EXHIBIT E Tenant Improvements Cost Summary TICS Table.xlsx
XLSX spreadsheet 564 KB Posted
- Attached to
- Utuado rural clinic
- Solicitation number
- 36C24825R0124
About this file
This file is a Tenant Improvements Cost Summary (TICS) Excel template used for estimating construction costs associated with federal lease proposals. The template is organized according to MasterFormat CSI divisions and provides structured sections for pricing both tenant improvement (TI) work and shell construction elements across 33 construction divisions including general requirements, existing conditions, concrete, masonry, metals, finishes, HVAC, electrical, lighting, communications, and security systems.
The template includes functionality for calculating costs per ABOA (ANSI-BOMA Office Area) square foot and RSF (Rentable Square Foot), with provisions for general contractor fees, architectural and engineering fees, lessor project management fees, and other lessor costs. It also incorporates Building Specific Amortized Capital (BSAC) costs for security-related improvements. The shell definition follows GSA Pricing Desk Guide standards for general use buildings, specifying requirements such as broom-clean concrete floors, completed base building systems, suspended acoustical ceilings with lighting at one fixture per 80 square feet, and HVAC systems providing 0.75 CFM per square foot. Each division worksheet includes fields for material descriptions, quantities, units, costs, labor hours, and rates. The template is currently blank with all cost fields showing zero values, ready for project-specific cost input by lessors responding to the related VA lease solicitation for the Utuado rural clinic in Puerto Rico.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TICS
| TENANT IMPROVEMENTS COST SUMMARY (TICS) | Version Oct. 2024 | ||
| For: | - | ABOA SF= | - 0 |
| Agency: | - | TIA PER ABOA SF= | $ - 0 |
| Location: | - | TOTAL TIA= | $ - 0 |
| Common Area Factor: | - | RSF= | - 0 | |
| Masterformat CSI | System Elements | TI* | SHELL** | |
| Div 1 | General Requirements | $ - 0 | $ - 0 | |
| Div 2 | Existing Conditions | $ - 0 | $ - 0 | |
| Div 3 | Concrete | $ - 0 | $ - 0 | |
| Div 4 | Masonry | $ - 0 | $ - 0 | |
| Div 5 | Metals | $ - 0 | $ - 0 | |
| Div 6 | Wood, Plastics, Composites | $ - 0 | $ - 0 | |
| Div 7 | Thermal and Moisture Protection | $ - 0 | $ - 0 | |
| Div 8 | Openings | $ - 0 | $ - 0 | |
| Div 9 | Finishes | $ - 0 | $ - 0 | |
| Div 10 | Specialties | $ - 0 | $ - 0 | |
| Div 11 | Equipment | $ - 0 | $ - 0 | |
| Div 12 | Furnishings | $ - 0 | $ - 0 | |
| Div 13 | Special Construction | $ - 0 | $ - 0 | |
| Div 14 | Conveying Equipment | $ - 0 | $ - 0 | |
| Div 21 | Fire Suppression | $ - 0 | $ - 0 | |
| Div 22 | Plumbing | $ - 0 | $ - 0 | |
| Div 23 | Heating, Ventilating, and Air Conditioning (HVAC) | $ - 0 | $ - 0 | |
| Div 26.1 | Electrical | $ - 0 | $ - 0 | |
| Div 26.2 | Lighting | $ - 0 | $ - 0 | |
| Div 27 | Communications | $ - 0 | $ - 0 | |
| Div 28.1 | Electronic Safety | $ - 0 | $ - 0 | |
| Div 28.2 | Electronic Security (TI - Non-BSAC) | $ - 0 | $ - 0 | |
| Div 31 | Earthwork | $ - 0 | $ - 0 | |
| Div 32 | Exterior Improvements | $ - 0 | $ - 0 | |
| Div 33 | Utilities | $ - 0 | $ - 0 | |
| Subtotal | Trade Costs | $ - 0 | $ - 0 | |
| General Contractor Fee | Percent | $ - 0 | $ - 0 | |
| Subtotal | Construction Costs | $ - 0 | $ - 0 | |
| Architectural & Engineering Fees (NIC DID costs) *** | Percent | $ - 0 | $ - 0 | |
| Other Lessor Costs Established Under the Lease | $ - 0 | $ - 0 | ||
| Subtotal | Lessor's Costs: | $ - 0 | $ - 0 | |
| Lessor's Project Management Fee | Percent | $ - 0 | ||
| Total | Price to Government: | GRAND TOTAL | $ - 0 | |
| Cost per ABOA SF | $ - 0 | $ - 0 | ||
| Cost per RSF | $ - 0 | $ - 0 | ||
| Notes: | ||||
| * | Include all subcontractors' costs. | |||
| ** | Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information. | |||
| *** | Not subject to Lessor's project management fee. |
| BSAC SUMMARY | |||
| BSAC | Building Specific Amortized Capital Costs | $ - 0 | |
| BSAC Architectural & Engineering Fees | Percent | $ - 0 | |
| BSAC Lessor's Project Management Fee | Percent | $ - 0 | |
| Total | BSAC Costs and Fees | TOTAL | $ - 0 |
| Cost per ABOA SF | $ - 0 | ||
| Cost per RSF | $ - 0 |
Page &P
INSTRUCTIONS
| INSTRUCTIONS | ||
| Read and understand 'SHELL' tab. | ||
