Method Analyzed CAS Date

MDL

DRO (TEPH)N/A < 0.5 mg/L EPA-8015B 07/12/230.5

GRO (TVPH)N/A < 0.5 mg/L EPA-8260B 07/11/230.5

The results contained in this report relate only to those items tested.

2023-07-13T11:22:52-0600
Chip Leadbetter