This document is a groundwater testing letter from CTL|Thompson, Inc. to OTAK, concerning the Power Trail Underpass project located in Fort Collins, Colorado. The letter documents a groundwater monitoring study performed on May 18th, with drilling conducted at a specific location marked as TH-1 on Figure 1. CTL|Thompson provides groundwater measurements from piezometers at the site, tracking measurements on 5/18/23, 6/12/23, 7/7/23, and 8/31/23, with the TH-1 location showing progressively decreasing groundwater levels from 19 to 15.8 over that time period.

The document includes a detailed site map (Figure 1) showing the boring location in relation to Harmony Road, Innovation Drive, and Oakridge Drive. The project is identified with the CTL|T Project Number FC10823-112, and the letter is signed by R.B. "Chip" Leadbetter, III, PE, Senior Engineer. The purpose appears to be providing ongoing groundwater monitoring data for the underpass project, with the measurements potentially informing construction or environmental considerations for the site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441

September 1, 2023

OTAK

371 Centennial Parkway, Suite 210 Louisville, Colorado 80027

Attention: Dan Beltzer, P.E.

Subject: Groundwater Testing Power Trail Underpass Underpass Fort Collins, Colorado CTL|T Project Number: FC10823-112

Per your request, CTL|Thompson, Inc. has performed a groundwater monitoring study at the above referenced project. Drilling was performed on May 18th at the location shown on Figure 1. This letter presents the most recent groundwater measurements from piezometers at the site.

5/18/23 6/12/23 7/7/23 8/31/23

TH-1 19 16.4 16.7 15.8

We appreciate the opportunity to work with you on this project. If you have any additional questions or concerns, please contact the undersigned.

Sincerely, CTL|THOMPSON, INC.

R.B. “Chip” Leadbetter, III, PE Senior Engineer