| Input project specific information as appropriate in the light blue fields of the 'INPUT' worksheet, in order to auto-populate the TICS worksheet. This includes ANSI-BOMA Office Area (ABOA) square footage, General Contractor Fee, Lessor's Project Management Fee, and A/E Fees. Note that some of these fees are already established under the lease agreement and must be used when completing this worksheet. | ||
| Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below. | ||
| Material | ||
| Description | Accurately describe each item being priced. | |
| Quantity | List the quantity e.g., 1, 2, 3, etc. | |
| Unit | (Example) LS,EA,GAL,LF, SF, etc. | |
| Cost | Amount per one unit | |
| Total | Total cost of all material. | |
| Labor | ||
| Hours | Time projected to perform the task. | |
| Labor Rate | Cost per hour of labor. | |
| Total | Cost of labor. | |
| TOTAL Combines overall materials and labor. |
Tenant Improvements (TI)
TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.
1. Fill out light blue fields categorized Tenant Improvements (TI), inputting only costs associated with TI.
2. Fill each division tab 1-33 as needed for the construction to be performed under the TI costs as indicated above.
Shell
1. Fill out light blue fields categorized SHELL, inputting only costs associated with shell as defined in the 'SHELL' tab.
2. Fill each division tab 1-33 as needed for the construction to be preformed under the SHELL cost as indicated above.
| DIVISION 9 - FINISHES | FOR: | DATE PREPARED: | |||||
| Project or Lease # | 1/1/22 | ||||||
| Tentant Improvement (TI) Cost Estimate for Division 9 | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| XYZ Paint | 1.00 | GAL. | $25.00 | $25.00 | 2.50 | $36.25 | $90.63 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| Material Total: | $25.00 | Labor Total: | $90.63 | ||||
| TOTAL TI MATERIAL & LABOR: | $115.63 | ||||||
| Shell Cost Estimate for Division 9 | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| ABC Paint | 10.00 | GAL. | $27.00 | $270.00 | 6.00 | $36.25 | $217.50 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| Material Total: | $270.00 | Labor Total: | $217.50 | ||||
| TOTAL SHELL MATERIAL & LABOR: | $487.50 |
Building Specific Amortized Capital (BSAC)
BSAC is used for the build-out of security-related improvements, most commonly listed on a 'Security Requirements' attachment.
1. Because Architectural & Engineering Fees and Lessor's Project Management Fees apply to BSAC as well as Tenant Improvement costs, this form includes opportunities to include BSAC pricing in order to capture a comprehensive fee evalutation. Fees identified as having a percentage basis for TI costs on the INPUT tab will automatically be applied to BSAC costs as well on the TICS tab, if applicable.
2. BSAC elements are traditionally itemized on a Security Unit Price List form. Enter the 'Total Costs' value from that form on the BSAC tab as instructed on the page. If a Security Unit Price List is not available and/or a more detailed examination of BSAC costs is desired, the BSAC tab can also itemize costs.
SHELL
| Per GSA Pricing Desk Guide, 5th Edition. | |
| Table 2-4. Shell Definition for General Use Buildings | |
| Base Building | Occupant Areas |
Base structure and building enclosure components (windows with exterior finishes) are complete.
Broom-clean concrete floor slab, with a flat and level floor.
Base building mechanical, electrical and plumbing systems (e.g., central fire alarm, chiller plant, cooling tower) are complete and functional.
Gypsum wallboard, spackled and prime painted, on exterior perimeter walls and tenant demising walls, without suite entry door.
All common areas, such as lobbies, elevators, fire egress corridors and stairwells, garages, and service areas are complete. (Circulation corridors are provided as part of the base building only on multi- tenanted floors where the corridor is common to more than one tenant. On single tenant floors, only the fire egress corridor necessary to meet code is provided as part of the shell.)
Suspended acoustical ceiling system including grid and lay-in tiles (or other building standard). Lighting luminaires should be installed in the ceiling grid for an open office plan at the rate of one fixture per 80 USF.3 Lighting controls with ambient lighting adjusted per daylight availability, occupancy, vacancy, or other building automation system signals.
