This is a Contract Data Requirements List (CDRL) form DD 1423 for a technical report related to a TYAD (Tobyhanna Army Depot) On-Call Pick Up and Refinish of Parts contract. The document specifies the requirements for a Technical Report–Study/Services with Data Item Number A006, requiring the contractor to submit a Property Management System procedure within 60 days of contract award.

The form outlines detailed submission guidelines, including that the report must be typewritten on standard letter-size paper, include a title page, table of contents, and two primary sections: an introduction, summary, and conclusions (Section I), and a comprehensive description of analytic results (Section II). The preferred delivery method is electronically via Microsoft Office (2016 or later) format, with distribution limited to Department of Defense components. Subsequent submissions of the Property Management System procedures will require a cover letter and revision page indicating specific changes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024 Page 1 of 2

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

F

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

TYAD On-Call Pick Up and Refinish of Parts

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Technical Report–Study/Services

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Paragraph 1.45

6. REQUIRING OFFICE

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

E

10. FREQUENCY

One/R

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

60DAC

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

The Property Management Plan provided at solicitation is in accordance with FAR 45.201 (c)(4) shall be a description of the property management system to be used in managing Government property. The Contractor shall submit the Property Management System procedures in accordance with FAR 52.245-1(f) within 60 days of award. Changes thereafter to the Property Management System procedures must be approved by the Government Property Administrator prior to implementation.

Block 9: Distribution Statement E: Distribution authorized to the Department of Defense Components only; Administrative or Operational Use. Other request shall be referred to:

Organization Office Symbol Title City, ST Zip Code

Block 13: Subsequent submissions are due 30 working days after Government direction or after contractor initiated revisions to the Property Management System. Any changes to the Property Management System after first submission shall require a cover letter and a revision/change page by section and subparagraph indicating changes.

Block 14: The preferred method of delivery shall be electronically in Microsoft Office (2016 or later) format via email.

Contracting Officer 1

15.TOTAL 2

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. SIGNATURE I. APPROVED BY J. SIGNATURE

Property Management System Procedures

DI-MISC-80508B

Property Administrator 1

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024 Page 2 of 2

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

DATA ITEM DESCRIPTION

Title: Technical Report–Study/Services

Number: DI-MISC-80508B Approval Date: 14 Nov 2006 AMSC Number: 7633 Limitation: N/A DTIC Applicable: Yes Defense Technical Information Center (DTIC), 8725 John J. Kingman Rd.

Suite. 0944, Fort Belvoir, VA 22060-6218 GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship: A technical report provides fully documented results of studies or analysis performed.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID supersede DI-MISC-80508A

Requirements:

1. Reference documents. None.

2. Format.

(a) The report and all attachments shall be typewritten, or otherwise clearly lettered, and shall be duplicated using non-fading ink.

(b) Text shall be prepared on standard letter size paper (8 ½ x 11”) .

(c) When attachments are included, they shall be fully identified, referenced in the text, and folded to conform to the size paper used in the report.

(d) Security classification and distribution markings shall conform to the requirements of the contract, purchase description and security requirements checklist, as applicable.

Source: http://assist.dla.mil -- Downloaded: 2025-04-28T11:19Z

Check the source to verify that this is the current version before use.

DI-MISC-80508B

3. Contents.

(a) Title Page – Identifies the report by providing contract number, project name or purchase description title, task number, and reporting period.

(b) Table of Contents.

(c) Section I – Includes the following:

(1) Introduction

(2) Summary – A brief statement of results obtained for the analytic effort.

(3) Conclusions and their condensed technical substantiation’s.

(d) Section II – A complete and detailed description of the analytic results which led to the conclusions stated in Section I above.

4. END OF DI-MISC-80508B

Source: http://assist.dla.mil -- Downloaded: 2025-04-28T11:19Z

Check the source to verify that this is the current version before use.

Exhibit F- CDRL_DID A006.pdf
PMS CDRL DD1423-1 (1).pdf
CB7AF80F8173469580F0A51438D3D735
DATA ITEM DESCRIPTION
Requirements:

dd1423_A001(2).pdf

2025-04-28T08:32:34-0400
VASS.JACQUELINE.STONE.1229030155
2025-04-28T09:00:15-0400
COSTANZO.JOSEPH.T.1243878361

File details come from the government source that posted it. Updated .