Exhibit G (Source Narrative)Final.pdf
PDF 19 MB Posted
- Attached to
- Identifier Quarry Chip Rock Production
- Solicitation number
- S-73000-00008646
- Issued by
- Wasco County, Siletz City, Oregon
About this file
This document appears to be an Exhibit G (Source Narrative) related to a state and local contract opportunity for the production of 7,500 CY of specified aggregate, including blasting, stockpiling, and associated work, in Deschutes County and the City of Bend, Oregon. The project requires the successful bidder to provide the specified aggregate materials and associated services. The document does not provide details on response due dates, site visits, bidder's meetings, award dates, or contract term.
The document does not contain information on pricing terms, set asides, incumbents, funding requirements and sources, or other salient commercial details. It focuses primarily on the technical requirements of the project, without providing additional contextual information about the procurement process or commercial terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35858 Bid_Cover_Sheet_fnl.docx | DOCX document | |
| Exhibit A (Specifications).pdf | ||
| Exhibit B (Plans).pdf | ||
| 35858 Intent To Award.xlsx | XLSX spreadsheet | |
| 35858 Preliminary Results.xlsx | XLSX spreadsheet | |
| 35751_Addenda_1_Final.pdf | ||
| 35858_ITB_fnl.docx | DOCX document | |
| 35858_Sample_Contract_fnl.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Transportation Region 4 Project Delivery 63055 N Hwy 97, Bldg M
Bend, OR 97701 Phone: (541) 388-6225
Fax: (541) 385-0476 DATE: October 18, 2023
TO: Dan Shanahan District 9 Manager
Scott Peters District 10 Assistant Manager - Moro
Ramon Alonso CES-3, Construction
FROM: Bobbi Jean Cummiskey, C.E.G.
Region 4 Engineering Geologist
REVIEWED BY: Russell G. Frost, C.E.G.
Region 4 Geo/Environmental Manager
SUBJECT: District 9 Chip Seal
RE: Material Source Narrative Identifier Quarry ODOT Source #OR-33-053-4
DOGAMI #33-0024
US 97 - MP 61.74
Wasco County
This memo and attachments should be duplicated and distributed to all bidders that inquire about the material sources, as per Section 00120.25 of the Oregon Standard Specifications for Construction, 2024 ed. This material source is an ODOT owned source of aggregate materials.
For this project, the Identifier Quarry is being offered as a prospective source for the production of aggregate materials including excavation, processing and stockpiling of the aggregate material. Aggregate production activities are limited to day light hours Monday through Saturday.
October 18, 2023 Page | 2
The prospective material source is an existing rock quarry known as Identifier Quarry and is located in the SW¼ SW¼ NW¼ of Section 5 and the S½ NE¼ of Section 6, T. 7 S., R. 16 E., W.M., in Wasco County. This site is located at MP 61.74 on The Sherman Highway (US97).
Access to the site is adjacent south to the highway.
The current development plan for this source was prepared based upon the estimate of the current project requiring approximately 7,500 cubic yards of chip seal aggregate. The excavation area shown on the plan sheet GE01 Prospective Material Source within the Contract plans contains adequate material necessary to complete the project with the above proposed quantity. The excavation area was also designed to prepare the quarry for future projects.
As per Oregon Standard Specifications for Construction, Section 00120.15 Examination of Work Site and Solicitation Documents; Consideration of Conditions to be Encountered, Contractors shall carefully examine the available information for the material source, and become familiar with the existing conditions, the appearance of the site, and the conditions they expect to encounter prior to bid submittal.
Source Geology Identifier Quarry is mapped as Tcr, Grande Ronde Basalt formation.1 The Grande Ronde Basalt formation is one of the four main formations that comprise the Miocene Columbia River Basalt Group that forms the Deschutes-Columbia Plateau physiographic province. 2
Site Exploration Four drill holes were completed in November of 2017 within the proposed and future excavation areas to collect rock samples for laboratory testing. The drill logs and core photos are attached to this narrative. Drill hole locations are shown on sheet GE01 Prospective Material Source within the Contract plans. Rock core samples collected from the drilling were sent to the ODOT Materials Laboratory for aggregate compliance testing. The laboratory testing confirmed that the rock sampled is acceptable for use as ACP aggregate. Laboratory test results are attached.