Building common restrooms are complete and operational.
Building cores on each floor with assignable space contain the following: tappable domestic water riser, service sanitary drain, sanitary vent, ready for extension to tenant- demised areas.
Electrical power distribution panels and circuit breakers available in an electrical closet, with capacity at 120/208 volt, 3- phase, 4-wire providing 4 watts per USF excluding lighting and HVAC.
Designated connection point to the central fire alarm system for extension to tenant- demised areas.
Distribution backboard within a wire closet for connection to tenant’s telephone lines. Vertical conduit (empty sleeve) through building core, available for tenant wiring and cabling.
Central heating, ventilation, and air conditioning (HVAC) systems are installed and operational, including, as appropriate, main and branch lines, variable air volume boxes, dampers, flex ducts and diffusers, for open office layout. Conditioned air through medium pressure ductwork at a rate of .75 cfm per square foot of usable area is provided.
Sprinkler mains and distribution piping in a protection layout (open plan) with heads turned down, concealed with an escutcheon or trim plate, are installed.
INPUT
| INFORMATION NEEDED TO COMPLETE TICS TABLE | FALSE | |||||
| FALSE | ||||||
| LEASE GS-XXP-LXXXXXXX or Project | FALSE | |||||
| Agency | FALSE | |||||
| Location: City, State | FALSE | |||||
| FALSE | ||||||
| ABOA SF = | General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum. | |||||
| TENANT IMPROVEMENT ALLOWANCE PER ABOA SF = | ||||||
| RSF= | ||||||
| DATE: | ||||||
| Basis | Amount | |||||
| Tenant Improvement General Contractor Fee | percent | Enter percent values as decimals. Ex: 0.06 for 6.00% | ||||
| Shell General Contractor Fee | percent | |||||
| Tenant Improvement A/E Fees (per Lease) | percent | |||||
| Shell A/E Fees | percent | For A/E fees established as a cost per ABOA sf, convert rate to lump sum. | ||||
| Lessor's TI Project Management Fee (per Lease) | percent | |||||
| StevenTFreund: Request for Lease Proposals requires a percentage basis for TI and BSAC project management fee. | percent | |||||
| TI | Shell | lump sum | ||||
| Other Lessor Costs Established Under the Lease |
If BSAC is applicable, 'Amount' values entered above for TI fees that have a 'percent' basis will automatically be applied to BSAC on the TICS tab. 'Lump Sum' basis amounts will NOT be applied twice; 'lump sum' basis amounts entered above should consider the full scope of both TI and BSAC and will only be displayed once on the TICS tab.
BSAC
BUILDING SPECIFIC AMORTIZED CAPITAL (BSAC) FOR: DATE PREPARED:
| Building Specific Amortized Capital (BSAC) Cost Estimate (Most commonly itemized on a Security Unit Price List.) | ||
| Select Method of BSAC Inclusion: | N/A | ← Click if entering BSAC values |
| If entering BSAC values, select method from cell F4 dropdown list. |
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL BSAC MATERIAL AND LABOR: | $ - 0 |
Division 1 - General Requirements FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 1 (examples: superintendence, mob/demob, dust control, waste & dumpsters, temporary barriers & barricades) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 1 (examples: superintendence, mob/demob, dust control, waste & dumpsters, temporary barriers & barricades) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
Division 2 - Existing Conditions FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 2 (examples: site work, demolition) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 2 (examples: demolition, survey, geotech, HAZMAT) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
Division 3 - Concrete FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 3 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 3 (examples: foundations, columns, flatwork, beams) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
Division 4 - Masonry FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 4 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 4 (examples: brick, block) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
Division 5 - Metals FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 5 (examples: structural, grates, decking, joists, stairs, railings, custom fabrications) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 5 (examples: structural, grates, decking, joists, stairs, railings, custom fabrications) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 6 - WOOD, PLASTICS, COMPOSITES FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 6 (examples: wood framing, rough carpentry, sheathing, millwork, decking, paneling, stairs & railings) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 6 (examples: wood framing, rough carpentry, sheathing, millwork, decking, paneling, stairs & railings) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 7 - THERMAL & MOISTURE PROTECTION FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 7 (examples: roof Penetration/Patching, firestopping, joint sealants, caulking, dampproofing, insulation, weather barriers) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 7 (examples: roof Penetration/Patching, firestopping, joint sealants, caulking, dampproofing, insulation, weather barriers) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 8 - OPENINGS FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 8 (examples: doors, frames, hardware, louvers, windows, glazing, curtainwall) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 8 (examples: doors, frames, hardware, louvers, windows, glazing, curtainwall) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 9 - FINISHES FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 9 (examples: painting, carpeting, flooring & base, wall protection, walls) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 9 (examples: painting, carpeting, flooring & base, wall protection, walls) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 10 - SPECIALTIES FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 10 (examples: displays, signage, directory boards, movable partitions, wall and door protection, lockers, flagpoles, storage assemblies) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 10 (examples: displays, signage, directory boards, movable partitions, wall and door protection, lockers, flagpoles, storage assemblies) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 11 - EQUIPMENT FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 11 (examples: AV, lab, recreational, food, banking, medical, retail, parking, loading dock, and other equipment) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 11 (examples: AV, lab, recreational, food, banking, medical, retail, parking, loading dock, and other equipment) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 12 - FURNISHINGS FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 12 (examples: decorations, systems and office funiture, casework, countertops) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 12 (examples: decorations, systems and office funiture, casework, countertops) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 13 - SPECIAL CONSTRUCTION FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 13 (examples: pre-engineered & prefab structures) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 13 (examples: pre-engineered & prefab structures) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 14 - CONVEYING EQUIPMENT FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 14 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 14 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 21 - FIRE SUPPRESSION FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 21 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 21 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 22 - PLUMBING FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 22 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 22 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 23 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 23 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
26.1
DIVISION 26.1 - ELECTRICAL FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 26.1 (examples: conduit, wire, supports, boxes, fittings, terminations, outlets, cover plates, receptacles, power devices, panels & breakers, electrical equipment) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 26.1 (examples: conduit, wire, supports, boxes, fittings, terminations, outlets, cover plates, receptacles, power devices, panels & breakers, electrical equipment) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
26.2
DIVISION 26.2 - LIGHTING FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 26.2 (examples: lighting fixtures, wall switches, motion switches) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 26.2 (examples: lighting fixtures, wall switches, motion switches) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 27 - COMMUNICATIONS FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 27 (examples: Low Voltage cabling (CAT6, POE, Coax, HDMI, speaker), overhead speakers/intercom, sound-masking/white noise devices, jacks, punchdown, cover plates, cable trays/j-hooks, server racks (conduit & boxes see Div 26.1)) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 27 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
28.1
DIVISION 28.1 - ELECTRONIC SAFETY FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 28.1 (examples: Fire Alarm Only: wire, devices, smokes, heats, CO2, exit signs, addressing & testing) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 28.1 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
28.2
DIVISION 28.2 - ELECTRONIC SECURITY FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 28.2 (examples: duress, IDS, motion, video surveillance systems, CCTV, security scanning, glass break, alarm devices) SHOULD NOT include items required/itemized as BSAC on a Security Unit Price List, provided separately, or the BSAC tab on this form. SHOULD include items labeled TI on a Security Unit Price List. | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 28.2 SHOULD NOT include items required/itemized as BSAC on a Security Unit Price List, provided separately if necessary. SHOULD include items labeled SHELL on a Security Unit Price List. | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 31 - EARTHWORK FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 31 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 31 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
cornerstone
DIVISION 32 - EXTERIOR IMPROVEMENTS FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 32 | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | ||||||
| SHELL Cost Estimate for Division 32 (examples: site, civil, pavements, landscaping, walks, pedestals, fences, gates, permanent vehicle barriers, foundations, earthwork) | |||||||
| DESCRIPTION | MATERIAL | LABOR | |||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | |
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | ||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
DIVISION 33 - UTILITIES FOR: DATE PREPARED:
| Tentant Improvement (TI) Cost Estimate for Division 33 | ||||||||
| DESCRIPTION | MATERIAL | LABOR | ||||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | ||
| Describe first item here | 1.00 | (ex: LF) | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | s | ||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | |||||
| TOTAL TI MATERIAL AND LABOR: | $ - 0 | |||||||
| SHELL Cost Estimate for Division 33 | ||||||||
| DESCRIPTION | MATERIAL | LABOR | ||||||
| QUANTITY | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | ||
| 1.00 | $0.00 | $0.00 | 1.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| MATERIAL TOTAL: | $ - 0 | LABOR TOTAL: | $ - 0 | |||||
| TOTAL SHELL MATERIAL AND LABOR: | $ - 0 |
image1.jpg image2.emf image3.emf image4.emf image5.emf image6.emf image7.emf image8.emf image9.emf image10.emf image11.emf image12.emf image13.emf image14.emf image15.emf image16.emf image17.emf image18.emf image19.emf image20.emf image21.emf image22.emf image23.emf image24.emf image25.emf image26.emf image27.emf
File details come from the government source that posted it. Updated .