Current Project-Specific Design The strategy for operations is to extend or develop access to the top of the quarry as shown.
The Contractor should use overburden stripped from the excavation area to construct and maintain the safety berms. If inadequate overburden exists, loose material from within the site can be used to enhance the safety berms.
Excavation and design strategy is to continue to move the existing quarry face to the east – south east, maintaining a constant pit floor elevation. The excavation plan is to excavate full width across the face and moving southeast to obtain the required quantity.
1Walker, George W. and MacLeod, Norman S., Geologic Map of Oregon, United States Geologic Survey, Denver, CO, 1991.
2Orr, E.L., W.N. Orr, and E.M. Baldwin. 2000. Geology of Oregon, 5th ed.
Kendall/Hunt Publishing Company, Dubuque, Iowa, p 157.
October 18, 2023 Page | 3
The operating special provisions in Section 00235 require the Contractor to use and process all material meeting quality requirements whether existing or loosened in the excavation area including oversize materials. This quarry does not have a history of producing oversize material, but special consideration should always be given to the preparation of the bid, taking into account the need to reduce all oversize material to a usable size. Special equipment or equipment setup may be necessary for size reduction of the existing or loosened and excavated material.
This operating plan will allow for removal of the required material to produce aggregate products for this project and leave the site in a condition that will allow for systematic development in the future. It is important that access to the top of excavated slopes be constructed properly and be maintained. The quarry floor must be left in a uniform and reasonably smooth and level condition.
Blasting Blasting specifications are described in Section 00235 of the Special Provisions and 00335 of the Standard Specifications. These specifications include providing the Project Manager with a blasting plan for review 14 days prior to drilling and blasting work. Written notification of blasting dates and times are to be provided to the Project Manager and nearby property owners and residences at least 48 hours in advance and again the day of the blast. A blasting report must also be submitted detailing the blast outcome within 48 hours of the blast.
Source Use History This ODOT-owned site was originally acquired in 1938 as a material source. Since acquiring ownership, the state has removed material from Identifier Quarry for ODOT maintenance projects and STIP construction projects. Example uses at the site include:
• 1979: 17,400 cy for the Shaniko - US 197 Junction preservation project
• 1992: 12,000 cy for the Shaniko – South Junction preservation project
• 1998: 23,135 cy for the Shaniko – US 197 S. Junction Section preservation project
• 2008: 10,000 cy for Maintenance use.
• 2019: 11,000 cy for Maintenance use.
Additional Information Documentation contained within this Material Source Narrative Packet is for informational purposes only. If additional information about the material source is desired, contact the Project Manager’s office. An appointment will be scheduled to view ODOT material source files and available core. Someone from the Geology staff must be present when the information is being reviewed; this is to assure accuracy and consistency in the distribution of information.
Attachments:
1. DOGAMI Permit
2. Wasco County Land Use
3. Drill Logs and Core Photos
4. Laboratory Analytical Testing Results
Identifier Quarry Core Photos
DH17-01 0.0 to 10.0 feet. DH17-01 10.0 to 20.8 feet.
DH17-01 20.8 to 29.0 feet. DH17-01 29.0 to 36.7 feet.
DH17-01 36.7 to 45.0 feet. DH17-01 45.0 to 50.0 feet.
DH17-02 0.0 to 12.7 feet. DH17-02 12.7 to 20.5 feet.
DH17-02 20.5 to 28.5 feet. DH17-02 28.5 to 36.3 feet.
DH17-02 36.3 to 44.0 feet. DH17-02 44.0 to 49.6 feet.
DH17-03 0.0 to 12.0 feet. DH17-03 12.0 to 20.5 feet.
DH17-03 20.5 to 29.0 feet. DH17-03 29.0 to 37.5 feet.
DH17-03 37.5 to 45.2 feet. DH17-03 45.2 to 50.0 feet.
DH17-04 0.0 to 12.2 feet. DH17-04 12.2 to 20.0 feet.
DH17-04 20.0 to 27.5 feet. DH17-04 27.5 to 35.0 feet.
DH17-04 35.0 to 44.0 feet. DH17-04 44.0 to 50.0 feet.
| 2023 Identifier Narrative.pdf |
| DOGAMI Permit_Identifier Quarry_2022.pdf |
| Pages from DOGAMI Permit.pdf |
| Attachements.pdf |
File details come from the government source that posted it. Updated .